EHN1 visiting point at the Open Days September 2019 EDMS:

Slides:



Advertisements
Similar presentations
HIGH RADIATION TO MATERIALS WG3 – E XPERIMENTAL A REA HiRadMat project Team Meeting 03/0/2011 T9 transformation Repeatability test of experimental area.
Advertisements

Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
Hargrave Street Pumpstation – Site Preparation July 2014.
1 Installation of Delphi Frame  ITS Installation.
YETS ACTIVITIES SPS-NA S. Girod & S. Evrard on behalf of the SBA team, EATM,
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
MICE MICO September ‘07 Chris Nelson. Beamline and Hall Shielded area virtually complete –SW corner –Replacement West wall concrete ordered, corner pieces.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
May 23 rd, 2011 MALLS, SHOPPING CENTERS & MUSEUMS.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
NA YETS: schedule week by week S. Evrard.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
22 October Summary: Updating of the activities carried out on-site (Done) in SEPTEMBER List activities on going (Next steps) and scheduled for OCTOBER.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
CMS exhibition area with LHC objects in SDX5 (3578 R-A11) 1.Plans & measures 2.Pictures 3.Questions 4.Possible ideas to “steal” from SM18.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.
GIF++ implementation Adrian Fabich, Sylvain Girod, Dorothea Pfeiffer, EN-MEF-LE GIF++ 3rd users’ meeting, 11th July 2013.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
H4 beam line for GIF Adrian Fabich, EN-EA-LE GIF users meeting, 17 th February 2016.
Removing the VTPC from the VERTEX magnets
SMB Service Status 113th ACCU Meeting
ALICE 5 o’clock meeting Wk 51.
Linac4-PSB 160 MeV connection readiness review
Test beam check list Michael JECKEL EN-EA-EC.
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
Safety in the Neutrino Platform Hall
St. George Infrastructure
LBNF CAD models, Drawings and Component list
NP Hall Visits Guides’ training
Francois and Lau EATM 17 July 2012
Outlook by the Physics Coordinator
INSTALLATION SEQUENCE
Beam Dump g. mornacchi.
TAS at IP1 Present situation and plans
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
SJVRWRF Dewatering Building Corrosion Remediation
“Building Better for the People of the World”
EHN1 Neutrino Installation Plans
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
Test beam check list Michael JECKEL EN-EA-EC EDMS:
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Triple-GEM setup at the GIF++
Tuesday 11th September LHCb dipole presently fault off
Disabling Rules.
CERN Testbeam facilities
Heating of ALFA detectors
John N. Galayda – Director of LCLS Construction March 30, 2009
Experimental Areas – LS2 planning
HL-LHC - WP15 modifications Coffrets Prise C4L8
East Hall under construction
East Area Renovation Supply of control rooms b.157
Test.
East Hall under construction
East Hall under construction
Open Points and More… Giulia / Michael / Sebastien / Maria.
Presentation transcript:

EHN1 visiting point at the Open Days 2019 14-15 September 2019 EDMS: 2156816 François Butin, Aboubakr Ebn Rahmoun, Sylvain Girod, Michael Lazzaroni, Eva Montbarbon EN/EA

EHN1 EHN1 Neutrino platform AMS EHN1 + NP entrance COMPASS Shuttle NA62 Shuttle + WC EHN1 AMS EDMS: 2156816

Stand particles therapy EHN1 guided tour R Floor Stand particles therapy 1st Floor EDMS: 2156816

The SBA stand EDMS: 2156816

The SBA museum Exhibition in the «aire de chargement» Beam elements: T10 spare target / T04 CNGS target Dipole MDX-V or H Quadrupole QNL or QWL 4 jaws collimator (open to look inside) XSCI +XWCA Roman pot Beam Stopper EP elements: NA61 TPC ATLAS detector mock-up Roman pot unit EDMS: 2156816

Installation Preparation and installation Actually Exhibition set up: Removing fence + re-installation after OD2019 (FSU?) Equipments fixation Equipments installation on concrete blocks (need of 4 white blocks 8-8-8) Requesting transport To have a clear visit path: Beach flags at the entrance of EHN1 Barriers (from CSA) Pictograms Cost Of Installation ~1000 CHF Validation of all equipments by HSE/RP (need non-measurable equipment) Actually EDMS: 2156816

Would you like to take part? In order to register: Doodle EDMS: 2156816