Tribal Data WG Fire and Smoke WG Oil and Gas WG

Slides:



Advertisements
Similar presentations
Attribution of Haze Workgroup & Technical Support System Report Fire Emissions Joint Forum Meeting July
Advertisements

Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
Three-State Air Quality Study (3SAQS) Three-State Data Warehouse (3SDW) 3SAQS Technical Scope of Work: Tom Moore, WESTAR/WRAP on behalf of University.
3SAQS Data Warehouse Update October 10, 2014 CIRA - Fort Collins, CO.
Three State Data Warehouse Tom Moore Shawn McClure, Rodger Ames, Dustin Schmidt
Developing a Workplan for Implementing the Strategic Plan for the WRAP Board October 1, 2008.
Fire Emissions Joint Forum –Section 308 Strategies for Fire Coordinating efforts of states changing or developing smoke management strategies for regional.
3SAQS Technical Committee Workshop Overview of updated schedule / deliverables related to ongoing 3SAQS technical work October 31, 2013 Tom Moore.
2004 Workplan WRAP Regional Modeling Center Prepared by: Gail Tonnesen, University of California Riverside Ralph Morris, ENVIRON Corporation Zac Adelman,
NSDI Strategic Plan Update FGDC Coordination Group Meeting September 10, 2013.
November 7, 2013 WRAP Membership Meeting Denver, CO Tom Moore WRAP Air Quality Program Manager WESTAR Council.
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
Western Air Quality Study (WAQS) Intermountain West Data Warehouse (IWDW) Revisions to WAQS Phase 2 SoW: September 2015 – March 2016 University of North.
Next Steps in Regional Haze Planning in the Western U.S. Prepared by the WESTAR Planning Committee for the Fall Business Meeting, Tempe, AZ October 31,
Summary of WRAP 2004 Work Plan WRAP Board Meeting October 14, 2003 Salt Lake City, UT.
WRAP Update WESTAR Meeting San Francisco April 25, 2011.
Response to WRAP Air Managers Committee Memo “Request for Cost Estimates” April 6, 2009 WESTAR Council.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Santa Fe December 2006 Update on Regional Haze 308 SIP Template.
Technical Projects Update WRAP Board Meeting Salt Lake City, UT November 10, 2004.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Portland August 2006 Suggested Changes to IWG Section 308 SIP Template.
WESTAR Staff Reports 2015 Fall Business Meeting Scottsdale, Arizona.
Modeling Forum Status Report WRAP Planning Team Meeting February 22-23, 2006 John Vimont, Mary Uhl, & Kevin Briggs, Forum Co-Chairs.
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
May 23, 2013 Don Arkell WESTAR Staff WESTAR Council Meeting Tom Moore Air Quality Program Manager Western Governors’ Association.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Status of WRAP Work Plan Tom Moore, WRAP September 19, 2002 WESTAR Fall Technical Conference.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Work Items for §309 SIPs WESTAR Fall Technical Conference September 19, 2002 Tom Moore & Brian Finneran.
NSDI Strategic Plan Update FGDC Coordination Group Meeting November 19, 2013.
WESTAR Staff Reports  Technical Coordinator Report  Regional Haze Planning Report  Training Program Report.
Intermountain West Data Warehouse
WESTAR Planning Committee
Status Report to the Stationary Sources Joint Forum:
Visibility Coordinator Regional Haze
WRAP TSC/Co-Chairs Call Workplan Progress Update August 1, 2018
WRAP Workplan WESTAR (State Caucus) Recommendations and Action Items
JRC’s Follow-up work to improve GES assessment
WRAP TSC/Co-Chairs Call Workplan Progress Update August 29, 2018
Monthly Update on WRAP Workplan
WRAP TSC/Co-Chairs Call Workplan Progress Update September 26, 2018
WRAP Regional Haze Progress Report & FEJF Projects/Budget
WRAP TSC/Co-Chairs Call Workplan Progress Update October 31st, 2018
Upcoming projects* to support Regional Haze SIP/TIP planning
WRAP TSC/Co-Chairs Call Workplan Progress Update December 19, 2018
WRAP Regional Haze Grant Status, Technical Project Priorities, & Proposed Technical Analysis Forum Tom Moore WRAP Technical Coordinator Attribution.
2012 Spring Business Meeting Seattle, Washington
NERC Reliability Standards Development Plan
2013 Fall Business Meeting Denver, Colorado
Executive Order No. 23 Update Air & Waste Management Association Conference November 16, 2018 Presentation will focus on the latest policy development.
Western Regional Haze Planning and
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Tribal Data WG Fire and Smoke WG Oil and Gas WG
timeframe in to be determined
NERC Reliability Standards Development Plan
TIBC Budget Formulation Improvement Project
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Regional Technical Support Document
Tribal Data WG Fire and Smoke WG Oil and Gas WG
RHPWG – Control Measures Subcommittee Oil & Gas Source Coordination
Regional Haze SIP Status Report
Next Steps on the §309 Regional Technical Support Document April 2003
WRAP Regional Haze Planning Webinar June 20, 2019
WESTAR (State Caucus) Recommendations
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Stationary Sources Joint Forum: Next Steps
Attribution of Haze Project Report
WESTAR Staff Reports Technical Coordinator Report
Status of Preliminary Reasonable Progress Analysis
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Presentation transcript:

