Organizational Chart and Leadership for 2019

Slides:



Advertisements
Similar presentations
1 Title Line on a Divider Slide Format >Level one bullet text for a divider slide.
Advertisements

Title Layout Subtitle.
SAMPLE ODU PRESENTATION
Background option 1 Title 2nd line Text size 1 Text size 2 with bold
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle Author.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title layout subtitle.
Title With Picture Layout
The only impossible journey is the one you do not begin.
Title Layout Subtitle.
Title With Picture Layout
Title Layout Subtitle.
Presentation title 32 point Second line if required
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title with Picture Layout
Title Layout Subtitle.
Title Layout Subtitle.
Title with Picture Layout
Presentation Title.
Title Layout Subtitle.
Title with Picture Layout
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Presentation title 32 point Second line if required
Title Layout Subtitle.
Title layout Subtitle.
Title Layout subtitle.
Title Layout Subtitle.
Title layout Subtitle.
Title Layout Subtitle Author.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title of Presentation (your names).
Title Layout Subtitle.
Title Slide Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Slide Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title With Pictures layout
Title Layout Subtitle.
Title Layout Subtitle.
Longitudinal Implementation of PROMIS for IPSG
Title With Pictures layout
Title layout Subtitle.
Presentation transcript:

Organizational Chart and Leadership for 2019 Harry Kim Coordinating Committee Meeting October 18th, 2018

Talks Current Prospective Study Enrollment & Data Monitoring Updates By cohort 2-year data Study management and logistics PROMIS Present TSRH graphs and protocol, results of feasibility survey, task force formation, goals for longitudinal study (60 patients for 1 year)

Content Slide Layout Bullet point #1 Bullet point #2

Section Divider Slide Or alternate title slide if you’d prefer this layout

Title Only Slide with Space for Large Image

Completely blank slide for full screen image

Logo Assets

Thank You!

Overview of Annual Meeting 2018 Harry Kim

Talks Current Prospective Study Enrollment & Data Monitoring Updates By cohort 2-year data Study management and logistics PROMIS Present TSRH graphs and protocol, results of feasibility survey, task force formation, goals for longitudinal study (60 patients for 1 year)

Content Slide Layout Bullet point #1 Bullet point #2

Section Divider Slide Or alternate title slide if you’d prefer this layout

Title Only Slide with Space for Large Image

Completely blank slide for full screen image

Logo Assets

Thank You!