LCLS Undulator Magnetic Measurements

Slides:



Advertisements
Similar presentations
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
Advertisements

Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Alexander Temnykh Cornell University, Ithaca NY, USA
Zachary Wolf Undulator Tuning November 12, Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Zack Wolf Quadrupole Fiducialization October 20, A Vibrating Wire System For Quadrupole Fiducialization Zack Wolf,
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
LCLS Prototype Undulator Design LCLS Prototype Undulator Design Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf Undulator Bench October 14, Undulator Bench Requirements Zack Wolf SLAC.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project – from the prototype to the full scale.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
Zack Wolf Undulator Magnetic April 11, 2006 LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Option – 5m Undulators What is the optimum length for an LCLS undulator?  XFEL is using 5m undulator segments.  Is this optimum?  What are the advantages.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
CLAS12 Torus Magnetic Field Mapping Torus Magnetic Field - qualitative look at the field distribution How well do we need to know the B-field? - momentum.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
SSRL EPU Magnetic Measurements Zachary Wolf March 15, 2013.
Magnetic Field optimization of EPU at TPS
Magnetic Measurements At SLAC
Overview Preparatory work at the MML BBA to define the reference orbit
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
CLAS12 Torus Magnetic Field Mapping
Magnetic Measurements For The LCLS Undulator System
LCLS Undulator Fiducialization
SCU Next Phase Meeting July 8, 2014.
CF Organization & Schedule
Relaxing Quads Roll Alignment tolerance
Phase Adjustments: K vs
Beam-Based Alignment Results
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Magnetic Measurements and Alignment at SLAC Robert Ruland & Zack Wolf
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
Undulator Tuning Status
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LCLS Undulator Tuning And Fiducialization
Undulator Assembly and Installation Planning
Undulator Alignment Plan
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
Presentation transcript:

LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon, Brendan Dix, Scott Jansson, Dave Jensen, Luis Juarez, Seva Kaplounenko, Yurii Levashov, Wei Wang, Achim Weidemann

Undulator Tuning, General Approach Use ANL and DESY experience Techniques have been developed at ANL and DESY which work very well. We will use the best of the ANL and DESY measurement techniques as our starting point (both have been very generous in sharing with us). We need to adapt for production measurements.

SLAC Magnetic Measurement Facility Floor plan divided into three functional areas Magnetic Measurements (± 0.1º C) Fiducialization and Assembly (± 1º C) Storage (± 2.5º C) Test stand lay-out is driven by requirement to match the Earth Magnetic Field conditions in lab to Undulator Hall, i.e. azimuth and gap orientation need to be identical LCLS-TN-04-1

MMF Under Construction Photos courtesy of Javier Sevilla Beneficial occupancy in March

Important Dates MMF Major Construction Finished Feb. 17, 2006 (Approximate) MMF Major Construction Finished Feb. 17, 2006 MMF Beneficial Occupancy March 6, 2006 Kugler Bench Complete April 15, 2006 Kugler Bench At SLAC May 15, 2006 Kugler Bench Handover To SLAC June 15, 2006 1st Article Arrives At SLAC July 2, 2006 MMF Ready For Measurements July 28, 2006 Production Measurements Start August 29, 2006

Kugler Bench On order, expected at SLAC May 15, 2006. Ready for use June 15, 2006.

SLAC Software Development Bench (While we wait on the Kugler bench) Bench software by Seva Kaplounenko

Undulator Measurement Steps ANL Bench (1 Week) Place undulator Mechanically align undulator to bench Magnetically align Hall probe to undulator Determine and use shield effect correction Rough tuning, x & y trajectories, phase Measure K Perform any required large gap adjustments Re-align, repeat rough tuning Attach magnetic shield Repeat rough tuning LCLS-TN-03-7

Undulator Measurement Steps Kugler Bench (1 Week) Place undulator Mechanically align undulator to bench Magnetically align Hall probe to undulator Rough tuning, x & y trajectories, phase Add phase matching shims Adjust field integrals Measure and tune field quality Final tuning, x & y trajectories, phase, check I1 & I2 Glue shims in place, check tuning Measure Bx & By in retracted position Map K vs X, move probe to the X value which gives the specified K Add fiducialization magnets to undulator ends, locate center of fiducialization magnets Rough fiducialization, Faro arm Move undulator to CMM, finish fiducialization

Place Undulator Ben Poling placing the ANL prototype on the SLAC prototype bench 12/9/05.