Monthly Update on 2018-2019 WRAP Workplan July 31st, 2019 TSC and Work Group Co-Chairs Call Tribal Data WG Fire and Smoke WG Oil and Gas WG Regional Technical Operations WG Regional Haze Planning WG

Tribal Data Work Group

Workplan Progress by Tribal Data Work Group Workplan Progress over the Last Month Contracted/EN3 review & comments on CC Framework – “redline” draft of Framework based on the review Workplan Tasks for the Next Two Months Complete finalization by consensus of products under contract (oil & gas study) Plan 2nd webinar Relay TDWG/contractor feedback to RHPWG contractor on Consultation & Coordination Framework Send participation letter for TDWG Create “active tribes” section of tribal contacts list based on participation letter responses

Workplan Coordination Activities by Tribal Data Work Group Workplan Coordination Occurring over the Last Month EN3 continued outreach with O&G tribes Workplan Coordination Needed over the Next Two Months RHPWG – submit to RHPWG/Ramboll combined or staggered- any reviews/comments of Framework (contractor/EN3, Co-chairs) to accompany C&G SC – requested reviews. Target July 8 Review turn-around revision from Ramboll by July 18 (TDWG call), possible joint call w/ CGSC early Aug Tribal contacts list – format & arrange for state planning use via RHPWG OGWG – webinar possibility? Remaining EI’s from contacted tribes- share with OGWG

Fire and Smoke Work Group

Workplan Progress by Fire and Smoke Work Group Workplan Progress over the Last Month Finishing up Representative Baseline Fire Emissions Inventory Preparing Smoke Management Plan survey for states and tribes Workplan Tasks for the Next Two Months Submit RB EI to modelers Prepare Future Fire Scenarios EI for sensitivity runs Distribute SMP survey, collect responses Help EPA prepare Fire EI for 2017 NEI

Workplan Coordination Activities by Fire and Smoke Work Group Workplan Coordination Occurring over the Last Month None Workplan Coordination Needed over the Next Two Months Need to ask TDWG for tribal SMP contact list RB EI handoff to RTOWG

Oil and Gas Work Group

Workplan Progress by Oil and Gas Work Group Workplan Progress Over the Last Month OGWG and Project Management Team (PMT) review and feedback Baseline Inventory – Underway WRAP OGWG Draft Baseline Inventory (v2) and Report [v2 integrated OGWG survey data] Six States (NM, UT, ND, MT, WY, AK) – Complete Colorado - Underway Survey Data Memo [gas compositions and controls] – Complete Forecast Scenarios – Underway Workplan Tasks for the Next Two Months Task 1: Baseline Inventory Final Inventory (v2) (anticipated mid-August) Task 2: Forecast 2028 Inventory (On-the-books controls) – Mid-August Medium forecast scenario being finalized based on previous agency input Developing low and high forecast scenario methodology Task 3: Forecast 2028 Inventory (Additional Reasonable controls) – Late-Summer Single forecast scenario and integrate OGWG survey data

Workplan Coordination Activities by OGWG Workplan Coordination Occurring Over the Last Month June 26 – WG feedback due on Baseline 2014-16 O&G EI for WESTAR-WRAP Region July 2 – Project Management Team Call Coordinate and PMT feedback with Ramboll July 16 – Colorado 2014/2016 O&G EI Call July 17 – Western State RH O&G Call (OGWG lead on future controls identification) Workplan Coordination Needed Over the Next Two Months August 6 & 20, Sept. 3 & 17 – Project Management Team Calls August 13 – OGWG Bi-Monthly Call OGWG and PMT review and feedback on draft work products Coordination with RHPWG Control Measures Subcommittee Coordination (External to WRAP) Occurring / Needed EPA’s 2016 Modeling Platform – availability of OGWG baseline inventory 2017 NEI – account for inventory improvements

Regional Technical Operations Work Group

Workplan Progress by RTOWG Workplan Progress over the Last Month 2014 Shakeout v.2 modeling underway Workplan Tasks for the Next Two Months Review of Shakeout v.2 modeling results Representative baseline modeling Reflect current emissions under ‘normal’ conditions Basis for 2028 modeling Use updated GEOS-Chem results for boundary conditions Model runs are currently underway White paper on new GEOS-Chem simulations to evaluate Natural conditions International contributions

