ACCSYS Collaboration Board Triestre, 3rd october 2017

Slides:



Advertisements
Similar presentations
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Advertisements

ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
Neutron background measurement at LNGS: present status Measurement carried out in collaboration between LNGS ILIAS-JRA1 and ICARUS groups.
experimental platform
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
ESS cavities interfaces
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
Low Emittance RF Gun Developments for PAL-XFEL
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
Dave McGinnis Chief Engineer – Accelerator Division
CAS, BilbaoMueller, Ugena, Velez, Zerlauth May 31 st v0 SCC – Industrial ADS.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Anders Sunesson RF Group ESS Accelerator Division
Manufacturing process, validation and factory test
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
ESS wire scanner Benjamin Cheymol
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
M. Munoz April 2, 2014 Beam Commissioning at ESS.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
ESS Program Plan and Schedule Update
SC Activities at IAP Frankfurt
Status of the M-ECCTD F. Peauger - P. Bosland
Bruno POTTIN, Anne-Catherine CHAUVEAU
RF cell Anders Sunesson RF group leader
Cryomodule test stand at ESS site
WP5 Elliptical cavities
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Overview and System Design for ESS LLRF Systems
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
WG-1 Session Cavity Performance Cryomodule Performance
Physics design on Injector-1 RFQ
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
WP11: electron and proton beam testing
of secondary light ion beams
High Gradient Cavities: Cost and Operational Considerations
Superbeams with SPL at CERN
CEPC RF Power Sources System
Implications of HOMs on Beam Dynamics at ESS
ADS Accelerator Program in China
Explanation of the Basic Principles and Goals
Daresbury ESS In-Kind Contributions
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
CLIC Feasibility Demonstration at CTF3
(Beam) Commissioning Plan
System tests at CEA O. Piquet 19/03/2019
Pierre Bosland – on behalf of the ESSI team (ESS Irfu)
RF introduction Anders Sunesson RF group leader
SNS-PPU upgrades the existing accelerator structure
Roger Ruber for the FREIA team 11 June 2013, Uppsala
Presentation transcript:

ACCSYS Collaboration Board Triestre, 3rd october 2017 Anne-Isabelle ETIENVRE

Elliptical Cryomodules Medium b Demonstrator (M-ECCTD) tests results High Beta cavity vertical tests result Almost ready for production … 2. RFQ Status 3. Beam Instrumentation 1. NPM 2. nBLMs

ESS ELLIPTICAL CRYOMODULES IMAGE CEA – IRFU 2018 CEA Saclay/Irfu projet ESS | DATE

ESS ELLIPTICAL CRYOMODULES M-ECCDT : medium beta demonstrator IMAGE CEA – IRFU 2018 CEA Saclay/Irfu projet ESS | DATE

M-ECCTD : top view of saclay test stand ACCSYS Collaboration Board Triestre, October 2018

1st HIGH RF POWER TESTS at 1 MW and 2K 14Hz ; Nominal Field (> 16,7 MV/m) ; RF peak power : 1,1MW ; RF pulse length 3,6ms With Lorentz forces compensations (Piezo) Without Lorentz forces compensations (Piezo) MV/m MV/m Zoom Happy CEA team ! MV/m ACCSYS Collaboration Board Triestre, October 2018

ESS ELLIPTICAL CRYOMODULES H-ECCDT : high-beta demonstrator IMAGE CEA – IRFU 2018 CEA Saclay/Irfu projet ESS | DATE

H-ECCTD : 1st high betaq bare cavity vertical cryostat measurements High b Cavity tuning ACCSYS Collaboration Board Triestre, October 2018

ESS ELLIPTICAL CRYOMODULES COMPONENTS PRODUCTION LAUNCHED IMAGE CEA – IRFU 2018 CEA Saclay/Irfu projet ESS | DATE

CRYOMODULES COUPLERS : on track pre-serie components conditioned 1.2 MW 10 prototype couplers already conditioned with success + 6 pre series CM couplers (medium b) delivered at Saclay 5 fully conditionned 1 partially conditionned ACCSYS Collaboration Board Triestre, October 2018