Built by Gordon Bowden, Yurii Levashov, Scott Jansson Place Undulator SLAC CAM Movers Bearing Bearing Cam Potentiometer Harmonic Drive Motor Brake Built by Gordon Bowden, Yurii Levashov, Scott Jansson

Mechanically Align to Bench Use Capacitive Sensors Yurii Levashov We tested capacitive sensors in TTF undulators at DESY

Mechanically Align To Bench Undulator aligned to fixed height of reference pole.

Mechanically Align to Bench Previous experience from PEP II and SPEAR III Use 6 capacitive sensors on an arm Gives x, yaw, y, pitch, and roll Have reference poles at each end Calibrate sensors with micrometers

Magnetically Align Hall Probe By x By By y x Technique Every N’th pole, move probe vertically, find minimum Every N’th pole, move probe horizontally, find midpoint between edges Plot (x, y) vs z, fit for magnetic alignment

Magnetically Align Hall Probe SLAC Measurements

Perform Any Large Gap Adjustments Tapered Shim ANL TB-48

Straighten X And Y Trajectories Simultaneously measure Bx and By (Hall) and Bx from a coil LCLS-TN-05-5

Straighten X And Y Trajectories Isaac Vasserman’s Ideas ANL/APS/TB-48 ANL/APS/TB-48 Apply shims to top and bottom poles Shims weaken By, don’t cause Bx Can’t strengthen pole, instead place shims on next pole to reduce deflection in other direction Developing software to try to automate shim placement LCLS-TN-04-7

Straighten X And Y Trajectories Measured X Trajectory Calculate Shims Modeled X Traj With Calc Shims Measured X Traj After Calc Shims Applied Automate Shimming, Under Development

Check Hall Probe Field Integrals LCLS-TN-05-22 Long Coil 150 Turns I1 I2

Earth’s Field LCLS-TN-05-4 We will Tune with the tunnel orientation Add a girder to the Kugler bench undulator supports (Joachim) Put a mu-metal shield around the undulators (Isaac) d) Measure the fields in the tunnel, test in the MMF

Poles 51 and 52 are 1% too strong. Minimize Phase Errors A magnet which is too strong can cause phase errors. The trajectory is shifted, but there is no residual slope. Correct with phase shims. Poles 51 and 52 are 1% too strong. LCLS-TN-04-7 Measured Phase Errors Calculated Shims Under development

Minimize Phase Errors Measure By with a Hall probe LCLS-TN-04-7 ANL/APS/TB-48 Measure By with a Hall probe Calculate phase error Calculate shims to correct error Apply shims, repeat Developing software to automate shim placement We don’t have shims to strengthen a magnet, only weaken Must locally reduce the gap to increase phase shift

Phase Matching pi/2 pi pi/2 (mod 2pi) Program provides shim information Phase Matching Shim Data Entrance: Number of end poles = 5 Measured Phase At The Entrance Poles: (Phase = 0 at the entrance cell boundary.) Pole Number = 1 2 3 4 5 6 Phase (deg) = 393.80 436.28 624.41 811.05 986.83 1157.97 Expected phase at pole number 6 = 1170.00 deg Entrance phase error (from pole 6) = -12.03 deg Entrance phase match shim dimension = 0.0000e+000 m (under development)

Determine K vs X Sinusoidal Field Canted Poles LCLS-TN-04-7 Analysis Program Gives K For Each X Run K vs X Calculated Undulator Parameters: Keff = 3.627747 Beff = 1.295076 T Lambda_rad = 1.595811e-010 m K X K0 K Shim Data Measured K value = 3.627747 Desired K value = 3.500000 Required field change dB / B = -3.6499e-002 Required gap change dgap = 2.1330e-004 m Beam x motion required dx = 4.7401e-002 m (under development) (prototype) X0 Set the probe position to give the nominal K value.

Add Fiducialization Magnets Need to relate magnetic field to tooling balls. Yurii Levashov Attach to undulator ends, measure offsets LCLS-TN-05-10

Move to CMM, Finish Fiducialization Want D D1 : Magnetic Measurement D2 : Calibration D3 : CMM D = D1 + D2 + D3

Conclusion Our group’s next big magnetic measurement project is the LCLS. A new magnetic measurements lab is being built. We will use Hall probes and coils to tune the undulators. Long coils will check the first and second field integrals. High gradient magnets with well defined centers will be used to fiducialize the undulators. Algorithms are being developed to automate shimming.