Contingency Plan for the March/April, 2006 possible power shortage

Slides:



Advertisements
Similar presentations
Integrated Resource Planning: An overview Mark Howells & Bruno Merven Energy Research Centre Energy Research Centre University of Cape Town.
Advertisements

Mockup. Analyze data using Study data at detailed level Identify target action to prevent revenue lost Geographical Info Device Info Customer Segmentation.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
1 Draft Agenda: Eskom DSM Residential Time-of- use tariff and smart metering workshop Draft Agenda: Eskom DSM Residential Time-of- use tariff and smart.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
2015/06/091 Overview of Maintenance & Infrastructure Delivery of Eskom Overview of Maintenance & Infrastructure Delivery of Eskom Eng Logan Pillay Eskom.
Temperature-Sensitive Loads and Class Cost Allocation Presentation to Utah Cost-of-Service Working Group Kevin Higgins, Energy Strategies July 13, 2005.
5/17/2000Summer Preparedness /17/2000Summer Preparedness SRP SUMMER PREPAREDNESS 2000 Presented to the Arizona Corporation Commission May.
11 POLOKWANE 2010 FIFA SOCCER WORLD CUP ELECTRICITY SUPPLY OPERATIONAL PLAN 2010 ESI Forum - 8 April 2010.
SDG&E Summer Preparedness July 2012 Update © 2012 San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
BLACKOUT POWER OUTAGE By Masih Madayeni Class 3/6 English Presentation.
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
Presenter: Peter Busch
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Embedded Generation Workshop SALGA Head Office 18 April 2013 THE POTENTIAL IMPACT OF EFFICIENCY MEASURES AND DISTRIBUTED GENERATION ON MUNICIPAL ELECTRICITY.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
1 1 Xolani Lembede 2010 ESI Forum Meeting 08 April 2010.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
PROPOSED BULK WATER TARIFFS for 2010/11 BUSHBUCKRIDGE WATER Presented By: Mr. P Ngomana- Chairperson Mr. Mapholoba A Letswalo- Acting Chief Executive.
A Presentation to the: Portfolio Committee on Minerals and Energy (30 August 2001) Given by: Barry Bredenkamp Bonesa Electricity (Pty) Ltd Efficient Lighting.
Report on the Western Cape outages for the period November 2005 to February 2006.
SueDon Ltd - Business Continuity Management BCM Overview ©1999 SueDon Ltd Business Continuity Management.
Water Utility General Overview Revenues Overall Revenue Increase 2.6% Expenditures. Overall Expenditure decrease of 1.3% Reservoirs Supplies 203.6% Hydrant.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
SLIDE 1 SRAS REVIEW TASMANIA REGION July 2013 PRESENTED BY PETER BIDDLE.
(c) IRD 2002 Power System Restoration (Black Start) Black Start Panel Session IEEE PES Summer Meeting Chicago, Illinois July 23, 2002 M. M. Adibi IRD Corp.,
1 Gas/Electric Coordination Meeting April, 2008 Bill Whaley Vice President Gas Control & Customer Service Bill Whaley Vice President Gas Control & Customer.
System Status Update February Overview Review of year to date demand and energy Review of recent system performance Outlook for summer 2012 What.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
Planning and Realisation of Wind Farms
Lessons Learned Implementing an IEC based Microgrid Power-Management System October 12, 2015 Presented by: Jared Mraz, P.E.
Modeling DER in Transmission Planning CAISO Experience
Sources of Failure in the Public Switched Telephone Network
NERC Lessons Learned Summary
CCU Update integrated resource plan May 17, 2016
Hurricane Rita.
Inquiry into the national electricity supply shortage and load shedding Presented to the Parliamentary Portfolio Committee on Minerals and Energy 28 May.
Challenges of integrating Variable Renewable Energy Sources (V-RES)
SECRET.
CORRECTIVE MAINTENANCE (REPAIRS) MANAGEMENT
Demand Control Field Trials
Economic Operation of Power Systems
Summer Plan: 2013 (1st March – 31st May)
How can metros and municipalities operate to ensure that revenue generated from electricity sales is sustainable? by Dr Minnesh Bipath and Dr Willie de.
DEC System Voltage Planning - June 2018
Pacific Power Seismic Preparedness Update
Report to the UPDEA 39th General Assembly
Network Contracting with Generators (incl
Term Project: Challenges in supplying Energy to Central Region
Template Name: ENGAGE™ Business Operating Model Template
Alternative ICAP Proposal
Transmission System Update
COMPANY NAME Business Continuity Plan Date Presented by.
Progress on the Renewable Energy IPP Procurement Programme
The Survival Plan.
NRS Ed.1: 2010 National Code of Practice: Emergency Load Reduction and System Restoration Practices CHECKLIST.
Application of Proposed New BES Definition:
Weekly System Status week 34 (19/08/2019 – 25/08/2019) System Operator
Weekly System Status week 28 (08/07/2019 – 14/07/2019) System Operator
Weekly System Status week 37 (09/09/2019 – 15/09/2019) System Operator
Weekly System Status week 38 (16/09/2019 – 22/09/2019) System Operator
Presentation transcript:

Contingency Plan for the March/April, 2006 possible power shortage Period of Koeberg refuelling

Overview City Mun SDA ME Metro RED Transfer & Operating Agreement Control over Full CCT geographic area and all customers Transfer & Operating Agreement Transfer & Operating Agreement Eskom Portion within Metro Area City Electricity Business 9/6/2019

Overview Koeberg Nuclear Power Station situation Unit 1 out of service due to incident Unit 2 due for refuelling Units provide 900 MW each Above scenario implies possible power shortage and the need for this proposed contingency plan Joint workgroup (RED1, City, Eskom) 9/6/2019

Contingency Proposals Three prong approach Electricity Supply Issues Infrastructure Availability Customer Relationship Management 9/6/2019

Electricity Supply Determine exact amount of shortage Apportion shortage between Eskom & City Establish critical customers Prepare plan to rotate outage per area Actively target non-critical electrical loads Exchange experienced system operators between Eskom and RED1 network control centres 9/6/2019

Cape Town embedded generation SHPS – 180 MW (available, non-continuous) RGT – 40 MW (available) AGT – 36 MW (available May) APS – 120 MW (not available) DWP – 3 MW (IPP, not available) 9/6/2019

Summer load profile 9/6/2019

Infrastructure Availability Determine serviceability of High Voltage Equipment Cease all scheduled maintenance Postpone routine maintenance on medium voltage apparatus (repairs driven) Postpone new connections where possible Redeploy staff to effect a more speedy response to equipment failure Discontinue normal demand side processes, hot water cylinder control & peak clipping 9/6/2019

Short term – CBD Reinforcement ~ GT 9/6/2019

Medium term – CBD Reinforcement 9/6/2019

Customer Relationship Extensive media announcements Assist critical complexes to check the serviceability of standby plant Allow Eskom Aggregator to negotiate directly with the City’s large customers Prepare strategy to minimise impact of power cuts on all customers 9/6/2019