Steven J. Maheras International Conference on the Management of Spent Fuel from Nuclear Power Reactors: Learning from the Past, Enabling the Future June.

Slides:



Advertisements
Similar presentations
Adam H. Levin AHL Consulting May 14, BWR – Boiling Water Reactor DOE – Department of Energy DSC – Dry Storage Canister ISF – Interim Storage Facility.
Advertisements

ENVIRONMENTAL UNIT IN AN ICS STRUCTURE. EU Mission Statement The Environmental Unit is established to provide technical and scientific expertise and capabilities.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Near Term Planning for Storage and Transportation of Used Nuclear Fuel Jeff Williams Project Director Nuclear Fuels Storage and Transportation Planning.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
John Wagner Oak Ridge National Laboratory Nuclear Fuels Storage and Transportation Planning Project U.S. Department of Energy 10 th Meeting of the U.S.-Argentina.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
California Energy Commission James Madigan April 27, 2015.
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
U.S. Nuclear Regulatory Commission: Proposed Tribal Policy Statement National Tribal Air Association February 26, 2015 Michelle Ryan, Intergovernmental.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Presented to: National Spent Nuclear Fuel Program Presented by: Ned Larson, Director Infrastructure Development Division Office of National Transportation.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
TRANSPORTATION OF USED FUEL December 2015 Pierre OneidJack Edlow Holtec InternationalEdlow International Company.
IAEA International Atomic Energy Agency. IAEA Outline Responsibilities and functions of the regulatory body Objectives of regulatory functions Organizational.
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy Current Status of Shutdown Sites Activities Vermont.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Licensing Renewal of Operating License Periodic.
Low-Level Radioactive Waste (LLW) Disposition at the
On-site Storage of Spent Nuclear Fuel in the United States
Analysis of Low Activity Waste Streams and Volumes in Decommissioning NPPs  Lisa Edwards Sr. Program Manager, EPRI LLW Forum April 13-14, 2016.
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
Preliminary Assessment Tribal Emergency Response Preparedness
Decommissioning Issues
Emergency Preparedness During Decommissioning
John Christian President, Logistics, Processing and Disposal
NEHLRW Transportation Taskforce Meeting June 8, 2016 Orlando, FL
3 Yankee Companies Update and Perspective on SNF Issue
At-Risk Nuclear Plants: Challenges and Opportunities
TA-V eB Performance Improvement Overview
THAILAND Training and Tutoring Feedback
Vermont Yankee Decommissioning Update
Section 180c Ad Hoc Working Group
Janet R. Schlueter Senior Director, Radiation and Materials Safety
South Carolina Perspective on Part 61 Proposed Revisions
Brazil - Training and Tutoring Feedback Second Coordination Meeting
Spent Nuclear Fuel and Waste Disposition Program Update
Updating the NRC’s Alternative Disposal Request Guidance Document
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
Joseph D. Anderson, Chief
Flooding Walkdown Guidance
CR3 and Crystal River Energy Complex
Nuclear Waste Storage Current Status and Plans
DOE’s Centralized Storage Design Alternatives and Security Regulations Jeff Williams Project Director, Nuclear Fuels Storage and Transportation.
Radioactive Material Security: Current Activities
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Communication and Consultation with Interested Parties by the RB
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Possible Transition from Operating to Decommissioning
Decommissioning Rulemaking
Legal and Regulatory Framework for Nuclear Installations in IRAN
Spent Fuel Storage and Transport for Shutdown and Decommissioning Nuclear Plants Rod McCullum November 28, 2018.
Tribal Radioactive Materials Transportation Committee (TRMTC)
Reviewing Governmental and Regulatory Responsibilities
Nuclear Decommissioning Citizens Advisory Panel (NDCAP) Certificate of Public Good (CPG) – Second ISFSI Pad & New 200 kW DG May 28, 2015.
Presentation transcript:

Steven J. Maheras International Conference on the Management of Spent Fuel from Nuclear Power Reactors: Learning from the Past, Enabling the Future June 24-28, 2019 Vienna, Austria Lessons Learned in Planning for the Removal of Spent Nuclear Fuel from Shutdown Nuclear Power Plant Sites in the US

Disclaimer This is a technical presentation that does not take into account contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (10 CFR Part 961). For example, under the provisions of the Standard Contract, DOE does not consider spent fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this presentation conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. This presentation reflects research and development efforts to explore technical concepts which could support future decision making by DOE. No inferences should be drawn from this presentation regarding future actions by DOE.

