Senior Project SR-60/Theodore St.

Slides:



Advertisements
Similar presentations
Request for Approval of Alternative Waste Management Practices (OG-071) For Oil & Gas Operations in Pennsylvania.
Advertisements

January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Transportation Systems Highway Transportation Characteristics.
Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Lecture 23 (mini-lecture): A Brief Introduction to Network Analysis Parts of the Network Analysis section of this lecture were borrowed from a UC Berkeley.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
OLD Organization Book Chapter Title Group Number, Group Member names New Organization
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Sonoma County Community College District Santa Rosa Junior College Educational/Facilities Master Plan Progress Report: November 2002 M AAS C OMPANIES.
Automation in transport networks through simulation Student of “System Analysis and Logistics” department: Anastasiia Lukmanova Student.
2012 ACEA MEETING ORANGE BEACH Brad Lindsey, P.E. Assistant State County Transportation Engineer – Pre Construction Alabama Department of Transportation.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
Traffic Signal Timing Design Part II. Slide 2 What to do?  Distribute volume among lanes to Identify lane utilization Determine need for lane adjustment.
Integrated System of Traffic Software. TEAPAC Complete All applications built into one program Graphical network creation/editing Enhanced graphical output.
Senior Project SR-60/Theodore St. November 14, 2014.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Asst. Prof. Dr. Mongkut Piantanakulchai
Brenda Bateman, Senior Policy Coordinator House Interim Committee on Energy & the Environment Oregon Water Supply & Conservation Initiative Update December.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
EXPONENTIAL FUNCTIONS Section TOPIC FOCUS I can… Identify exponential growth and decay Graph exponential functions.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
By Srinivas S. Pulugurtha, Ph.D., P.E. Assistant Professor of Civil Engineering University of North Carolina, Charlotte Presentation at TRB ABJ60 Workshop.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Transportation Modeling Options for City Departments LSA Associates, Inc. City of Fort Collins January 2001.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
MGT 498 Week 3 DQ 4 What is the difference between horizontal growth and vertical growth? Name a real-world company that focuses more on horizontal growth.
PSY 240 Week 2 CheckPoint The Nervous System Review Appendix B, and have it available as you conduct the Structures of the Nervous System activity. This.
Delete this slide when finished
Transportation Engineering Business Development Workshop Department M
Impact of Intersection Angle on Safety
The I-465 West Leg Reconstruction Project
Marina Vista Streetscape Project
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Management Team Meeting #3
MASTER THOROUGHFARE PLAN AND STREET DEVELOPMENT STANDARDS
Homeowners Update Meeting
I-280 Corridor Study and I-280/Winchester Blvd Project
Standards Education Committee Update
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Script Example for 1920’s Conversation
Importance of Geometric Design
Applied Technology and Traffic Analysis Program(ATTAP) MIDCAP & MUID
Life Cycle Assessment of MSWI residues: Recycling in road construction and landfilling Harpa Birgisdóttir.
Locating Points on a Map
Maryland Unconventional Intersection Design Analysis Tool
MPO School Transportation Working Group
Evaluation and Redesign Faisal and Amman Streets
Traffic Impact of Pedestrianisation in Stellenbosch
Learning Objectives – Driver and Vehicle Characteristics
Rotations on the Coordinate Plane
Work Hours: Monday – Saturday, 5:00 a.m. – 3:30 p.m.
ECONOMICS: January 17 Warm-up
Title name.
Walker Street Reconstruction Project 25% Design Public Hearing
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
АВЛИГАТАЙ ТЭМЦЭХ ҮНДЭСНИЙ ХӨТӨЛБӨР /танилцуулга/
How to describe all sections of the graph
Resources in Construction / Plant
Transformations Translation Reflection The FRAME Routine
Properties of Rational Functions
Integrated System of Traffic Software
Hydrology – Design of Culvert
Senior Project SR-60/Theodore St.
Senior Project SR-60/Theodore St.
Presentation transcript:

Senior Project SR-60/Theodore St. Pre-Meeting Updates January 23,2015

Presentation Topic Brief description

The project must accommodate for future traffic growth due to Moreno Valley development and the increase in trucks from the World Logistics Center. It also needs to accommodate for the movement of trucks and an increase in pedestrian, equestrian, and bike traffic.  The objective of this project is to improve the intersections’ projected level of service while considering environmental and socioeconomic impacts.  May require more than one slide Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7

Geometrics Finalizing the changes from Caltrans (horizontals) Traffic issues/tweaks volume-capacity ratio greater than 1 okay? Verticals on Theodore started May require more than one slide Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7

Traffic ICE Synchro 3-D for the big TVs Correcting LOS with PCE Learning Vissim May require more than one slide Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7

Environmental/Water Resources No Culvert – existing drainage Topo Shows water flows around site The real PEAR May require more than one slide Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7

Digital Mapping Allocating resources appropriately Scan at end of quarter? Maybe scan in 2 weeks? SketchUp Pro May require more than one slide Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7