Cryomodules : Delivery of pre-serie components ACCSYS Collaboration Board Triestre, October 2018

RFQ CEA Saclay/Irfu projet ESS | DATE

RFQ CAVITIES / Section 1 assembly trial ACCSYS Collaboration Board Triestre, October 2018

RFQ – SKID INStalled in june 2018 (Lund) ACCSYS Collaboration Board Triestre, October 2018

RFQ couplers conditioned at nominal performances + margins with ICS contribution Control System for couplers conditioning Test cavity with both couplers ready for conditioning Power Vacuum Temperatures 48 hours long conditioning (1 MW – 3.6 ms – 14 Hz) ACCSYS Collaboration Board Triestre, October 2018

NON INVASIVE PROFILE MONITORS BEAM INSTRUMENTATION NON INVASIVE PROFILE MONITORS & BEAM LOSS MONITORS CEA Saclay/Irfu projet ESS | DATE

Beam instrumentation : profile monitor Measures on IPHI facility before CDR planned in december IPHI platform IPM CCD camera & control system IPM with strips read-out ACCSYS Collaboration Board Triestre, October 2018

nBLMs : differents tests before CDR planned in december BEAM INSTRUMENTATION nBLMs : differents tests before CDR planned in december Beam tests at different irradiation facilities in 2018 IPHI CEA/Saclay 3 MeV p on Be target and Al endcap AMANDE, IRSN,Cadarache Monoenergetic n or γ+n yields MC40, Birmingham, UK 28 MeV p on Al target Linearity with beam current 28 MeV proton beam on an aluminum target Time Response Fast module: Immediate response, count rate has a direct correlation with beam current intensity. Slow module : most of events recorded within 100-200μs, but higher efficiency. Still ~5% of events will be register within 5μs Gamma to neutron suppression γ sensitivity with resect to neutrons 10-3-10-4, depending on threshold Higher threshold  stronger suppression but with efficiency loss Complete suppression possible. Operation point to be chosen according to actual conditions ACCSYS Collaboration Board Triestre, October 2018

ORPHEE nuclear reactor nBLMs efficiency measurements Detector Efficiency ORPHEE nuclear reactor LLB, CEA Saclay 0.01 eV neutrons, flux 2×106 s-1 cm-2 Analysis ongoing Stable operation with high current (up to 600 nA), no discharges Verified that 5 mm Borflex absorbs completely the thermal neutrons study the detector operation parameters (B4C thickness, drift gap, operating voltages) to optimize signals (duration, amplitude etc.) Planning CEA Saclay SPR: 110 GBq AmBe, Co, Cs sources CEA Saclay: cryo-module testing CERN Linac4: Installed a detector in the hall (without interfering!) in Aug 2018. Profit from on-going run to test response, backgrounds, BEE (November) in most similar(?) conditions available to the ESS linac Other tests Fast detector Slow detector Dependence with neutron energy Mylar vs Polypropylene Dependence with neutron energy Double efficiency when 1 mm polypropylene is used instead of 100 μm Mylar. However, we choose the Mylar due to the stability of the metallization, sacrificing a factor 2 in count rate. Dependence with polyethylene Dependence with EDEP threshold For the slow detector the area of the moderator is used for the calculation (25×25 cm2) While for the fast the active zone (8×8 cm2) ! Moderator thickness chosen for final detector: 5 cm ACCSYS Collaboration Board Triestre, October 2018

Conclusion CEA Saclay/Irfu projet ESS | DATE

1. RFQ : machining of cavities seems to be under control Conclusion 1. RFQ : machining of cavities seems to be under control 2. Elliptical Cryomodules : production phase is launched and assembly will start in january with industrial team. 3. Beam Instrumentation / Diagnostics : several mesures are going on to demonstrate performances before CDR milestones.

Thank you for your attention CEA Saclay/Irfu projet ESS | DATE