Estimating Volatility : Consolidated Approach

Slides:



Advertisements
Similar presentations
Chap 3 Net Present Value.  Net present value is the single most widely used tool for large investments made by corporations.  Klammer reported a survey.
Advertisements

Irwin/McGraw-Hill © Andrew F. Siegel, 1997 and l Chapter 12 l Multiple Regression: Predicting One Factor from Several Others.
CHAPTER 13 PROBABILISTIC RISK ANALYSIS RANDOM VARIABLES Factors having probabilistic outcomesFactors having probabilistic outcomes The probability that.
11 CHAPTER FIFTEEN DIVIDEND DISCOUNT MODELS. 22 CAPITALIZATION OF INCOME METHOD THE INTRINSIC VALUE OF A STOCK –represented by present value of the income.
Chap 10 Keeping uncertainties separate.  The way to do this is to keep the major uncertainties separate and to model their interaction and effect on.
Chap 8 A Four-Step Process for Valuing Real Options.
Valuation and Rates of Return
 Known dividend to be paid before option expiration ◦ Dividend has already been announced or stock pays regular dividends ◦ Option should be priced on.
Objectives (BPS chapter 24)
Sensitivity and Scenario Analysis
Spreadsheet Demonstration New Car Simulation. 2 New car simulation Basic problem  To simulate the profitability of a new model car over a several-year.
Engineering Economic Analysis Canadian Edition
Session 9b. Decision Models -- Prof. Juran2 Overview Finance Simulation Models Securities Pricing –Black-Scholes –Electricity Option Miscellaneous –Monte.
Chapter 9 An Introduction to Security Valuation. 2 The Investment Decision Process Determine the required rate of return Evaluate the investment to determine.
Simple Linear Regression
CHAPTER 9 The Cost of Capital
Valuation of Income Properties: Appraisal and the Market for Capital
Inference for regression - Simple linear regression
Lecture 7: Simulations.
Chapter 13 Equity Valuation
Chapter McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved. A Brief History of Risk and Return 1.
Advanced Risk Management I Lecture 6 Non-linear portfolios.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Valuation and Rates of Return 10.
Chap 9 Estimating Volatility : Consolidated Approach.
CH7 Testing For Tradability 1. Agenda 1.Introduction 2.The linear relationship 3.Estimating the linear relationship: The multifactor approach 4.Estimating.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Valuation and Rates of Return 10.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 10 The Cost of Capital.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Engineering Economic Analysis Canadian Edition
Chapter 5: Regression Analysis Part 1: Simple Linear Regression.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Risk and Capital Budgeting 13.
Real Options Chapter 8 A 4-Step Process for Valuing Real Options.
Chap 4 Comparing Net Present Value, Decision Trees, and Real Options.
Prospective Analysis 9 CHAPTER.
Chapter 8 Stock Valuation (Homework: 4, 13, 21 & 23)
The Investment Decision Process Determine the required rate of return Evaluate the investment to determine if its market price is consistent with your.
Real Options Estimating Volatility Prof. Luiz Brandão
Chapter 13 Equity Valuation Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Chapter 13 Risk and Capital Budgeting. McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. PPT 13-1 FIGURE 13-1 Variability.
Valuation: Market-Based Approach
Equity Valuation Models
Stocks and Their Valuation
Portfolio Performance Evaluation
CHAPTER 21 Option Valuation Investments Cover image Slides by
Lecture 24 Multiple Regression Model And Residual Analysis
Risk and Return in Capital Markets
Portfolio Performance Evaluation
Cost of Capital Chapter 15 Reem Alnuaim.
Measuring Exposure To Exchange Rate Fluctuations
Portfolio Risk Management : A Primer
Risk and Return Fundamentals
Portfolio Performance Evaluation
Essentials of Modern Business Statistics (7e)
Cost of capital (Chapter 9)
Finance Review Byers.
Financial Statement Analysis K.R. Subramanyam
Measurement Uncertainty Analysis
Financial Statement Analysis
CHAPTER 12 Cash Flow Estimation and Risk Analysis
Chapter 3 Statistical Concepts.
Financial Risk Management of Insurance Enterprises
CHAPTER 14 MULTIPLE REGRESSION
Figure 7.1 Efficient Frontier and Capital Market Line
Risk and Capital Budgeting
1.
CAN US MUTUAL FUNDS BEAT THE MARKET Brooks Chpt:2
Extensions This chapter describes extensions to:
Valuing Stocks -- Summary of Formula
Measuring Exposure to Exchange Rate Fluctuations
Presentation transcript:

