Pavement Rehabilitation Method
Advertisements

Sub-Grade Preparation-Equipment Caterpillar Paving Products
7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.
Using CFB Ash As A Substitute For Portland Cement In Full Depth Reclamation Presented By Steve Dixon, Civil & Environmental Consultants, Inc. Jim Panaro,
Chelan County Stemilt Loop Full Depth Reclamation, Phase II: Stemilt Loop Road is a Rural Minor Collector located in the Wenatchee Heights. The road serves.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
Sect. 12A-2 – Accessible SW Requirements ADA Clarifications: – When are curb ramps required? – What constitutes an alteration? – Does the scope of resurfacing.
NDDOT/LTAP Assistance Conference Mandan, North Dakota November 30, 2011.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Pavement Design Terms and Concepts
City of Somersworth Presentation to City Council on Pavement Management Presented by: Joe Ducharme, Jr., P.E. Contract City Engineer & Britt E. Audett,
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
SUSTAINABLE PAVEMENT ROUND TABLE February 10, 2015 RIVERSIDE COUNTY TRANSPORTATON DEPARTMENT.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
Conventional Pavement Structure inches Graded Aggregate Base inches Asphaltic Concrete Paving Prepared Subgrade stress.
Pavement Maintenance II
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Concrete Pavements The Right Tool for The Right Job.
Working Successfully With Property Managers: An Interactive Engagement
Micro-surfacing SRF Consulting Group, Inc. SemMaterials
Technical Services By Nathan Haaland.  Increase in Construction Costs  Asphalt  $350 to $735 per ton  Labor  3.6% increase  Inflation  13% increase.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
Public Works Department Hot In Place Bituminous Pavement Recycling August, 2011.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
“resurfacing hotline” (512)
City of Belmont Pavement Reconstruction Project October 15, 2014.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
Full Depth Reclamation
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Russian Engineers Training March 2011
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
March  Finish Joint Sealing on Highlands Ranch Parkway  Finish Grinding on Lucent and Plaza and then Complete Joint Sealing  Start in Late.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
Proposed Utility Line and Pavement Replacement Process Proposed Utility Line and Pavement Replacement Process Pre-Council June 28, 2016 Presented by: Transportation.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
A Data-Driven Strategy to Improve the Quality
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
2016 Mill and Overlay Project
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
The Gainesville Area Chamber Infrastructure Investment Initiative
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Runway Rehabilitation: Award of construction contract and acceptance of 3 grants Resolution June 22, 2009.
City of San Jacinto 7th Street Pavement Repairs
General Road Construction Information
DICKINSON AVENUE RECONSTRUCTION
Street Improvement Plan
Surface Preparation before laying Hot Mix
Determine Reinvestment
Pavement condition index calculation
PAVEMENTS CEE 320 Steve Muench.
Introduction to Pavement Design
2018 Pavement Workshop May 23-24, 2018
Pavement Preservation
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
SW Gage Blvd - Street Repair Project
Pavement Maintenance and Microsurfacing
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Pavement Structural Analysis
Pavement Preservation Philosophy utilizing Pavement Management Systems
Presentation transcript:

Hoops, haddock, cascade, oriole, Ervin and valley view heights paving Recommendation of bid award 2019-022

PROJECT AREA Area was selected as part of the third round of streets in the Real. Texas. Roads. program Streets were split into two phases Phase 1 Phase 2

Phase 1A - Utility Water and Sewer Replacements Contract 2019-025: Awarded Amount: $719,930 Council Awarded on March 4, 2019 Construction started April 22, 2019 Anticipated Completion September 9, 2019 Status Completed sewer replacement on Oriole Currently working on sewer on Ervin and water on Oriole

Phase 1b – paving rehab Paving Work Contract 2019-022: Awarded Amount: $1,134,358.49 Anticipated Council Award May 20, 2019 Anticipated Construction start June 24, 2019 Anticipated Completion December 21, 2019 Multiple Rehabilitation Methods Included

Phase 2 – utilities and paving Design Contract: Awarded Amount: $262,790 Council Awarded on Feb 4, 2019 Anticipated Construction Start Early 2020 Status 30% plans received this month for review

Paving rehabilitation methods

Paving rehab methods Spot Repair Method Localized spot repair is full-depth replacement at select areas. The localized full-depth repair can be as small as a 3’x3’ area or a much longer stretch of pavement. Phase 1 Phase 2

Paving rehab methods Seal Coat Method Seal coat treatment is a mix of asphalt emulsion and aggregate applied to the existing asphalt pavement surface. Treatment seals the surface to prevent water from penetrating and deteriorating the subgrade. Phase 1 Phase 2 Photo from http://www.interstateeng.com/archives/projects/scrub-seal-street-improvements/

Paving rehab methods Asphalt Reclamation Method Asphalt reclamation is for use on existing asphalt streets and involves pulverizing the existing asphalt surface into small pieces and then mixing the pulverized asphalt, base material and a stabilizer (lime, cement or both) to create a new stabilized sub- base. After the base material is prepared, a new layer of asphalt is placed on top. Curb and gutter and sidewalk will be replaced as necessary. Phase 1 Phase 2 Photo from https://cncement.org/guide-to-full-depth-reclamation-fdr-with-cement/

Paving rehab methods Full Reconstruction Method Full reconstruction is a complete demolition and rebuild of a street. The paving surface will be determined during design and based on costs. All curb and gutter and sidewalk is expected to be replaced. This method requires full design and use of outside design consultants. Phase 1 Phase 2

Paving rehab methods Mill and Asphalt Overlay Method Concrete streets from third round added to asphalt contract Phase 1 Phase 2