Learning Outcomes Students are able to:

Slides:



Advertisements
Similar presentations
ISO 9001:2000 Documentation Requirements
Advertisements

Understanding the Requirements Qimpro Standards Organization
ISO 9001 : 2000.
How to Document A Business Management System
Quality management Vincent A Ssembatya.
1 Quality Management Standards. 2 THE ISO 9000 FAMILY ISO 9000: 2005 Identifies the fundamentals and vocabulary for Quality Management Systems (QMS) ISO.
The ISO 9002 Quality Assurance Management System
Quality Management Systems Chapter 10. Introduction ISO- International Organization for Standardization Founded in 1946, in Geneva, Switzerland Main function.
TERMINOLOGY OF ISO 9001:2000 By KOESWIDIJONO. ISO ISO : THE INTERNATIONAL ORGANIZATION FOR STANDARDIZATION IS A WORLDWIDE FEDERATION OF NATIONAL STANDARDS.
Quality is the ability of a product or service to consistently meet or exceed customer expectations. Quality Management.
ISO 9000:2000 Quality system standards adopted in 1987 by International Organization for Standardization; revised in 1994 and 2000 Technical specifications.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
Implementing a Quality Management System
ISO 9001:2000 Intro Presented By: Brad D. Agenda Overview of QMS Fundamentals ISO 9001:2000 Overview & Requirements.
ISO 9000 Certification ISO 9001 and ISO
QMS ISO 9001:2008 Introduction to QMS 9001:2008 and system auditing.
4. Quality Management System (QMS)
Training.
4. Quality Management System (QMS)
Welcome ISO9001:2000 Foundation Workshop.
Fundamentals of ISO.
OAS REGIONAL PROJECT QUALITY MANAGEMENT. What percentage of time in the work day do you have to devote to solving PROBLEMS? - ours or someone else´s (suppliers,
Ships in Service Training Material A-M CHAUVEL QMS Terms & Definitions 2009.
Quality Management System
WHAT IS ISO 9000.
Quality Management Systems P.Suriya Prakash Final Mech Vcet
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Introduction to ISO 9001:2000.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
1/25 S tandardization & Quality Assurance Policy Management Cross- Functional Management Daily Management Suggestio n System Quality Control Circle 5S5S.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Project Management Chapter 9 Project Quality Management Dr. Jana Jagodick Polytechnic of Namibia, 2012.
Continuous Improvement in School Management. Quotable Quotes Solving problems is not the answer to causing quality. The solution is understanding and.
Continuous Improvement in School Management. Quotable Quotes Solving problems is not the answer to causing quality. The solution is understanding and.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
a guidance to conversion
Programme Objectives Analyze the main components of a competency-based qualification system (e.g., Singapore Workforce Skills) Analyze the process and.
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay The Deming Chain Reaction Improve quality Productivity improves Capture the market with better.
TOTAL QUALITY MANAGEMENT TEACHINGS OF QUALITY GURUS Dr. Mohamed Riyazh Khan- DoMS.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
The common structure and ISO 9001:2015 additions
Definition: Total Quality Management Total Quality Management is a management approach that originated in the 1950s and has steadily become more popular.
Management of Quality. Introduction to Quality Quality Gurus W. Edwards Deming W. Edwards Deming Joseph M. Juran Joseph M. Juran Philip B. Crosby Philip.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
1 Quality Management Z SUZSANNA E SZTER T ÓTH R ITA D ÉNES Department of Management and Corporate Economics 1 March 2016.
Submitted By: Tanveer Khan M.Tech(CSE) IVth sem.  The ISO 9000 standards are a collection of formal International Standards, Technical Specifications,
Certified Internal Auditor-NABH. Terms and definitions  Audit/ Assessment: Systematic, independent and documented process for obtaining evidence and.
1 CQA Training QUESTION BANK. 2 CQA Training QUESTION 1 THE TWO DEFINITIONS OF QUALITY ARE: QUALITY MEANS MEETING REQUIREMENTS QUALITY MEANS FIT FOR USE.
UNDERSTANDING ISO 9001:2008.
WRTVC INTERNATIONAL GUIDELINES Requirements for
Steve Barfoot, President Advantage International Registrar, Inc.
ECE362 Principles of Design
Quality Control and Quality Assurance
Quality Management Systems: Elements, implementation of documentation
External Validation of Quality Programs
Fundamentals of ISO.
UNIT V QUALITY SYSTEMS.
Quality Management Systems
Quality Management Systems – Requirements
Quality management standards
Transition ISO 9001:2008 to ISO 9001:2015
QUALITY MATTERS - OVERVIEW OF ISO QUALITY MANAGEMENT SYSTEM
UNDERSTANDING FOR STANDARD
ISO 9000 Dr. S. Thomas Foster, Jr..
ISO 9001:2008 Quality Management Systems
External Validation of Quality Programs
Presentation transcript:

Learning Outcomes Students are able to: Differentiate the difference between quality control and quality assurance Apply the concept of Total Quality Management in educational management Relate the basic concepts of ISO 9001 certification to educational management Realize the importance of PDCA

Continuous Improvement in School Management

Quotable Quotes Solving problems is not the answer to causing quality. The solution is understanding and continuously improving the processes that give rise to problems. And yet like mushrooms in a warm, dark, moist place, tomorrow brings a whole new crop of problems. (Seymour, D. T., 1983)

Words from W. Edwards Deming Demming stated that "... if you stress quality, profits will take care of themselves. But if you stress profits, quality will not take care of itself.“ Rework, scrap, and unnecessary complexity add costs to and lower the quality of a product or service.

