Utgangspunkt for PowerPoint presentasjoner

Slides:



Advertisements
Similar presentations
Chapter 23 Invoice Verification
Advertisements

Cost Estimation in a Construction Company Under the guidance of Prof. K. Narayanan Department of Humanities and Social Science Indian Institute of Technology,
Project Procurement Management
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
System Development Life Cycle (SDLC)
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Multi-Stage Bidding.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Chapter 12 Pricing Masonry Carpentry, and Finishes Work.
Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Project Procurement Management Mohammad A. Rob
Project Cost Management Estimation Budget Cost Control
Estimating Planning Estimating Planning Controlling.
/1.401/ESD.018 Project Management Lecture 20 Project Reporting Project Close-out Samuel Labi and Fred Moavenzadeh Massachusetts Institute of Technology.
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
-P&ID- Piping & Instrument Diagram
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Vladimir Liberzon Oksana Sakhraui Victoria Shavirina Spider Management Technologies, Moscow, Russia
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
On Target Group Coaching for Painting Contractors November 6, 2014.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Chapter 11 Subcontractor Work. Introduction Subcontractors perform 80% or more of the on-site work in residential construction. Often, the homebuilder.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Project Life Cycle.
Template v5 October 12, Copyright © Infor. All Rights Reserved. 1 Infor LN: v v10.4 Estimating Differences Rollout training.
Chapter 2 Introduction to Construction Procedures
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Measurement and Payment
Collaboration of Entitlement and Cost Efforts in Claims Analysis Rubino & McGeehin Consulting Group June 27, 2005.
Agenda – JOC Gordian Construction Task Catalog Understanding the Construction Task Catalog ® (CTC) Calculating the Bid Contractor Adjustment Factors Risk.
CEE 492 Lab Session #1 February 3, CEE 492 RS Means –Introduction –Exercise ICE MC2 –Installation –Introduction and Overview Outline.
SAP MM ONLINE TRAINING Call for free demo:(201) by.
CEE 492 Lab Session #1 February 3, CEE 492 RS Means –Introduction –Exercise ICE MC2 –Installation –Introduction and Overview Outline.
AASHTO Trns port TM SiteManager TM and Estimating 1998 TEA October 27, 1998 Portland, Maine.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
ERP/QMS by PMI Aerospace ERP/QMS by PMI Aerospace
Project Management – PTM712S
Title of presentation Name(s) of author / presenter / co-authors
+ WHY KNOWIFY MAKES SENSE FOR GAF FACTORY-CERTIFIED CONTRACTORS
Chapter 3: Cost Estimation Techniques
CONTRACT ADMINISTRATION
Red flags OLAF.D.2 – Fraud Prevention, Reporting and Analysis Unit
BIM EXECUTION PLANNING PROCESS
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Copyright Scott Bloss, All rights reserved.
Introduction to project accounting
9/18/2018 Bids CONTRACTING Khamis…..
Leading Indicators and Dashboarding for Advanced Work Packaging
BIM EXECUTION PLANNING PROCESS
Engineering Processes
Using WolfePak to Manage Your Service Business
PROJECT MANAGEMENT (BSBI 622)
ARCH 435 PROJECT MANAGEMENT
MINISTRY OF ECONOMY AND FINANCE
Construction Contracts
Industrial Technology Timber Stage 5
Certified Cost or Pricing Data vs
Presentation transcript:

Utgangspunkt for PowerPoint presentasjoner Omega Utgangspunkt for PowerPoint presentasjoner

Quantity Management (QMS) Designed for Company / Client verification of contractors measurement

Introduction Currently the Quantity Mgmt module contains two sub modules Contract Evaluation Measurement Verification Sutable for time and material contracts Price elements for man-hour norm and material unit rate (Compensation Codes) Quantity * Norms and Rates = Man-Hours, Labor Cost, Material Cost and Total Cost

Time and Material Contract Example Typical Compensation format in Norway

Evaluation Compare bidders Analyze norms and rates FEED MTO Compare bidders Analyze norms and rates Scenarios / Normalizing Identify «tactical priced norms and rates» Compensation Codes Scenarios Bidders Norms and Rates Compare Reports

Contract Evaluation (Demo) Compensation Codes & CBS Scenarios Bidders Compare Bids Norms and Rates Analyzer

Measurement Tool for Company’s verification of Contractor’s measurement and management of quantity update estimates that provides a continuous interpretation of Scope of Work into man-hours and cost through to final account. Deviations, cost changes and inconsistencies can be identified and managed at the earliest possible stage. The tool is divided in two main areas: Quantity Update – Estimates in line with Weight Reporting Quantity Measurement – A/IFC and As-built measurement

Quantity Update Project Duration 100% Scope Estimate IFC Quantities As-Built Quantities 100% Scope

Quantity Update Demo Estimate (Forecast) Scenarios Can be activated / deactivated in estimate Archive Estimate and MTO development Scenarios

Measurement Approaches 100% As-Built Verification (Heavy workload) Spot Check of As-Built Continuous verification -> Feedback to Contractor

Measurement data flow example Always use contractor’s measurement 100%, incl. errors and missing data. Contractor 100% transmissions, Incl. Errors, disagreements e.a Feedback Agreed measurement adjustments Company Disagreements Own measurement on the few items we definitive disagree on

Measurement Simplified Model Contractor a Contractor’s MTO 1 Quantity Update 2 b Compensation Codes 3 MTO 4 Estimate 5 Client

Measurement (Demo) MTO Information Library Reporting

What is there to check ? Reimbursable items (Not be measured) Tag or articles installed by vendors on equipment packages Compensation code Material Take Off (MTO) on document’s Article weight QtyMgmt Void item’s on documents and index Article length Doc MTO Art Clarifications Duplications in articles, documents or MTO (X) Item's that should be included in other articles with a general compensation code Tag or articles that should be measured in other phases (Hook-up) ATS-MC work paid both in measure and invoice