MSD I Review February 22, 2008 (9:00 AM) Room 09-2550.

Slides:



Advertisements
Similar presentations
Log System Spec 1 Logical Systems Specification Module Two stages in the module – Stage 4 - Technical Systems Options – Stage 5 - Logical Design Performed.
Advertisements

Multidisciplinary Senior Design Rochester Institute of Technology Dresser-Rand Painted Post P10459 MSD II Update Presentation 4/9/10 Team: Phil Eaton (ME)
Artificial Limb Project By Casey Dill. Mission Statement This project will improve upon existing plans for an artificial arm with the same capabilities.
MSD 1 P12453 Detailed Design Review Markus Holzenkamp Robin Leili Cody Anderson 5/17/2015 Detailed Design Review 1.
D-R Compressor Cell RIT Senior Design Team P13458 Week 4 Status Report.
6/10/2015SYSTEMS LEVEL DESIGN REVIEW 1 HEALTH-MONITORING OF A RECIPROCATING COMPRESSOR MSD1 – P12453 SYSTEMS LEVEL DESIGN REVIEW.
Unit 231 Software Engineering Introduction to SWE What is SDLC Phases of SDLC.
P09713 – FRESH BREAD AND ROLL SCALING ROOM Customer Needs and Product Specifications Senior Design I: Winter Cecilia Enestrom, Kate Gleason,
Compressor ReVamp and Fabrication PO9452. Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules.
RIT Senior Design I, Project Review P07310: Electronic Shifted Manual Transmission George Slack Team Guide Jason BotterillTeam Leader, Mechanical Engineer.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Unit 191 Introduction to Software Engineering The objective of this section is to introduce the subject of software engineering. When you have read this.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
Compressor ReVamp and Fabrication PO9452. Update Revised specs Continued concept generation Researched range of educational applications for compressor.
Examine Quality Assurance/Quality Control Documentation
The objective of this project was to design a dynamic similarity test rig to replicate the operating conditions of the main crank bearing in the Dresser-Rand.
SQA Architecture Software Quality.
Lec#14.  Disable person needs equipment with the degree of impairment and desired degree of independence in area of personal care, mobility, leisure,
What is a Computer Network? Two or more computers which are connected together.
OHS Risk Management for Retail Butchers Jenny Barron Practical Work Solutions 30 March 2005.
Student Health & Edinburgh Napier University Health & Safety Team | Edinburgh Napier University.
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
Hazard Identification
Basics of OHSAS Occupational Health & Safety Management System
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
P13458 RIT Senior Design Team May 10, :30AM Dresser- Rand, Painted Post Final Presentation:
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
D-R Compressor Cell RIT Senior Design Team P13458 Systems Design Review.
PROJECT STATEMENT Dresser-Rand will be donating a single stage ESH reciprocating compressor for RIT use. The project objective is to safely install the.
Opto-Electric Guitar Pickup Multidisciplinary Senior Design I RIT Spring/Fall
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
A procedure for controlling risks 1 st step – to eliminate and identify hazards 2 nd step – to rank the risk associated with the hazards 3 rd step – to.
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
2 3 4 Office equipment can include:  Computers and computer peripherals  Telephone, facsimile  Photocopies  Presentations equipment  Furniture.
P16680: AATech Universal Oil and Bag System Bryce Mowers Jessica Reed Maria King Nicole Anklam Philip Couturier Samantha Orlando.
Concept for Room Layout. Customer Needs for Room Layout/Setup Safe to UseEasy to Use Easy to Modify/ Work on Compressor Easy to Learn.
P16221 – FSAE Shock Dynamometer Problem Definition Review.
Project Final Presentation Joe Featherall.
14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members:
P08452: Reciprocating Compressor Install, Revamp, and Interface Dr. Margaret BaileyFaculty Guide Garry StudleyProject Manager Dave Rigolo Lead Engineer.
Engineering Environment Awareness
P08452: Reciprocating Compressor Install, Revamp, and Interface Dr. Margaret BaileyFaculty Guide Garry StudleyProject Manager Dave Rigolo Lead Engineer.
RIT SENIOR DESIGN: P08452 COMPRESSOR INSTALLATION, REVAMP, AND INTERFACE.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
P08452 Reciprocating Compressor Installation, Revamp, and Interface Installation Designed and prepared the installation guidelines and test cell setup.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
MANAGING MANUAL HANDLING
P10452 Dresser Rand Compressor Installation and Utilization Joe Bykowicz (ME) Dresser Rand Model.
Student Health & Edinburgh Napier University
Presentation to the COIT Architecture Sub-Committee
P07307: Controls for Dynamic Suspension
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
Turbomachinery Flow Visualization P08453
Presented by Jon Pastuszynski, Lead M&D Engineer
Student Health & Edinburgh Napier University
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
RIT Senior Design Team P13458 Systems Design Review 1/18/13
P08351: Automated Oiling System
SENIOR DESIGN PROJECT P08455
Cell Deployment Process
SENIOR DESIGN PROJECT P08455
P10452 Dresser Rand Compressor Installation and Utilization
IT and Development support services
Chapter 8 Software Evolution.
P07122: Autonomous Quadcopter
SENIOR DESIGN PROJECT P08455
Value Engineering in a Manufacturing Facility
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Presentation transcript:

MSD I Review February 22, 2008 (9:00 AM) Room 09-2550

Relationships of Sub-functions 3 2 4 Create a functional interface to log and trend data Safely install compressor 1 dfgsdfg 1 – Installation and interface relate via the installation of a suitable computer workstation 2 – Interface and revamp relate through the documents both sub functions will produce for future teams to use 3 – Revamp and installation are related through the creation of a safe environment suitable for the revamp of the compressor 4 – All sub-functions work together to provide a safe, solid, and functional foundation for future teams to pursue further revamp and fault detection projects

High Level Customer Needs and Engineering Specs Safety Considerations Equipment List Trainings 70-95°F Maintenance Capabilities 24”-35” Access Space 30-45 ft2 Storage Space Tooling List < 40 lbs. Manual Lifting 150-225 lbs. Assisted Lifting Installation of Compressor 8-19 Weeks from 12/3/07 Acoustic Levels 75-100 dB Vibrations 0.1-1.0 g/s 0 injuries Room Structural Load =15,000 lbs (nf = 2.0) Compressor Revamp 6 to 2 Stages 25-37.5 hp 100+/-10 psi 45-90.3 A Future Use Considerations Modifiable Interface Modifiable DAQ Variables Timeline for Projects Allowances for Projects Dresser-Rand Involvement Weekly Teleconference Meetings Bi-weekly Reviews Operation and Maintenance: Student Manual

High Risk Assessment Mitigated Remaining Sound (D-R Data, Dissipation Experiment) Vibration (Spring-Action Damping Mounts) Budget (Coordination between D-R and RIT) Remaining Structural Load (Consultant Lead Time) Formula SAE Team (Exit Test Cell 09-2329)

Student Version Operation and Maintenance Manual Auxiliary Document, attached to the N30NL-4 “Maintenance Manual” Starting Guide for Future Project Teams Safety Considerations Procedures Engineering Details

Overall Projects Timeline

Senior Design II Timeline