Definitions  Quality Ability of a set of inherent characteristics of a product, process or system to fulfill requirements of customers and other interested parties  Quality control is a set of activities intended to ensure that quality requirements are actually being met. Quality control is one part of quality management.  Quality assurance Part of the quality management focused on providing confidence that requirements will be fulfilled

Corrective action (immediate and long term) Action taken to eliminate the cause of a detected nonconformity or other undesirable situations Preventive action Action taken to eliminate the cause of potential nonconformity or other potentially undesirable situations Audit Systematic, independent, and documented process for obtaining evidence and evaluating it objectively to determine to which criteria are fulfilled

Quality Management System (processes, people, and documentation) System to establish quality policy and quality objectives and to achieve these objectives

TQM Process Map  TQM requires a new process thinking mindset  Everything we do is part of the process  Our focus shifts: - from managing outcomes to managing and improving processes - from what to do to how to do the processes better

Quality performance expands to include how well Quality performance expands to include how well each part of the process works and the relationship of each part to the process Process improvement focuses on continuously achieving the greatest potential benefit for our customers

SEA Quality Management Map

David Butler TQM Process Key Principles of Quality  Principle 1: Quality is defined as any product or service that satisfies customer specifications.  Principle 2: The work standard is defect free This includes products or services provided to others (outputs to customers) or received from others (inputs from suppliers).

Principle 3: Quality is measured by the price of non quality (PONQ). PONQ is what it costs Your Company in time, money or opportunity when things are not being done the best way.

Deming’s 14 Points Create consistency of purpose toward improvement of the product and services so as to become competitive and stay in the business Adopt the new philosophy (Avoid delay, mistake, defective material, and defective workmanship) Cease dependence on mass inspection (Require statistical evidence that quality is built in) Improve the quality of incoming materials (Depend on meaningful measures of quality, along with price) Constantly improve the system of production and services Institute modern methods of training and education for all Institute modern methods of supervision

Drive out fear by encouraging effective two-way communication (to enable everybody to be part of the change) Break down barriers Eliminate the use of slogans (Eliminate work standards that prescribe numerical quotas for the workforce, demanding zero defects and new level of productivity without providing methods) Institute leadership Management by objectives Encourage self improvement for everyone Top management commitment

The Quality Process Framework There are five components forming the Quality Process framework. Quality Council: A group of senior managers appointed to plan, administer, facilitate and monitor the entire Quality Process. Awareness Function: A variety of ongoing communications, activities and events arranged by a Coordinator exposing all employees to the Quality Process.

Education Function: A series of Quality training programs directed by a Coordinator ensuring everyone understands the tools of problem elimination. Measurement Function: A set of standardized charts created by a Coordinator and utilized by Individuals or teams to objectively measure Quality Process progress. Problem Elimination Function: A formalized problem identification and resolution method developed by a Coordinator and used by all employees to permanently eradicate defects.

A systematic approach to the problem-solving process (Shewhart, W. A)  Plan       It could be a retention plan or a dormitory security plan       It is an area that needs improvement  Do It involves translating the plan into action  Check This is the data gathering step        It helps us to compare the ‘do’ against the ‘plan’

Act Begin formalizing those things that were successful and to make changes to the ‘plan’ (in those areas where our expectations were not met)

TQM Process Control Plan Process includes the tasks to develop and administer assessments to report technical proficiency and to award Certificates of Technical Achievement Process Control includes the steps to achieve the process. Benchmark Analysis are the observable evidence that was accepted as proof that the process has been followed.

Root-Cause Analysis After the process has been completed and evaluated, Root-Cause Analysis can be used to examine those elements that have not met the Benchmark Analysis. Corrective Action the plan to achieve the Benchmarks as required of the process based upon the results of Root-Cause Analysis. Continuous Improvement includes any changes to Process, Process Control, or the Key Characteristics determined necessary through Root-Cause Analysis.