Nuclear Power Plant Site Evaluations The purpose of site evaluations is to support planning for removing spent nuclear fuel (SNF) and greater-than-Class C (GTCC) waste from nuclear power plant sites Site inventory Site conditions Near-site transportation infrastructure and experience Identify gaps in information needed to ship SNF and GTCC waste from the nuclear power plant sites Based on the available information, identify options for transporting SNF and GTCC waste from nuclear power plant sites

Current Shutdown Nuclear Power Plant Sites There will be 648 total canisters (609 SNF, 39 GTCC waste) at 15 shutdown sites There are 12 dry storage systems in use at the shutdown sites; 10 transportation cask models would be used to remove SNF and GTCC waste from the sites Key SNF – spent nuclear fuel canisters GTCC – canisters of greater-than-Class C waste ORANO System SNF 198; GTCC 21 NAC System SNF 205; GTCC 12 Holtec System SNF 199; GTCC 5 EnergySolutions System SNF 7; GTCC 1 Trojan SNF 34; GTCC 0 Humboldt Bay SNF 5; GTCC 1 Rancho Seco SNF 21; GTCC 1 Zion SNF 61; GTCC 4 La Crosse SNF 5; GTCC 0 Big Rock Point SNF 7; GTCC 1 Maine Yankee SNF 60; GTCC 4 Yankee Rowe SNF 15; GTCC 1 Connecticut Yankee SNF 40; GTCC 3 Crystal River SNF 39; GTCC 5 (Estimated) Kewaunee SNF 38; GTCC 2 (Estimated) San Onofre SNF 123; GTCC 11 (Estimated) Vermont Yankee SNF 58; GTCC 2 (Estimated) Fort Calhoun SNF 40; GTCC 2 (Estimated) Oyster Creek SNF 63; GTCC 2 (Estimated)

The Site Evaluation Process Planning starts before site closes when site research begins GC-859 spent nuclear fuel database Environmental Impact Statements and Environmental Impact Reports Facility Interface Data Sheets (FIDS), Services Planning Documents (SPDs), Facility Interface Capability Assessment reports (FICAs), and Near-Site Transportation Infrastructure reports (NSTIs) Local newspaper articles, industry publications (StoreFuel) Google Earth imagery Site visit is scheduled after site closes and fuel is removed from the reactor vessel Schedule site visit before staff begin to depart Develop list of participants U.S. Department of Energy and National Laboratory staff Tribal and state representatives, State Regional Group representatives, and Federal Railroad Administration representatives

The Site Evaluation Process Develop agenda with the site, local railroads, and community engagement panel Typical site visit is three days Develop list of questions for the site General site questions Operating and shutdown spent nuclear fuel management Site heavy load transportation experience, and on-site and near-site large/heavy load transportation infrastructure and capabilities Cultural affiliation and tribal involvement Submit to site one month before visit Continuous coordination with the site and among participants required Hotels, logistics, security paperwork, etc. Sharing of information and data before and after site visit facilitated by using CURIE website Write report Draft site sections provided to sites for review

Site Evaluation Lessons Learned #1 Importance of Safety Site visits involve field work in nuclear and railroad environments The railroad environment in particular has unique hazards For this reason, morning safety briefings are conducted each day of a site visit Personal protective equipment is worn, as appropriate

Lessons Learned #2 Importance of Preparation The success of a site visit depends greatly on the background research performed prior to the site visit This preparation takes the form of collecting and reviewing the data sources collected during site research Site-specific questions are developed and submitted to the site approximately one month prior to the visit. Each shutdown site visit team member is typically assigned an area of responsibility and prepares the questions for their area

Lessons Learned #3 Length of Questions Submitted to the Sites The length of the site-specific questions submitted to the shutdown sites has varied between 2-8 pages Based on experience from the site visits, the optimum number of pages to gather necessary information without overwhelming the site staff, appears to be 4-6 pages

Lessons Learned #4 Importance of Photographs to Provide Documentation of Site Conditions Photographs taken during the site visits have been important in documenting conditions that exist to the shutdown sites Photographs are typically geo-tagged to enable the files to be easily imported into DOE’s Stakeholder Tool for Assessing Radioactive Transportation (START) web-geographic information system to visualize transportation routes and features like potential transload sites

