Project Grey Wolf Digital CMOS “Memory” Game

Slides:



Advertisements
Similar presentations
EE/CS 480 Fall October 2007 University of Portland School of Engineering Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano.
Advertisements

CS-EE 480 Fall November, 2005 University of Portland School of Engineering Project D River Robot Navigation Team John Fastabend Justin Meyer Kim.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Blue Heron Educational Ball and Beam Control System Team Bryan.
EE/CS 480 Fall February, 2008 University of Portland School of Engineering Project Blue Heron Educational Ball and Beam Feedback Control System Team.
EE/CS 480 Fall March, 2008 University of Portland School of Engineering Project Blue Heron Educational Ball and Beam Feedback Control System Team.
CS-EE 481 Spring University of Portland School of Engineering Project Golden Mantle CMOS 8-Bit Analog-to-Digital Converter Team T Travis Tompkins.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Puffins Synchronous Chorded Keypad Input Chip Team RuthAnn Gobble.
EE/CS 481 Spring Founder’s Day, 2008 University of Portland School of Engineering Project Golden Eagle CMOS Fast Fourier Transform Processor Team.
Senior Design 1 University of Portland School of Engineering Project LED Cube Team Stolen Pie –Patrick Bloem –Jess Tate –Devin Pentecost –Caleb Pentecost.
EE/CS 481 Spring February, 2007 University of Portland School of Engineering Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Surf Scoter Electronic Ballast for a Fluorescent Lamp Team McGuire,
Senior Design 1 University of Portland School of Engineering.
CS-EE 481 Spring January 2007 University of Portland School of Engineering Project Boring MMMM (Magnetic-field Monitoring MOSIS Machine) Team Mr.
CS-EE 481 Spring University of Portland School of Engineering Project Golden Mantle CMOS 8-Bit Analog-to-Digital Converter Team T Travis Tompkins.
Senior Design 1 University of Portland School of Engineering.
CS-EE 481 Spring February, 2006 University of Portland School of Engineering Project Molalla Microprocessor-based Charge Controller Team Andrew Melton.
CS-EE 481 Spring January, 2007 University of Portland School of Engineering Project Enterprise Biggerfoot Textbook Exchange Team Andrew Elliott Robert.
EE/CS 480 Fall /29/2015 6:24:03 AM University of Portland School of Engineering Project Burnside Programmable Logic Solar Radiant Heating System.
CS-EE 480 Fall November 2006 University of Portland School of Engineering Project Glide Garage Door Tele-Controller Team Graham Linn Srija Pidaparthy.
CS-EE 481 Spring Founder’s Day, 2004 University of Portland School of Engineering Project Steelhead A CMOS 4-Bit x 4-Bit Multiplier Authors Scott.
CS-EE 480 Fall November, 2005 University of Portland School of Engineering Project Long Tom OTTR Team Annette DeVille Tom Kinnear Jeff Scott Advisor.
CS-EE 480 Fall November, 2005 University of Portland School of Engineering Project Beaver Marsh: Digital Odometer Team Josh Eby Brandon Pearsol Kirk.
CS-EE 480 Fall September, 2003 University of Portland School of Engineering Project Brown Trout In-Line Headphone Amplifier Team Casey Hughes Jeff.
CS-EE 481 Spring February, 2005 University of Portland School of Engineering Project Swift Fox Automotive Accelerometer & RPM Monitor Team Andrew.
Fall CS-EE 480 University of Portland School of Engineering Project Meadowlark CMOS Programmable Digital Low-Pass Filter Jennifer Galaway Jennifer.
CS-EE 481 Spring 2007 March University of Portland School of Engineering Project Beaver Marsh: Digital Odometer Team Kirk Chen Josh Eby Brandon Pearsall.
EE/CS 480 Spring February 2008 University of Portland School of Engineering Project Puffins Synchronous Chorded Keypad Input Chip Team RuthAnn Gobble.
Fall CS-EE 480Team Pit Roach University of Portland School of Engineering November Program Review Team Pit Roach B 2 Logic to L-Edit Translator.
EE/CS 480 Spring February 2008 University of Portland School of Engineering Team Matthew Gridley Tim Morris Nathan Oliver Advisor Dr. Rylander Industry.
EE/CS 480 Fall November, 2007 University of Portland School of Engineering Project Blue Heron Educational Ball and Beam Feedback Control System Team.
CS-EE 480 Fall November 2004 Project Grey Wolf Digital CMOS “Memory” Game Team Lindsay Megyesi Taya Campagna Mason Tabata Weston Kurisu Advisor Dr.
EE/CS 481 Spring 2008 Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano James Kelly Kevin Young Advisor Dr. Joseph Hoffbeck Industry.
EE/CS 481 Spring February, 2008 University of Portland School of Engineering Project Surf Scoter Electronic Ballast for a Fluorescent Lamp Team McGuire,
CS-EE 481 Spring February, 2006 University of Portland School of Engineering Project Snake Automated Guitar String Tuner Team Kenneth Aramaki.
EE/CS 480/481 12/12/ :16:40 PM University of Portland School of Engineering Project Yew Inline Power Monitor with Cost Analysis Team Zubin Bagai.
Project Long Tom OTTR Team Annette Collins Tom Kinnear Jeff Scott Advisor Dr. Aziz Inan Dr. Peter Osterberg Industry Representative Mr. Mike Desmith Intel.
CS-EE 480 Fall September, 2004 University of Portland School of Engineering Project Grey Wolf Digital CMOS “Memory” Game Team Lindsay Megyesi Taya.
EE/CS 481 Spring University of Portland School of Engineering Project BoG Wireless Breath-Analyzer with Key- Lock Team Jessica Herman Patrick Hunt.
CS-EE 481 Spring University of Portland School of Engineering Project Golden Mantle CMOS 8-Bit Analog-to-Digital Converter Team T Travis Tompkins.
CS-EE 481 Spring January, 2005 University of Portland School of Engineering Project Swift Fox Automotive Accelerometer & RPM Monitor Team Andrew.
EE/CS 480 Spring February 2008 University of Portland School of Engineering Team Matthew Gridley Tim Morris Nathan Oliver Advisor Dr. Rylander Industry.
CS-EE 480 Fall September, 2006 University of Portland School of Engineering Project Holonomic Control System Team Grant Hay Jeff Hayes Dan Hoffman.
CS-EE 480 Spring January 2005 Project Grey Wolf Digital CMOS “Memory” Game Team Lindsay Megyesi Taya Campagna Mason Tabata Weston Kurisu Advisor.
EE/CS 481 Spring 1 EE/CS January, 2008 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy.
CS-EE 480 Fall October, 2003 University of Portland School of Engineering Project Lamprey A CMOS Traffic Light and Intersection Control circuit Team.
EE/CS 480 Spring February, 2008 University of Portland School of Engineering Project Golden Eagle Fast Fourier Transform Processor Team Sandra Pellecer.
CS-EE 481 Spring January, 2004 University of Portland School of Engineering Project Lamprey A CMOS Traffic Light and Intersection Control circuit.
CS-EE 481 Spring February, 2004 University of Portland School of Engineering Project Lamprey A CMOS Traffic Light and Intersection Control circuit.
CS-EE 481 Spring March, 2005 University of Portland School of Engineering Project Bighorn CMOS Low Pass Switched Capacitor Filter Team Brien Bliatout.
CS-EE 481 Spring Founder’s Day, 2003 University of Portland School of Engineering CMOS Authorized Entry System Authors Christina Schulz Krissy Smith.
Project Glide Garage Door Tele-Controller
Project Glide Garage Door Tele-Controller
Project Owyhee MOSIS Digital Lock
Project Owyhee Digital Lock
Project Snake Automated Guitar String Tuner
Project Snake Automated Guitar String Tuner
Project Sublimity Audio Stereo Class-D Audio Amplifier
Project Snake Automated Guitar String Tuner
Industry Representative
Project Meadowlark CMOS Programmable Digital Low-Pass Filter
Project Molalla Microprocessor-based Charge Controller
Project Deadwood A Digital Enigma Machine
Project BoG Wireless Breath-Analyzer to Key-Lock
Authors Mason Tabata Weston Kurisu Taya Campagna Lindsay Megyesi
Project BoG Wireless Breath-Analyzer with Key-Lock
Project Owyhee MOSIS Digital Lock
Project BoG Wireless Breath-Analyzer with Key-Lock
Presentation transcript:

