JLEIC Accelerator R&D Meeting

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

Replacement of the Queens Approach Bronx-Whitestone Bridge
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Comparative Analysis Two Potential Sites for a New High School.
Feb. 6, 2007 BILCW07 Global Design Effort 1 CF&S EDR Plans Main Linac Parallel Session Tom Lackowski Atsushi Enomoto, Jean Luc Baldy, Vic Kuchler.
Lutheran Church of the Good Shepherd Building Committee Update May 2014.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Laura J. Weber Solid Waste Project Manager St. Regis Mohawk Tribe ITEP Tribal Transfer Station Course.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
MEIC Collaboration Meeting Site Development - Rebecca YaskyOctober 6, 2015.
Creating and Managing Tribal Transfer Stations January 2012.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
ULCH Stormwater Fees An Equivalent Stormwater Unit (ESU) is calculated so 1 ESU covers the average impermeable surface in one normal city lot Given all.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
1 Tim Michalski October 6, 2015 Engineering Issues in MEIC.
ENVIRONMENTAL SITE ASSESSMENT & THE PROJECT DEVELOPMENT PROCESS.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Construction of a Transfer Station
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Infrastructure Update RV Travel Park expansion 13 sites exist today Plans developed by Army for 40 site expansion Expansion can be supported by existing.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014.
Brownfields 101 Environmental Engineering Considerations Presented By: Ileen Gladstone, P.E., LSP, LEED.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Director ’ s Review of the Project X Cost Range Estimate: Conventional Facilities Project X Director’s Review March 16, 2009.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
Conventional Facilities/Siting Jonathan Hunt Project X Machine Advisory Committee March 18-19, 2013.
MENTAL HEALTH CLINIC Siting Process and Analysis.
Community Redevelopment Initiatives Presented to the
Camera PDR/CD1 Planning 19 September 2008
Transportation Engineering Business Development Workshop Department M
Conventional Facilities and Siting Global Group (ARCFS)
1st Avenue Revitalization Project Brownfield Pilot Study Public Outreach Property Owner Stakeholder Meeting June 1999.
BIM EXECUTION PLANNING PROCESS
LCWS11 AWG9 PARALLEL SESSION SUMMARY
October 2004 Through September 2005
JLEIC Collaboration meeting highlights
BIM EXECUTION PLANNING PROCESS
Potential Use of PEP-II Magnets by Project X
CF Organization & Schedule
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
SR422 Section 29M, Berks Co. West Shore Bypass Reconstruction
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
CONVENTIONAL FACILITIES LCLS Office Space
Magnet, Support and Infrastructure
Conventional Facilities (WBS 1
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
Update on the JLEIC pCDR
JLEIC Collider Rings’ Geometry Options
JLEIC Engineering Status
Design and Engineering Services
MEIC Design Update Fulvia Pilat MEIC R&D Meeting May 21, 2015.
Athletic Field Improvements
Option 1: 2257 m Electron Ring with Doglegs – Downstream of IP
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

JLEIC Accelerator R&D Meeting Site Development – R. Sprouse/D. Fazenbaker January 26, 2017

JLEIC Site Development Scope Engineering Services Contract – Indefinite Delivery Indefinite Quantity (IDIQ) Site Characterization & Early Project Development for conventional facilities Awarded in September 2015, Commonwealth of Virginia funds Scope includes all potential needs up to the start of design (CD-1) Site Development - $1,000K: Site plan with roads, parking, and structures Utility services & distribution Traffic Study Alternative analysis & feasibility studies Project Planning - $1,000K: Budgetary cost estimate Preliminary risk assessment Schedule development Pre-conceptual design report Design requirements document Site Condition Surveys - $500K: Topographic land surveys Property surveys Geotechnical investigation - soil borings Groundwater studies Environmental Services - $1,200K: Environmental site assessments Wetland delineation Environmental documents Ecological surveys Stormwater management plan

JLEIC Site Development Progress Task Orders Completed #1 – Site Survey & ESA #2 – Tunneling Feasibility Study #4 – Utility Distribution Study #5 – Stormwater Management Plan Task Orders In Progress #3 – Program Management (ongoing) #6 – Environmental Studies Task Orders in Development Foundation Analysis & Vibration Studies Develop Building & Tunnel Cross Sections Task Orders in Future Update Site Plans and Utility Distribution Construction Schedule Update Cost Estimate Risk Assessment Pre-Conceptual Design Report JLEIC Rebaseline / Optimization Data Needed

JLEIC Site Plan – 2017

JLEIC Utilities Distribution Chilled Water Communications Cryogenic Casing LCW Power Sanitary Sewer Water

JLEIC Stormwater Management

JLEIC Optimization Data Needed Updated element survey file with respect to existing CEBAF machine on JLAB coordinate system Existing site plan based on 2,154m collider ring – is this still correct? Confirm electron & ion transfer lines can be constructed based on placement of large figure-8 as indicated on site plan Additional data required to design cross sections & confirm utility requirements Floor elevations for tunnel and detector halls Magnet selections for electron & ion rings Existing utility requirements assumed PEP-II magnets for electron ring Confirm He Cooler (ERL) dimensions & utility requirements

Questions?