Lessons Learned #5 Importance of Compiling Notes at the Conclusion of Each Day It has been the practice to review and compile the groups’ notes from the site visits at the conclusion of each day, so that memories and recollections are fresh Done most efficiently in a group setting using a projector and screen

Former Onsite Rail Spur Lessons Learned #6 Importance of Tools such as Google Earth The availability of tools such as Google Earth has eliminated the need for paper maps The imagery contained in Google Earth enables commercial nuclear power plant sites, independent spent fuel storage installations, roads, rail lines, potential transload locations, and barge slips or docks to be easily identified, mapped, and distances determined Former Onsite Rail Spur Cargill Rail Spur

Lessons Learned #7 Importance of Identifying Issues associated with the Spent Nuclear Fuel Inventory US Nuclear Regulatory Commission regulation 10 CFR 72.48 allows changes to be made in an independent spent fuel storage installation or spent nuclear fuel storage cask design as described in the final safety analysis report (FSAR); or in the procedures described in the FSAR; and conduct tests or experiments not described in the FSAR—provided that certain conditions are met In addition, licensees may also request exemptions from the U.S. Nuclear Regulatory Commission (NRC) from the requirements contained in 10 CFR Part 72. Making these changes or exemptions granted could result in a dry storage canister not being transportable as the canister might not meet the requirements contained in 10 CFR Part 71

Lessons Learned #8 Importance of Capturing Data and Experience Shortly After Shutdown The number of site personnel reduces dramatically, from roughly 600-800 to 120-150 in the 18-month period following shutdown Further personnel reductions to less than 50 on-site may be encountered if the site decides to move the facility into long-term safe storage before decommissioning begins years later Therefore, the collection of the data from the site could represent a challenge if data collection is delayed Some data may no longer be available, due to the site closure and staff departures

Lessons Learned #9 The Importance of Building Relationships with the Shutdown Sites A key part of the shutdown site evaluations is the information obtained from personnel at the sites Site personnel have provided: Data on spent nuclear fuel to augment the data contained in the GC-859 and RW-859 spent nuclear fuel databases Information on how large components were shipped on and offsite Photographs of past activities at their sites The opportunity to directly observe onsite infrastructure, spent nuclear fuel storage installations, and near-site transportation infrastructure The opportunity to take photographs at the site, which provides documentation of site conditions

Lessons Learned #10 Importance of Including Tribal and State Representatives, State Regional Group Representatives, and Federal Railroad Administration (FRA) Representatives in the Site Visits FRA and State Rail Safety Participation Program representatives provide expertise in the five primary railroad safety technical disciplines—track, motive power and equipment, operating practices, signals and train control, and hazardous materials FRA also coordinates meetings with the rail carriers that serve the shutdown sites State representatives typically represent their state department of energy, state department of environmental or natural resources, state police, state department of transportation, radiation protection organization, or emergency management organization, and provide expertise in these areas Tribal representatives provide expertise associated with cultural affiliation and tribal involvement with past and present site activities

Future Shutdown Nuclear Power Plant Sites (2019-2025) Diablo Canyon (2024 and 2025) Palisades (2022) Davis-Besse (2020) Beaver Valley (2021) Perry (2021) Pilgrim (2019) Indian Point (2020 and 2021) Three Mile Island (2019) Duane Arnold (2021)

Future Work – Nuclear Power Plant Site Evaluations New version of shutdown sites report (SSR) due on November 30, 2019 Oyster Creek will be added to the new shutdown sites report Planning for Pilgrim and Three Mile Island site visits will start in FY2019 Pilgrim will be visited in Fall 2019/Spring 2020 (estimated) TMI will be visited in Spring 2020 (estimated) Continuing to collect data on conditions at the sites Additional SNF discharge data Additional information on storage systems in use at the sites Additional information on the local transportation infrastructure and transload locations around the sites Potential visits to Maine Yankee, Connecticut Yankee, and Yankee Rowe Summer/Fall 2019 to evaluate rail infrastructure FRA not included in original site visits Planning for additional sites will occur as they shut down, such as Indian Point, Davis-Besse, Duane Arnold, Perry, Beaver Valley, Palisades, and Diablo Canyon Photo courtesy of Pacific Northwest National Laboratory

Questions?