AIXM 5.2 – WIP AIXM CCB – Webex 10 OCT 2017.

Slides:



Advertisements
Similar presentations
Translation and Translation Verification National Research Coordinators Meeting Amsterdam, October 2006.
Advertisements

Configuration Management
The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
AIXM Status Report Delivering Digital Services
Delivering Digital Services SESAR AIRM Status Report Presented By: Hubert LEPORI EUROCONTROL Date:August 26, 2014.
EUROCONTROL’s Efforts with AIXM
Integrating information towards Digital ATM Information Structures - AIXM - Presented By: Eduard Porosnicu, Eurocontrol Date:August 27, 2013.
Training Session Product File Notes and Registration Reports, 23 October Registration Report: General aspects M. Trybou Federal Public Service of.
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
The European Organisation for the Safety of Air Navigation EUROCONTROL’s Efforts with AIXM AIXM 5.1 XML Developers' Seminar #4 – Mar 2010.
The European Organisation for the Safety of Air Navigation AIXM Support for Digital NOTAM AIXM XML Developers’ Seminar #5 23 March 2010.
Roadmap Phase 2 EAD & AICM By: Eduard Porosnicu, AIM Expert 7-8 October 2009 ACAC – AIM Workshop.
AIXM - purpose, scope, implementation and future evolution.
The European Organisation for the Safety of Air Navigation AIXM 5.1 Seminar Introduction.
AIXM XML Schema aspects. Copyright EUROCONTROL 2011 AIXM 5 – Design Objectives Capabilities Extensibility Flexible Exchange Flexible Messages Static and.
AIS-AIMSG/12 Briefing to ANC AIS-AIMSG/12 Briefing to ANC 23 October 2015.
COMET Working Group Progress Report 11/13/03
AIS-AIMSG/12 Briefing to ANC 23 October 2015
FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM
Wrap-up and Next steps Donatella & Bri
5-7 DEC 2016, EUROCONTROL HQ, Brussels
AIXM 5.1 – Metadata AIXM CCB – Webex 18 JULY 2017.
AIXM 5.1 – Interoperability issues
AIXM – Work in Progress AIXM CCB – Webex, 24 JAN 2014.
Digital AIM Training - AIXM
Messaging support FIXM 4.0 Guidance Materials
AIXM – Work in Progress AIXM CCB – Webex, 07 FEB 2014.
FIXM – GUFI Manfred Beckmann (SOLITEC)
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Chapter 6 Sub-Group ICAO Headquarters, November 2013
AIXM 5.1 – Interoperability issues
AIXM 5.1 – Interoperability issues
AIXM 5.2 – WIP AIXM CCB – Webex 20 nov 2017.
AIXM 5.2 – WIP AIXM CCB – Webex 09 MaY 2017.
Marine Strategy Framework Directive (MSFD)
AIXM CCB meeting EUROCONTROL HQ, Brussels
AIXM 5.1 – Interoperability issues
FAA Federal NOTAM System (FNS)
AIXM 5 Overview xNOTAM Workshop #2 Brussels, November 2007
AIXM 5 Development Status
AIXM CCB meeting EUROCONTROL HQ, Brussels
AIXM 5.2 – WIP AIXM CCB – Webex 26 July 2018.
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
ETS WG meeting 6-7 September 2006
AIXM 5.2 – WIP AIXM CCB – Webex 26 June 2018.
Marine Strategy Framework Directive (MSFD)
P. Cruellas EUROCONTROL DSR SWIM/EA Unit
Reference Manual update Item 6.2 of the agenda
4/4/2019.
Task Force on Target Setting and Reporting TFTSR
AIXM 5.1 – Interoperability issues
Presented by Eduard Porosnicu, EUROCONTROL
Eddy Porosnicu EUROCONTROL
Welcome and Introductions
Conclusions of the meeting
30 NOV – 01 DEC 2017, Eurocontrol, Brussels
Digital AIM Training - AIXM
Meeting of the Working Group on Rail Transport Statistics
AIXM CCB – Webex 24 January 2017
AIXM 5.1 – Interoperability issues
Eddy Porosnicu EUROCONTROL
AIXM 5.2 – WIP AIXM CCB – Webex 26 APR 2018.
AIXM 5.2 – CP in Lot 2 AIXM CCB – Brussels, 06 MAR 2019.
ICAO AIRM briefing for the AIXM CCB Scott WILSON
AIXM scripts and plannning
AIXM 5.2 – WIP AIXM CCB – Webex 29 March 2017.
AIXM – Work in Progress AIXM CCB – Webex, 14 MAR 2014.
AIXM CCB – Webex 28 FEBRUARY 2017
Digital AIM Training - Introduction Introduction – day 2
AIXM 5.1 – Interoperability issues
Presentation transcript:

