Saturday 10:00: Cryo Pt8 back, starting the pre-cycle.

Slides:



Advertisements
Similar presentations
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Advertisements

08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday :12 Stable beams fill 3351 Initial luminosity
Luminosity lifetime – fill 2932
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Summary of week 7 Hardware Commissioning:
Monday 11/07: Recovery Plenty of accesses.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Summary of ion week 48 Last beam OP summary of 2010 Week 48
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Thursday morning – optics correction
Barbara Holzer, Jorg Wenninger
Monday 6th August & night
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Wednesday 31 October: Morning
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Summary of Week 16 G. Arduini, J. Wenninger
Bernhard Holzer, Joerg Wenninger
Mike Lamont, Jorg Wenninger
Saturday 4.12 Beam in the SPS at 09:30 Beam in the LHC at 10:00
LHC Morning Meeting - G. Arduini
Chromaticity can make a difference…
Tuesday Loss maps in the night:
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Thursday :00: Physics fill from the night shift
Yesterday Power back around lunchtime Access until 12:30
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 03/11 – The Plan Finish electron-cloud program:
Programme for Saturday 10 July
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 24 October hours of 25ns MD
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
Saturday Nov Stop proton operation. Switch back to ions
Tue/Wed 12/ :00 Probe beam back again
SP & CP கொடுக்கப்பட்டால் இலாபம்/நட்டம் கண்டறிதல்
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
07/08/2010 Fill #1264 dump at 02:14:38.
Find profit or loss value
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC - Week 38 Technical stop: Katy Foraz
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday In the morning test cycle with probe for Q’ measurement.
Given S.P and C.P Find Profit or loss % Start.
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 24 September 2011.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Monday 27th August & night
Wednesday 14:30 Fill 2011 dumped.
Wednesday morning / afternoon
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Wednesday 6.10 Morning: Quench test at 450 GeV
Saturday 26 November 2011.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Tuesday
Presentation transcript:

Saturday 10:00: Cryo Pt8 back, starting the pre-cycle. 11:00 LHC ready, but SPS bump kicker problem – switch exchange + reconditioning. 15:00 Injecting ! LBDS arming issues (self trigger). Checked by experts but not understood. We manage to carry on. 16:00 Pt8 compensator off. 17:00 We decide to carry on as repair lengthy (2 ½ hours) and we can live without. 18:00 POPS off. 19:30 Filling again. Problem with losses at injection. B1 dumped with 144b. 9/14/2019 LHC 8:30 meeting

Saturday 20:30 BA2 & BA5 flooded – SPS off. 22:00 S81 and S78 switched off – water alarms in Pt8, later also in Pt2 and 1.8. 02:00 Inspections show that there is no water in the LHC buildings. 9/14/2019 LHC 8:30 meeting

SPS BA2 9/14/2019 LHC 8:30 meeting

SPS BA2 - tunnel 9/14/2019 LHC 8:30 meeting

SPS BA2 9/14/2019 LHC 8:30 meeting