Advanced Implantation Detector Array (AIDA)

Slides:



Advertisements
Similar presentations
Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics The University of Edinburgh presented by Tom Davinson on behalf.
Advertisements

Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics & Astronomy The University of Edinburgh presented by Tom Davinson.
Technical Solutions for High Vacuum Compatible FEE for the EXL Recoil Detector Vacuum operating pressure? bakeout temperature? what’s in the vacuum system,
Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics The University of Edinburgh presented by Tom Davinson on behalf.
Decay Spectroscopy at FAIR Using the Advanced Implantation Detector Array (AIDA) presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh.
Decay Spectroscopy at FAIR Using the Advanced Implantation Detector Array (AIDA) presented by Tom Davinson on behalf of the AIDA collaboration Tom Davinson.
Decay Spectroscopy at FAIR Using the Advanced Implantation Detector Array (AIDA) presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh.
AIDA Update presented by Ian Lazarus on behalf of the AIDA collaboration (Edinburgh – Liverpool – STFC DL & RAL) Tom Davinson School of Physics & Astronomy.
Advanced Implantation Detector Array (AIDA): Update & Issues presented by Tom Davinson on behalf of the DESPEC-DSSD/AIDA collaboration Tom Davinson School.
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
D S Judson UNTF Forum Salford. Outline The Compton imaging process The PORGAMRAYS project What is it? How does it work? Detector description Spectroscopic.
Semiconductor detectors for Compton imaging in nuclear medicine
ASICs for HiSpec and DeSpec Ian Lazarus NPG. Hispec and Despec.
AIDA Update presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh – Liverpool – STFC DL & RAL) Tom Davinson School of Physics & Astronomy.
Informatikdienste / IT-Services 30. Jan :T. Steiger, ID / SD, Beowulf Day Status Report of Implementations Gonzales.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Vacuum and cryogenic systems in R5.2 for MICE Presentation to the MICE/ISIS Operations meeting on 16/03/2015.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June
Decay Spectroscopy at FAIR with AIDA presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh – Liverpool – STFC DL & RAL) Tom Davinson.
9th October 2008AIDA FEE progress report P.J.Coleman-Smith 1 AIDA Frontend Electronics progress report. Mezzanine to FEE64 connection. Mezzanine Layout.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
Advanced Implantation Detector Array (AIDA): Project Summary & Status Tom Davinson School of Physics & Astronomy The University of Edinburgh presented.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
M. Labiche - INTAG workshop GSI May Se - D prototype for the focal plane of the PRISMA spectrometer (Task4) Digitisers for SAGE & LISA (task1)
Tom Tom Davinson School of Physics DESPEC DSSD Working Group Status & Open Issues.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
Wire Bonding and Analogue Readout ● Cold bump bonding is not easy ● Pixel chip is not reusable ● FE-I3 is not available at the moment ● FE-I4 is coming.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
27 th September 2007AIDA design meeting. 27 th September 2007AIDA design meeting.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
Future for (Stopped) RISING.....the road to DESPEC.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
1 Mice Collaboration Meeting CM28 Bankya Palace Spa Hotel, Sofia, Bulgaria 3 rd -8 th Oct 2010 Daresbury Laboratory Spectrometer Report Authors : Ian Mullacrane.
Development of a Segmented Planar Germanium Imaging Detector
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
System Online August 20, :54:07 CET 8 th Annual CEENet Network Technology Workshop.
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
AIDA FEE64 production report January 2011 Manufacturing Power Supply FEE64 revision A “3 hour test” 19th January
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
AIDA 1 20 Heatsink units, locating pins and washers now on site. Status of Electronics Module.
Front end electronics and system design for the NUSTAR experiments at the FAIR facility Presented by Ian Lazarus on behalf of NUSTAR collaboration FEE.
Status of the Solenoid Status of procurement Plans for transport Storage and tests on arrival at CERN Installation in the ISOLDE Hall Location Footprint.
Status of the Advanced Implantation Detector Array (AIDA) BRIKEN Collaboration Workshop Valencia, July 2015 Alfredo Estrade on behalf of the AIDA collaboration.
AIDA: introduction Advanced Implantation Detector Array (AIDA) UK collaboration: University of Edinburgh, University of Liverpool, STFC Daresbury Laboratory.
Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics The University of Edinburgh presented by Tom Davinson on behalf.
Search for Proton Radioactivity in the Trans-lead and Sub-tin Regions Zhong Liu University of Edinburgh On behalf of the AIDA Collaboration (Edinburgh,
GEM Integrated PCB readout and cooling
MPD Data Acquisition System: Architecture and Solutions
MICE RF System Power Supplies, Control and Monitoring Status report
Injectors BLM system: PS Ring installation at EYETS
Large Area Endplate Prototype for the LC TPC
ATF2 Magnet Power Supplies
352MHz Klystron Control for the 3MeV Linac test stand
Search for Proton Radioactivity in the Trans-lead and Sub-tin Regions
Assembly order PCB design
AIDA: introduction Advanced Implantation Detector Array (AIDA)
FEE Electronics progress
AIDA Commisioning Test
Advanced Implantation Detector Array (AIDA)
Advanced Implantation Detector Array (AIDA)
Advanced Implantation Detector Array (AIDA)
Presentation transcript:

Advanced Implantation Detector Array (AIDA) HISPEC/DESPEC meeting 24 September 2018 presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh – Liverpool – STFC DL & RAL) Tom Davinson School of Physics & Astronomy The University of Edinburgh

AIDA Support Stand – the plan 8cm x 8cm & 8cm x 24cm DSSSDs Overhead services routing ac mains power 2x Gbit Ethernet cooling water White Rabbit etc Temperature controlled cooling water +20 ºC https://www2.ph.ed.ac.uk/~td/AIDA/Information/information.html

S4: AIDA + FATIMA

AIDA DSSSD: MSL type BB18(DS)-1000 Detail – 1 (of 4) connectors, strips, bond wires, bias ring, multi-guard ring, field plate etc

AIDA DSSSD: cabling Kapton PCB + 3M 1245 wrapped Samtec ribbon cables

AIDA: snout and FEE64s

AIDA: 19” rack hardware For 4x 8cm x 8cm DSSSDs (1024 channels) USB-controlled ac mains relay FEE64 PSUs Gbit network switch MACB WR timestamp distribution Pulser Detector bias

Done Remote control ac mains relay FEE64 PowerPC system consoles detector bias Power interlocks dew point water flow 1x MSL type BB18(DS)-1000 installed day 1 noise ~40-60keV FWHM – to be improved AIDA operational in standalone mode

To Do Plastic scintillator Install 2x plastic scintillator plus 3x DSSSDs White Rabbit ( ‘Mark 2’ ) merger Vic Pucknell & Patrick Coleman-Smith debugging using AIDA test system at STFC DL Test correlations with FATIMA using pulser and radioactive sources Test online analysis software

Acknowledgements AIDA collaboration http://www2.ph.ed.ac.uk/~td/AIDA/welcome.html Edinburgh Peter Black, Carlo Bruno, Oscar Hall UKRI STFC Daresbury Laboratory Ian Burrows, Mike Cordwell, Alan Grant GSI Juergen Gerl, Magda Gorska, Nik Kurz, Henning Schaffner, Karl Heinz ?