The book ‘Kaizen’ by Masaaki Imai Kaizen is a Japanese work for continuous improvement According to Massaki Imai, kaizen strategy is the single most important concept in Japanese management – the key to Japanese competitive success Kaizen means ongoing improvement involving everyone – top management, managers, and workers Quality is not meeting standards or quotas; it is the natural outcome of process-oriented way of thinking that becomes deeply ingrained in the culture of the organization

Changes to ISO 9001:2000 (Version 1994 – 2000) The main reason for the revision according to ISO is to give users the opportunity to add value to their activities and to improve their performance continually by focusing on the major processes within the organization    The process based approach: Plan, Do, Check, Act structure of the standards  More clarity in areas such as facilities, work environment and improvement  Resources section, especially people  Greater emphasis and involvement of top management

Four Standards in the New Series ISO 9000: Fundamentals and vocabulary ISO 9001: Requirements ISO 9004: Guidelines for performance improvements ISO 19011: Management system auditing

Quality Management Systems: Requirements 1. Scope Boundary of the system Eg. In university setting: undergraduate/Graduate, teaching and learning, research or extension 2. Normative reference Refer to ISO 9000-2000, Quality Management System – Fundamental and vocabulary 3. Terms and definitions Supplier Organization Customer Customer Direct e.g. Students Indirect e.g. MOE, other agencies

4. Quality Management System The three main elements: Process: Core and secondary processes (how they are linked, how resources are provided) People Document Version 2000 process-based approach Version 1994 document based approach 4.1 Process-based approach (business mapping)

4.2 Document requirements 4.2.1 Quality objectives and policies Quality manual Documented procedures Documents needed for planning, operation and control of its processes Records

4.2.2 Quality manual 4.2.3 Control of documents 4.2.3 Control of records Difference of documents and records Documents records Quality policy Evidence to show that a procedure has been Procedures carried out e.g. check list Work instructions Lecture notes Guide books

5. Management responsibility 5.1 Management commitment 5.2 Customer focus Direct: students Indirect: MOE, industries, other agencies, professional bodies Ways of showing: dialogues, meetings, involvement as committee, attachment, tracer studies and etc 5.3 Quality policy

5.4 Planning ISO committee, quality objectives, customer charter 5.5 Responsibility, authority and communication 5.5.1 Responsibility and authority Organizational chart: Level of authority 5.5.2 Management representative 5.2.3 Internal communication

5.6 Management review 5.6.2 Review input (need to have before the auditing process, once a year) 5.6.3 Review output 6. Resource Management 6.1 Provision of resources: Money, human, material, machinery, and methodologies 6.2 Human resources 6.2.1 Recruitment 6.2.2 Training

Work safety and harmony 6.3 Infrastructure 6.4 Work environment Work safety and harmony 7. Product Realization (Realization of teaching and learning programs) 7.1 Planning of product realization (Head of Department and lecturers to give input) Quality framework: Activity Monitoring Approval Record Program

7.2 Customer-related processes 7.2.1 Determination of requirements related to the product) Customers’ requirements, student selection 7.2.2 Review of requirements related to the product Course registration 7.2.3 Customer communication Notice board, meetings, academic advisory system etc.

7.3 Design and Development Program development (Example) 7.3.1 Design and development planning (Need identification of the program) 7.3.2 Design and development input (Preparation of program framework) 7.3.3 Design and development output Draft of the program 7.3.4 and 7.3.5 Design and development review and Design and development verification (Review by Departmental level until the board of governors) 7.3.6 Design and development validation (by MOE) 7.3.7 Design and development changes

7.4 Purchasing 7.4.1 Purchasing process Requests for purchasing, assess and reassessment of suppliers 7.4.2 Purchasing information (Example local order, specification/proposal) 7.4.3 Verification of purchased product 7.5 Production and service provision 7.5.1 Control of production and service provision Availability of infor describing the product e.g. Academic guide book, work instructions, master list of equipments, monitoring and measurement (including lecturers performance), release, delivery and post-delivery activities (Administration of students grades)

7.5.2 Validation of processes for production and service provision 7.5.3 Identification and traceability E.g. program code, course code, CGPA, Schedule 7.5.4 Customer property Students assignments and thesis 7.5.5 Preservation of product Control of exam questions, how grades reach the students 7.5.6 Control of monitoring and measuring devices Calibrate of equipments used in teaching and learning

8. Measurement, analysis and improvement 8.1 Have improvements initiatives, use certain statistical tools 8.2 Monitoring and measurement 8.2.1 Customer satisfaction (teaching evaluation) 8.2.2 Internal audit 8.2.3 Monitoring and measurement of processes (use of customer charter) 8.2.4 Monitoring and measurement of product (Grades to students)

8.3 Control of nonconforming products Nonconforming services (NCR) can be traced from complaints by students, during the auditing process, daily execution of processes) 8.4 Analysis of data Four types of data: Customer feedback Conformance to product requirement (customer charter) Academic data e.g. passing/failure rate Performance of suppliers

8.5 Improvement 8.5.1 Continual improvement 8.5.2 Corrective actions Analyze the problems and take actions against them 8.5.3 Preventive actions