Workplan Coordination Activities by RTOWG Workplan Coordination Occurring over the Last Month Calls we participated in RHPWG (7/2) RTOWG co-chair coordination calls (7/8 and 7/22) OGWG (7/2) Participated in the Colorado ‘special O&G call’ on July 16 2016 EPA-State modeling review forum (6/26 and 7/24) Also participated in some of the workgroup calls. NASA HAQAST background O3 haze call (7/3) IWDW call on July 15 RHPWG Emission Inventory and Modeling Protocol subcommittee (7/25) Workplan Coordination Needed over the Next Two Months WAQS 2014 Shakeout v1 / v2 progress, postponed from 7/24 to a later date Emission updates (RHPWG EI and MP subcommittee) Shakeout v.2 Baseline modeling

Intermountain West Data Warehouse The IWDW Steering Committee had a call on July 15 The IWDW is certainly a part of the RH planning effort since it houses the model results, monitoring analysis, and the TSS. The IWDW also contributes some funding, staff support such as CIRA staff support, and in- kind services which also support the RH SIP effort. On the call the IWDW steering committee discussed:  Status of Technical Activities and Data Warehouse Brief tour of the updated IWDW website including the TSS website and 2014 modeling archive for the WRAP RH modeling effort Expiration of MOU amongst the cooperators Future NEPA Projects Status of Budget and Discuss Future Funding Monitoring Network Assessment

Regional Haze Planning Work Group

Workplan Progress & Coordination by Regional Haze Planning Work Group Workplan Progress and Coordination over the Last Month Coordinated with C&GP and EI&MP Subcommittees to present task updates on monthly call (July 2, 2019) Coordinated with O&G Workgroup on preliminary oil & gas state call Workplan tasks and Coordination for the Next Two Months Final review of and consensus on the WRAP Communication Framework Development of Regional Haze in the West Storyboard Coordinate ongoing discussions of controls and modeling – both require states to consult with sources Next milestone webinar planned for mid- to late-September

Workplan Progress by Coordination and Glide Path Subcommittee Workplan Progress over the Last Month Task 6.3: Develop New Materials D) Storyboard – Haze in the West Team has drafted an outline of the storyboard. Looking to hire a contractor to produce a mock-up that can be presented to the states. Aiming to present on the Fall Periodic Webinar. E) Webinar Presentations to States Planning next milestone webinar for mid- to late-September 2019 Task 7.1: Review TSS v1 for Priority Needs Coordinating call with RTOWG to discuss “TSS Priorities” document feedback Task 7.2: Coordinate and Review TSS v2 Monitor Data Tool Development Monthly presentations on new metrics and tools from CIRA on TSS progress We need to "freeze" the TSS version of the IMPROVE base data and RHR/Impairment metrics for planning period. Workplan Tasks for the Next Two Months Task 1.2: Analyze monitor data trends Brandon (Montana) and ARS presented results of the trend analysis and natural conditions alternatives task on the last subcommittee call. Currently planning an August webinar to share more detailed results. B) Glossary & C) FAQs Potential for contractor support. Creation of scope of work to detail deliverables. Task 8.2: Establish Consultation-Coordination Framework Deadline of August 15 for review and comment on latest draft of the Framework.

Workplan Coordination Activities by Coordination and Glide Path Subcommittee Workplan Coordination Occurring over the Last Month The subcommittee coordinated with the following entities: TDWG – New edits to the Consultation-Coordination Framework document Workplan Coordination Needed over the Next Two Months RTOWG – Coordination on Natural Conditions project findings and opportunities to model outcomes for future planning periods.

Workplan Progress by EI&MP Subcommittee Workplan Progress over the Last Month 2014 Base Case (Shakeout v2) emissions changes being processed by contractor Identified minor issues with some state inputs and corrected Compiled/Reformatted representative baseline emissions updates from states Workplan Tasks for the Next Two Months Send out memo describing Shakeout v2 updates Procedural guidance for preparing OTB/OTW emissions updates OTB/OTW emissions to be submitted by states in August

Workplan Coordination Activities by EI&MP Subcommittee Workplan Coordination Occurring over the Last Month O&G Workgroup reviewed v1 emissions O&G v2 emissions will come from contractor based on state comments Workplan Coordination Needed over the Next Two Months v2 shakeout, representative baseline, and OTB modeling scenarios require coordination as needed with O&G WG, contractor, Fire & Smoke WG, Coordinate with C&GP subcommittee to provide guidance to states on what is needed from them for the different modeling scenarios

Workplan Progress by Control Measures Subcommittee Workplan Progress over the Last Month Most states are beginning the control strategy analysis Discussed potential nonpoint/area source analysis Workplan Tasks for the Next Two Months Begin to identify 2028 control strategies for incorporation in 2028 inventory Draft Source Control Assessment Considerations memo being prepared to assist states in performing the four-factor analysis

Workplan Coordination Activities by Control Measures Subcommittee Workplan Coordination Occurring over the Last Month Coordinated with O&G Workgroup and subset of oil and gas states for preliminary discussion of potential control options Workplan Coordination Needed over the Next Two Months Continued coordination needed with the O&G Workgroup Coordinate with EI &MP Subcommittee on timing of conversations with sources to generate/confirm emission inventory inputs for modeling

End of Workplan Progress Update