Project Grey Wolf Digital CMOS “Memory” Game Team Lindsay Megyesi Taya Campagna Mason Tabata Weston Kurisu Advisor Dr. Lu, Dr. Osterberg Industry Representative Mr. Dave Dunning of Intel February 2005

Overview Introduction Accomplishments Block Diagram Pictures of Project Plans Schedule and Milestone Table Issues/Concerns Conclusions February 2005

Introduction Creation of digital “Memory” game using MOSIS technology and a PIC18F452 microcontroller. February 2005

Accomplishments Theory of Operations 0.9,1.0, and approval. Received supplies from Sandy. Started wire-wrapping macro model. Completed Verilog programming for the random number generator. Established physical connection between microcontroller and LCD Screen. February 2005

Accomplishments…cont Figured out how to interface the turn knobs with the seven-segment decoders. Updated Website. Microcontroller handles push button inputs. Circuit Schematic. February 2005

Block Diagram February 2005

Pictures of Project February 2005

Pictures of Project…cont February 2005

Pictures of Project…cont February 2005

Plans for March Continue wire-wrapping and testing macro model components. Finish Programming microcontroller. Have entire system ready for MOSIS chip. Update website when possible. February 2005

Schedule February 2005

Milestones Number Description Original Previous Present (9/28/04) (1/25/04) (2/22/05) 1 September Program Review 9/28/2004 2 Product Approval 10/8/2004 10/14/2004 3 October Program Review 10/26/2004 4 B2 Logic Simulation 11/5/2004 5 Project Plan 0.9 6 Project Plan Approval 11/12/2004 7 .tpr File Completion 11/19/2004 11/23/2004 8 Submit MOSIS design 11/24/2004 9 November Program Review 11/30/2004 10 Design Release and Approval Meeting 12/10/2004 11 January Program Review 1/25/2005 12 Theory of Operations Approval 2/11/2005 2/15/2005 February 2005

Milestones Cont. Number Description Original Previous Present (9/28/04) (1/25/05) (2/22/05) 13 Macro Model of Chip 2/14/2005 2/06/2005 14 February Program Review 2/22/2005 15 Microcontroller Programmed 2/28/2005 16 System Integration 3/28/2005 17 March Program Review 3/29/2005 18 Prototype Release and Approval Meeting 4/8/2005 19 Founder’s Day Celebration 4/12/2005 20 Final Report 4/22/2005 February 2005

Concerns/Issues Staying on schedule. Deciding how to layout our board with push buttons, turn knobs, etc. Getting reimbursed for parts. February 2005

Conclusions We made lots of progress on our macro model. We figured how to use the wire-wrapping tool. The bulk of this month and next month’s work includes assembling and testing the circuit. Any questions? February 2005