Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street.

Slides:



Advertisements
Similar presentations
Williamstown Fire Department Fire Station Feasibility Study
Advertisements

St Andrews School A Tour Of The School By Daniella.
Want to see the inside of my House? Follow me, for a guided tour You MUST have PowerPoint viewer to see this presentation Click your mouse to advance the.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Welcome to Gladstone Primary School. We are a large school set over two sites… Juniors Infants & Nursery.
University of Connecticut-Stamford Campus Safety Orientation
How to get from the Nebraska Parking lot to the Mary Graydon Center.
N EXISTING FACILITIES BUILDING “A” -Principal’s Office -Workroom -(9) 3 RD Grade Classrooms - (4) 4 TH Grade Classrooms -Life Skills Classroom -Title.
Upper Level Copy Room Office Sanctuary Pastor’s Study To Epworth House Kitchen-Acolyte Lobby Courtyard Wesley Room Prayer Room Janitor Storage Nursery.
Congregation Survey Summary & Program Statement KATY first united methodist church August 30, 2009.
Campus signage – Internal
HADDON TOWNSHIP SCHOOLS ELEVATORADDITION FENCE REPLACEMENT REPLACEMENT REPAIR AND RECOAT ASPHALT PLAGROUND SURFACE REPLACE CONCRETE CURBING AROUND THE.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
Facilities Update Site Improvements Encinitas Union School District September 5, 2006.
The Kingdom Center Healing Streams Church & PAC Multi-Service Center.
6 th Grade Lunch Procedures. Lunch Bell Students with a 5 th period class upstairs should drop their things in their 5th period room, and line up for.
Church Renovation/ Expansion Proposals Willowdale.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
OFFICE SPACE | RETAIL AREA | RESTAURANT | FOOD COURT | BANQUET HALL.
3/22 Business English. Go up Turn left/right In front of Above/Below under Near/close to Opposite Next to Upper left/upper right Lower left/lower right.
4900 S ROUTE 31 CRYSTAL LAKE 1. AERIAL 2 PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
Proposed Alternative to the Curved Wall Concept Friends of the Orange Depot By J David Derosier 1.
Kitchen: fridge resting on debris blocking entrance to utility room.
UC Santa Cruz Engineering Building 2 69,000 ASF ~$47M.
A LL D ULLES A REA M USLIM S OCIETY. ADAMS CORE VALUES.
+ Kindergarten Orientation June 10th, Welcome to Kindergarten! St. Jerome Class of 2022 Current count: 17 students Supply list and contact.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Parent Informational Meeting April 10, 2013 Klein Multipurpose Building 6:30 p.m. Bernshausen Elementary.
Property: Block of Norzagaray-San Justo-San Sebastian Exact address: #251 Calle San Sebastian Viejo San Juan, PR.
Shady Acres Dallas Township Zoning. The Concept The following project will be displayed as a proposed development in the Dallas Township. It will be composed.
Q Building Remodel Update September 10, What We Started With…
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Layout as at 1 st July 2007 Public Rooms Offices/Reception Museum Cafe Friends of Museum Shop Physiotherapist Art Exhibition Staff Room Library.
BRANDON BAPTIST CHURCH MASTER PLAN 8/31/2015 BRANDON BAPTIST MASTER PLAN BRANDON BAPTIST CHURCH MASTER PLAN 1.
POV Renovations November 14,2014. Repairing the East Wall.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
BUILDING ANALYSIS Established in PG5 is a diverse building, consisting of the following:  Parking garage  Classrooms  food court (seats 300) 
Deerfield Elementary School Deerfield Elementary Overview of Deerfield Renovation October 8, 2015.
October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121.
Greater Mt. Zion Baptist Church 26 January 2014 Jackson Galloway Associates, PLLC.
Family Life Center / Youth Center 201 Music Office 216 – 217 Children’s Classroom 202 – 203 future use 218 Kid’s Klub 204 old sanctuary 219 – 220 Storage.
Learning, Health, and Safety Capital Project Alternates and Change Order
Coastal Commission Staff Presentation Item W11a, August 10, 2011 Hearing Applicants: Cheryl Pitt + Jeanne Harris Location: 614 Avenida Victoria, San Clemente.
Where Should I Study? A guide to good study habits and proper environments.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
Birds Eye view of the Vidyalaya. Entrance of the Vidyalaya.
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
St. Luke Lutheran Church
KENDRIYA VIDYALAYA DUNGARPUR (RAJASTHAN)
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
Erma Ora Byrd Hall – 1st (Ground) Floor
1 Semester Project Design A Multi Story Office Building
Erma Ora Byrd Hall – 1st (Ground) Floor
Advisory at Altadeña The purpose of Advisory is to strengthen connections on our campus. Each Advisory teacher has a small group of students they will.
Advisory at Altadeña The purpose of Advisory is to strengthen connections on our campus. Each Advisory teacher has a small group of students they will.
Cafeteria Entrance to media center
Cafeteria exit exit Entrance to media lobby 12
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
Erma Ora Byrd Hall – 1st (Ground) Floor
Park Place Wesleyan Gala 2019
Comparative Market Analysis - Commercial
LEE ACRES CHURCH OF CHRIST TUPELO, MISSISSIPPI
A. Write the correct numbers !
Presentation transcript:

Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street

The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose Building

Access ft of frontage on Gregg St Two Entrances - left side parallel to Lady St - right side next to building

Mezzanine Ladies / Mens Restrooms 497 sq ft Balcony 6 Admin offices behind Sanctuary Ladies / Mens Restroom in the hallway behind the Sanctuary

Easy flow from Mezzanine to Sanctuary to Multipurpose Hall Ladies lounge between Sanctuary and Multipurpose Hall Large reception area outside the Multipurpose Hall

Multipurpose Hall Lower Level 608 person capacity Adequate Storage Two small day care / nursery rooms Full Commercial kitchen Ladies / mens restrooms Access to elevator and stairs Drop off area access with overhang

Multipurpose Hall Upper Level Large lobby / waiting area Conference room Library Ladies / mens restroom 10 classrooms Elevator equipment room 1 office

Outside Area 2 Asphalt parking lots Bridge connecting the parking lots 521 sq ft storage building Playground Brick retaining wall Concrete sidewalks

Front View of the Church

Sanctuary

Sanctuary / Balcony

Office Area

Work Room

Multipurpose Hall Lower Level

Multipurpose Video

Commercial Kitchen

Front View Of Nursery 1

Rear View Of Nursery 1

Front View Of Nursery 2

Rear View Of Nursery 2

Elevator To Upper Level

Upper Level Waiting Area

Upper Level Hallway to Classrooms

Upper Level Multipurpose Hall Computer Room Inside Classroom Hallway Leading to Classrooms

Upper Level Conference Room

Upper Level Library

Left Side Rear To Gregg Street

Rear Drop Off Area

Bridge and Storage Shed

Gervais Side Parking Lot

Bridge Connecting Parking Lots

View from Gervais Street 2

Parking Lot View From Gervais Street