Commission Agenda Item #8

Slides:



Advertisements
Similar presentations
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guide for Electrochemical Techniques.
Advertisements

VORTEX FINDERS (DIP TUBES, IMMERSION TUBES)
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Part – 1 Introduction Corrosion in concrete for wastewater facilities and conveyance systems is generally caused by chemical and microbiological attack.
Wastewater Infrastructure
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Omak Sewer Replacement Project 95% of the piping is concrete pipe (CP) CP installation varies from 1933 to 1946 Pipe is past its intended useful lifecycle.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
City of Los Angeles Venice Dual Force Main Project
P Noise Reduction for Internal Combustion Engines
“Liquid Incineration” for a Cleaner Environment The VTX Process Innovative Remediation Technologies, Inc.
ENVIRONMENTAL MANAGEMENT PLAN
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Coatings & Lining for Underground Infrastructure.
OPTIMUM COATING SOLUTIONS OPTEK PRODUCTS CEMETITIOUS COATINGS AND ADDITIVES Brief overveiw.
Designing an Internal Corrosion Program NACE Eastern Area Conference Roy D. Fultineer Jr.
Corrosion and Condition Assessment of Galvanized Steel Reinforcement in Concrete Structures Dr. Jane Jieying Zhang Critical Concrete Infrastructure October.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee March 22, 2011 Info Item: East Bethel Update Bryce.
Management & Development of Complex Projects Course Code - 706
Risk Management in the Built Environment Qualitative and Quantitative Risk Management By Professor Simon Burtonshaw-Gunn – licensed under the Creative.
Distribution Integrity Management – What To Expect John Erickson, PE American Public Gas Association Western Regional Gas Conference.
5-1 Lesson 5 | Common Issues & Challenges. Describe how RSAs address project schedule (time), project cost, and agency liability concerns. Explain the.
CO# OS POSITIVE TRAIN CONTROL PROJECT Change Order #4 October 17, 2013 Related to Agenda Item 11.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
I N D U S T R I A L P R O D U C T S A N D S E R V I C E S ARC Commercial Water The Need for Coatings in Commercial Water.
Seminar on Concrete Damage Assessments, Concrete Repair and Concrete Mix Technology Organiser: Hong Kong Concrete Institute Co-organisers: The Hong Kong.
Infrastructure Vulnerability Profile. Objectives: To identify key infrastructure concerns related to the pre-defined hazards and issues Identify needed.
Immediate Threat and Danger Program Pam Truitt  September 10, 2015.
Conducting Water Quality Tests. Next Generation Science / Common Core Standards Addressed! HS ‐ ESS2 ‐ 5. Plan and conduct an investigation of the properties.
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
1% Sales Tax Commission Board Meeting June 3, 2015.
Spring 2009 Town Meeting Article 41 East Framingham Sewer Improvement Project (EFSIP) May 2009 Town of Framingham Department of Public Works "Preserving.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
Camera PDR/CD1 Planning 19 September 2008
Runway Rehabilitation: Award of construction contract and acceptance of 3 grants Resolution June 22, 2009.
Sun City Lift Station Odor Control Improvements
BAD VIBRATIONS.
UMCP Learning Objectives
District-Wide Well Maintenance, Rehabilitation, and Repair
Designing Resilient Bridges:
Ontario Universities’ Application Centre
Failure of Auxiliary valve
Rehabilitation Program impact on Sewer Management
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Water Department has Six Divisions
Key Issues CPOC Update February 2011 Second Avenue Subway TBM Drive #1
Definition of Corrosion
Parkland/Brookdale Interceptor Replacement
Capital Improvements Planning
Chapter 8 Software Evolution.
M E A S U R E ‘G’ P R O G R A M U P D A T E
Sheryl Stephens Victor Valenzuela
Statewide Public Communications Services RFP#
Fundamentals Course Basic Corrosion
Execute Purchase Order South Shore Water Reclamation Facility Building 359 Odor Control System Repairs Commission Agenda Item #8.
Award of Contract M06013C04 Project Management Information System (PMIS) Licensing, Maintenance and Service Agreement Commission Agenda Item #13.
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
Change Order Number Five, Contract M03037P01, Professional Services, 2050 Facilities Plan – Ultimate Build Out, and Approve Changes in Total Project Cost.
Change Order Request Contract S02013C01 SSWRF RAS System Improvements Restore ED’s Original Delegated Authority Approve Changes in TPC Commission.
Asset Management Plan Development and Implementation Support
Access Hatch Replacement Phase 4
Access Hatch Replacement Phase III
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Commission Agenda Item # 17
Building 360 Freight Elevator Rehabilitation at SSWRF
HRA: Aerospace Challenges
Larimer County: engineering
Commission Agenda Item #2
Presentation transcript:

Commission Agenda Item #8 Award Contract C02009P01 Engineering Services for H2S and Odor Mitigation Planning Study Project Commission Agenda Item #8

Background Odors are present in wastewater Sulfides can cause odors & corrosion in sewers Sulfides can be converted to H2S & sulfuric acid H2S is dangerous and can cause death in high concentrations

Background (continued) Dozens of locations in conveyance system: Odor complaints Corrosion issues Current response is to rehabilitate known corroded structures, sewers, gates Need an overall plan for mitigating odors and corrosion in MMSD system Sustainability consideration in odor and H2S treatment system

So this is a picture from the Southwest interceptor pipe taken in 2015 So this is a picture from the Southwest interceptor pipe taken in 2015. The pipe is 16” thick monolithic concrete, meaning no reinforcing steel. During construction of the monolithic concrete pipe they install a water stop at about 8” of pipe thickness. That waterstop is what is hanging down in this picture. If that waterstop was installed in the correct location, we have lost well over half the pipe thickness in this segment of the pipe. This picture is taken about 27’ from MH 41703 which is located in STH 100 and College Avenue in Hales Corners. This is showing the damage that can happen to pipes from H2S, but we need to make sure the damage is critical and what types of repairs are best to make responsible financial decisions on project. Asset management and planning can determine the risks associated with these types of damage to give Budget the tools they need to financially assess projects.

This is a close up of the water stop, but you can see the concrete pipe deterioration that is occurring. The H2S is converted to sulfuric acid which eats away at the cementitious portions of the concrete, leaving the exposed rock, which will eventually fall into the sewer stream.

Project Scope Address known areas of concern Determine where additional areas may develop Develop lifecycle costs for odor and H2S treatment systems Undertake Envision sustainability review of treatment options Conduct vapor and liquid phase testing Write planning study

Project Cost/Schedule Request for $337,998 Project complete in 13 months Project within budget Project negotiations added additional scope due to the requests by VWM due to the foaming issue, we added these to our scope instead of VWM doing the work.