WIAP AG MEMV METAL STRESS RELIEF Company headquarters: Dulliken SO,Switzerland
About us WIAP AG consists of a team of experienced and talented machine tool builders which are a big part of the Widmers family All family members completed their training in their own company, so they know everything in every detail Since 2007/1981, we help our clients increase the growth of their business and their sales As a family led business in first and second generation we offer more than 30 years of experience in design, production and further treatment with MEMV Manufacturing of the complete MEMV system Machinetool engineering Automation Design, manufacture, installation electrics, PLC programming, commissioning, service CNC programming
Already since 1983 WIAP AG deals with vibration technology and its advantages. However, it is only now, for the first time in the company's history, using sophisticated measuring methods from 2014 to 2017, that it has been possible to clearly prove the concrete benefit. For example, not only in welded constructions, but also in heavy-duty rolling with the help of vibration technology, the same results are achieved with stress-relieving as with the advanced MEMV process. This results in decisive advantages for the customer. On the one hand, there is no scaling , On the other hand, enormous energy can be saved: only 2kW / h are necessary for an exemplary process. In contrast, in a comparable procedure with stress relief annealing, about 935kW / h of energy must be applied Average relaxation time with vibration is 35min
latest patents
applications
Impeller für Grossraumlüftunge applications Impeller für Grossraumlüftunge
applications Schwerwalzen
Current projects Fully automatic MEMV system Clamping tables for small parts Innosuisse project with the PSI and the FH Brugg regarding measurements of the workpiece Extend delivery program
MEMV-E-20-V20_Set
View MEMV Software
Protocols manual measurements
MEMV-S-20-500
MEMV-E-20
MEMV-S-30-400
MEMV-D-M 360° possibility
conclusion No expensive transport costs, the workpieces remain in your factory Easy to use Flexible dates Environmentally friendly Economical Simultaneous control of your workpieces. You notice, for example, a bad or too weak weld A successful relaxation process performed in just 30 minutes per workpiece