Update developments in Core CCR

Slides:



Advertisements
Similar presentations
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Advertisements

Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
EU Developments Transmission Workgroup 3rd November 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Click to edit Master title style TITRE CEE IG – 20/02/2014 ACER Long-Term Rights Task Force Current status of the discussion with ENTSO-E.
Planning for allocation rules and the auction platform NRAs propose to follow a two-steps approach:. 2013: » Based on the wish-list and within the scope.
EU Developments. September Update  ACER Framework Guidelines on interoperability rules  Scoping paper still to be published  Rather than conduct a.
EU Developments Transmission Workgroup 6th October 2011.
Capacity Allocation & Congestion Management Network Codes Stakeholder Meeting 3 July 2012 Introduction & Overview \
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Draft cross-regional roadmap for Long-Term Transmission Rights Still work in progress, for discussion 27 June 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
European Commission views on intra-day and balancing markets
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 1 October, 2010 Jurmala ACER and regulatory empowerment.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
European Developments Transmission Workgroup 1 st December 2011.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
European Developments Transmission Workgroup 3 rd May 2012.
Vivi Mathiesen Florence Forum, Florence 13 Dec 2010 Third Compliance Monitoring Report.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
CNMC and CRE intend to formally approve IFE rules 3.1 by mid-March
29th November 2016 Teleconference
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Public Consultation : main conclusions (1/2)
Handling of grid losses of HVDC cables in NWE Market Coupling - EMCC proposal for compensation of grid losses – NWE day-ahead meeting, Copenhagen, 22/08/2012.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
New transparency guidelines
Enagás, GRTgaz, Reganosa, REN and TIGF
Cross-regional roadmap on capacity calculation and long-term capacity allocation Impact for the FUI regional roadmap Work document FUI Implementation Group.
Moyle & East West Access Rules Approval
20th April 2016 Teleconference
EU Implementation Programme
Overview All NEMO and all TSOs methodologies
4th October 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
Feedback on the SWE coupling Public Consultation
Grid Code Development Forum – 6 September 2017
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
ACER’s view on the future role of the Gas Regional Initiative
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
20th April 2016 Teleconference
Update on European Network Codes
EB Reporting PT David Gerbec EBSG 5th of March 2018.
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
Transparency in the Energy Community Contracting Parties
20th April 2016 Teleconference
4th October 2016 Teleconference
18th July 2016 Teleconference
EB Reporting PT David Gerbec EBSG 5th of March 2018.
43th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
37th IG Meeting South Gas Regional Initiative
29th November 2016 Teleconference
26th February 2015 Teleconference
12th December 2014 Teleconference
Transmission Planning Code Review
Generic Revenue Driver Methodology
ACER’s view on the future role of the Gas Regional Initiative
Update developments in Core CCR
Core CG meeting 3rd of April 10:00-16:00 NH Hotel, Vienna Airport.
Presentation transcript:

Update developments in Core CCR Status Core CCR program

Update developments in Core CCR Network Code/Guideline Art. CCR Obligation* Current status ENTSO-E Website Link CACM Day ahead 20ff Common Capacity Calculation Methodology for Day ahead NRAs referred to ACER for the decision ACER published their final decision (21/02/2019), available here ACER decision 02-2019 Final version of the methodology available here 27.2 Setting up Coordinated Capacity Calculator In preparation by Core TSOs. Intraday Common Capacity Calculation Methodology for Intraday SO GL Regional Security Coordination 76.1 Proposal for common provisions for regional operational security coordination Methodology under development by Core TSOs Concept Note provided to Core NRAs More information can be found on Core CCR webpage: https://www.entsoe.eu/network_codes/ccr-regions/#core More information can be found on Core CCR webpage: https://www.entsoe.eu/network_codes/ccr-regions/#core Work in progress Work not started Work approved

Update developments in Core CCR Network Code/Guideline Art. CCR Obligation* Current status ENTSO-E Website Link CACM Redispatch & Counter-trading Intraday 35.1 Proposal for a coordinated RD & CT Submission of methodology to NRAs on 22/02/2019. Latest version of the Methodology available here 74.1 Proposal for RD&CT cost sharing 74.7 Further harmonize redispatching and countertrading cost sharing methodologies with other CCRs Not started due to ongoing drafting of CACM art. 74.1 35.3 Report assessing the harmonization of coordinated RD&CT Harmonization report and consultation report submitted to NRAs on 17/01/2019. Core Report Harmonization available here. General 44 Fallback procedures for Day ahead Flow Based Market Coupling NRAs referred to ACER for the decision on the approval of Fallback Procedures ACER published their final decision (27/09/2018), available here More information can be found on Core CCR webpage: https://www.entsoe.eu/network_codes/ccr-regions/#core Work in progress Work not started Work approved

Update developments in Core CCR Network Code/Guideline Art. CCR Obligation* Current status ENTSO-E Website Link FCA Long Term 31.1 Regional design of Long Term Transmission Rights (LTRs) in CCRs where LTRs exist 1st amendment: NRAs’ approval received (06/18) 2nd amendment: PC closed (held 07/02 – 07/03/2019), Submission of 2nd amendment to NRAs on 08/04/2019 Latest version of the methodology available here 10.1 Common Capacity Calculation Methodology for Long Term capacities Methodology under development by Core TSOs. Public Consultation foreseen in June/July 2019 16.1 Methodology for splitting Long Term capacities 21.1 Operational rules for merging the individual grid models Under development by all TSOs within ENTSO-E. 21.2 Operational rules for coordinated capacity calculators 52 Regional requirements of the harmonised allocation rules (Annex) Request for Amendment received from Core NRAs (09/18) Amended proposal submitted to NRAs on 16/01. NRAs approved on 08/04/2019 Latest version of the methodology available here Work in progress Work not started Work approved More information can be found on Core CCR webpage: https://www.entsoe.eu/network_codes/ccr-regions/#core