WG4 activities. Discussion

Slides:



Advertisements
Similar presentations
Workshop on Use of NWP in Support of Nowcasting Initiated by Tom Keenan Proposal by Jenny Sun, Jeanette Onclee, and Tom Keenan Organizing committee: Jeanette.
Advertisements

NEEDS AND REQUIREMENTS FOR METEOROLOGICAL AND CLIMATE INFORMATION IN SUPPORT TO HUMANITARIAN AGENCIES – SUMMARY OF INITIAL EVALUATION CBS (DPFS/PWS) Task.
COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Statistical adaptation of COSMO predictions with the Kalman.
EMS ECAM 13 september 2011 GlamEps: Current and future use in operational forecasting at KNMI Adrie Huiskamp.
Animation - uses and types
Interoperability between the European NWP modelling systems Ulrich Schättler, François Bouttier, Xiaohua Yang, Radmila Brozkova, Alan Radford A Report.
1 Joint Working Group Forecast Verification Research  Beth Ebert (BOM, Australia) co-chair  Laurie Wilson (CMC, Canada) co-chair Barb Brown (NCAR, USA)
Short-Range Ensemble Prediction System at INM José A. García-Moya & Carlos Santos SMNT – INM COSMO Meeting Zurich, September 2005.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Task 1 of PP Interpretation 1.1Further applications of.
Post-Processing at DWD Post-Processing at DWD Sebastian Trepte (FEZE) Grid-based forecasts COSMO, GME - derived products (thunderstorm ind., weather-related.
COSMO Priority Project CORSO “ C onsolidation of O peration and R esearch results for the S ochi O lympic Games” General Meeting 2011.
World Weather Research Programme (WWRP) Report Gilbert Brunet WWRP/JSC Chair.
European Cooperation on Nowcasting Yong Wang, ZAMG.
© GEO Secretariat Overall Concept What? B08FDP Forecast Demonstration Project (Nowcasting) B08RDP Research & Development Project (Ensemble Prediction Systems)
COSMO WG4 Actvities Concentrated mainly on COSMO LEPS  presentation by Andrea Montani The rest of the activities have been absorbed into the advanced.
WG4: Sibiy, 2 September 2013 COSMO Project CORSO: Consolidation of Operational and Research results for the Sochi Olympics Status COSMO.
Short-Range Ensemble Prediction System at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.
L. Mayoraz (1), J. Ambühl (1), R. Voisard (2), C. Voisard (1), M. Züger (2), H. Romang (1) (1) MeteoSwiss, Zurich, Switzerland, (2) University of Zurich,
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Local Probabilistic Weather Predictions for Switzerland.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG4 activities Pierre Eckert, MeteoSwiss, Geneva.
Priority project Advanced interpretation COSMO General Meeting, 18. September 2006 Pierre Eckert.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 4 activities.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of MeteoSwiss 18 September 2008 COSMO GM 2008.
Post processing on NWP output and nowcasting on the grid for feeding the forecast system in Canada Donald Talbot Chief of Meteorological System Section,
Exploring Biological Oceanography Beth Trowbridge & Sheryl Sotelo.
B08 Project February 2011, Geneva B08FDP training Jianjie WANG Beijing Meteorological Bureau, CMA Feb 10 th, 2011.
World Weather Research Programme What / How does the Programme help the Society? (Item 3.3) 24 May 2011.
WG4 Oct 2006 – Sep 2007 plans COSMO General Meeting, 21 September 2006 Pierre Eckert.
HWFP data gap analysis Plenary session _____________________________ WP4 Rome Workshop 3 rd December 2014.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache National Meteorological Administration of Romania.
How Computers Work. Objectives What Explain what a computer is. Identify different input and output devices. Why To understand how computers work. How.
11 9th ARC Meeting 3 November 2012, Kunming, China Report from ICSC 10 Jim Caughey, THORPEX IPO.
New task within PT Support Activities “Support of COSMO licensees”
Profiling based unstructured process logs
Tentative Plan of Activities (short-term)
LEPS VERIFICATION ON MAP CASES
Summary of WG6 activities
Current Satellites, Products, and Activities
Explore PT Impact of Computing Innovations
WG4: interpretation and applications A success story… to be continued… Pierre Eckert MeteoSwiss, Geneva.
1. Choose a film which you think has a definite turning point or decisive moment. Explain briefly what happens at that point or moment and go on to explain.
THORPEX-Europe Meeting Summary Dale Barker
Links with GEO.
20th COSMO General Meeting, 3-7 September 2018, St. Petersburg, Russia
COSMO-DE-EPS Susanne Theis, Christoph Gebhardt, Michael Buchhold,
Verification of COSMO-LEPS and coupling with a hydrologic model
!'!!. = pt >pt > \ ___,..___,..
HELLENIC NATIONAL METEOROLOGICAL SERVICE
COSMO GENERAL MEETING HELLENIC NATIONAL METEOROLOGICAL SERVICE (HNMS)
Ulrich Damrath Deutscher Wetterdienst
La Plata Basin Originated from sub-seasonal workshop focussing on link seamless prediction climate to weather.
Christoph Gebhardt, Zied Ben Bouallègue, Michael Buchhold
Public Weather Services and Nowcasting
COSMO Projects th COSMO GENERAL MEETING
Огторгуй ба амидрал Cosmos and life
Create PT Applications from Ideas
Update on SCOPE-Nowcasting Pilot Project X
FLOODsite Integrated Project
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team
Long-range forecast verification
Doc 4.6(2): Implementation of Forecast verification activities, High Resolution NWP and Impact-Based Forecasting and Warning Xu Tang D/WDS
Functions and mappings
Activities WG-MWFR Help set up/involvement in RDP’s/FDP’s (COPS, Sochi, HYMEX, …) Push mesoscale research cooperation / proposals on: Mesoscale modelling.
Guidelines for future developments Tiziana Paccagnella, ARPA-SIM
COSMO General Meeting Zurich 2005
Activities of WG7 Chiara Marsigli.
Overview of WG4 Users Survey responses
PP INSPECT is finished, but the work is going on
PP CARMA Common Area with Rfdbk/MEC Application
Presentation transcript:

WG4 activities. Discussion All COSMO GM in Saint Petersburg, 04 September 2018

Possible new PT: Guidelines for users of LAM forecasts. Forecast production chain: Sequences of maps, meteograms, … Improving the link between verificators and forecast users, explaining state-of-the-art verification techniques, how to read spatial verification results EPS applications. How to use EPS products. Using nowcasting products

Possible new joint project on HIW. WG4 participation Most important are severe, and more generally, high impact weather forecasts, which are often a result of postprocessing The could be close interrelation of a COSMO project with the WMO JWGFVR HIW project led by Beth Ebert At MetOffice, work is started by J. Flowerdew on verification of the whole modeling chain, step by step during the post-processing phases

A WG4 task about postprocessing techniques for HIW forecasts could include: Overview of forecast methods for HIW events Comparison of postprocessing techniques vs. DMO (including output of parameterizations), where possible, including verirication Improving existing methods Exploring new approaches. Machine learning? Link to COSMO/ICON-ART for fog forecasts