AIXM 5.2 – WIP AIXM CCB – Webex 10 OCT 2017

Proposed Agenda Report to the IMP Actions from Frankfurt meeting Routes-related issues including Military Training Routes (FAA analysis) Other new issues Issues that are ready for change proposal (Temporality document revision) No significant progress since last meeting

CCB Report to IMP Draft version Updated version presented today author - Razvan Guleac Sent to CCB members on 5 OCT Comments / suggestions received from FAA, Solitec Updated version presented today See clean version distributed after the Webex Final review before submission to IMP Comments to Razvan no later than 16th October Will be presented by Razvan Guleac and Deb Cowell

Actions from Frankfurt meeting

Temporality Definition of valid Timeslice clarified Use case for TimeSlice “snapshot for time period” (“version”) Initially introduced for performance reasons – to avoid calculating Snapshot “on the fly” Would be limited to time periods for which there is no change in Baseline or Tempdelta. Each time there is a change, a new such TimeSlice would have to be presented. Use case still not clear – any obvious business need for this apart fro technical convenience? To be discussed for AIXM 5.2

Temporality AIRM introduces the concept of “last revision (date/time)” Can this be an alternative mechanism instead of sequenceNumber/correctionNumber? Does it cover all AIS use cases (see chapter 5). To be discussed using JIRA for AIXM 5.2, if still considered as an option… To do add missing examples in chapter 4 and 5 See other open comments To be discussed for AIXM 5.2 As part of the AIXM 5.1.1 revision

Urgent things to be aligned with FIXM CCB (before AIXM 5.2) Version level naming (major/minor/patch) – discussed already in both AIXM and FIXM CCB See also semver.org : major/minor/patch with some rules of what kind of changes are foreseen for which level CCB Frankfurt – we see no drawback if the naming major/minor/patch is used Namespace policy for versions (proposed by AIXM) Check what was done for FIXM 3.0.1 Align also the XSD file location composition (ex: use 5.2.0, not 5.2 for first non-patch version)? Deprecation rules (proposed by FIXM) ToDo – agree with the FIXM CCB secretariat on a joint Webex or time for a discussion during the CCB Once AIXM/FIXM/iWXXM agreement is reached, inform IMP See: cross-XM coordination https://ext.eurocontrol.int/aixm_confluence/display/XMWIP/Overview ToDo : open issues in JIRA for each of the 3 aspects so that the implementation in AIXM can be detailed.

Conversion between versions Performance to be tested for scripts Provide streaming-capable XSLT Test conversion of AIP Data sets from 5.2 into 5.1.1 Acceptable conversion times for an AIP Data set is in the range of minutes (for a medium size country) Pay attention to how the script is provided from a certification / quality assurance point of view: Proof-of-concept (with disclaimer) Documented/tested in support of eventual certifications Side issue – size of AIXM files Metadata Non-optimised geometries (such as use of gml:pos instead of gml:posList Cm-level interpolation for arcs (in AMDB files) To be discussed for AIXM 5.2 Discussed already as interoperability issues…

Routes related issues MTR presentation by FAA Other JIRA issues related to Routes

AIXM 5.2 – issues ready for CP AIXM-221 (Airspace) point geometry AIXM-183 (Route) Airspace class associated directly with RouteSegment AIXM-159 (Procedures) Remove cat IIID from ILS precision approach guidance AIXM-135, AIXM-176, AIXM-208, AIXM-190 (Procedure, Route) PBN and RNP values AIXM-178 (Airport, Obstacle, Procedure) XSD bug – incorrect multiplicity for <<choice>>

Next Webex/Meeting AIXM CCB Meeting in Brussels Webex proposed for MON 20 NOV, 14:30-16:30 (CET) Agenda – Prepare meeting in Brussels Proposed agenda Summary of issues Progress on Change Proposals Temporality document AIXM CCB Meeting in Brussels 30 November – 01 December Please confirm your participation by 20 November Note: Eurocontrol AIXM Coding Guidelines FG Brussels, 28-29 November 2017 first Day - Digital NOTAM second Day - AIP data set and Obstacles coding guidelines