Estimating Volatility : Consolidated Approach Chap 9 Estimating Volatility : Consolidated Approach

Estimating Volatility : Consolidated Approach Volatility of a project is not the same as the volatility of any of the input variables, nor is it equal to the volatility of the company’s equity. How to use a Monte Carlo approach to value a project. Monte Carlo tools are fairly simple to use and can model the cross correlations among various inputs such as price and quantity, as well as time series properties such as mean reversion.

Two approaches for estimating a consolidated measure of the volatility of a value-based event tree are discussed later in this chapter. We call them the historical and the subjective approaches. We use the term “consolidated” because the output is a single estimate of volatility, built up from the many uncertainties that contribute to it . Estimates of these separate uncertainties are taken either from historical data, or from the subjective estimates of management.

Monte Carlo analysis for combining uncertainties Each sampling of a set of parameters generates an estimate of the present value of a project ( or a company), PVt

We start with a present value spreadsheet, model the variable uncertainties, use the Monte Carlo simulation to estimate the standard deviation of rates of return, and then construct the event tree binomial lattice. 1. Price per unit 2. Quantity of output 3. Variable cost per unit

If the weighted average cost of capital is 12 percent, the present value is $1,507.63; and if the investment outlay is $1,600, the net present value is -$92.37. The expected price per unit starts out at $10,but declines over time due to anticipated competitive pressure. The expected quantity sold grows at 20 percent in the year after the product is released, but despite price cuts, growth shows to 5.8 percent in the last year of the forecast.

The variable cost per unit is expected to decline from $6 The variable cost per unit is expected to decline from $6.00 in the first year of operation to $3.56 per unit in the last year. They believe that their errors of estimation will be highly positively correlated through time (autocorrelation of 90%), implying that if they underestimate the price that is achievable in one year, they are highly likely to have underestimated it the next year as well.

This time dependence is called autocorrelation, and if it is negative, implying that a high value is more likely to be followed by a low value (and vice versa), then it is called mean reversion. 1. Define Assumption. 2. Set Autocorrelations. “correlate icon” Crystal Ball to “select an assumption” 3. Define Forecast Variable.

4. Run the Simulation. “run” icon “reset” “run preferences”

The mean return was 13 percent, and the annual standard deviation was 21 percent. The standard deviation of prices was equal to 10 percent, but the standard deviation of the rate of return on the project is 21 percent. The input variables that drive uncertainty is not the same as the volatility of the project.

Building the event tree T = 1; therefore, and d = 1/u = 0.8106. The present value of the project, after the free cash flows have been paid out at the end of the first time period, is $1,569.12. By the end of the second time period, we can see from Exhibit9.7 that the value can be either $1,935.79 or $1,271.90.

The present value of the expected free cash flow that period is $262 and the expected present value at that point in time is

Multiplying this ratio times the up state value, $1,935 Multiplying this ratio times the up state value, $1,935.79 yields the up state dividend, namely $360.66. The down state dividend is the same ratio multiplied by the down state value, namely $236.95.

More on auto-correlation

And therefore Consequently This implies that the r-squared and beta coefficient are identical, that is, . Note also that beta is equal to one minus the speed of adjustment, 1-b,

Positive autocorrelation will result in greater volatility than assuming independence across time. Negative autocorrelation, with the simple mean reversion that we have been describing, assumes that positive error terms are followed by negative errors. Note that positive autocorrelation increase the standard deviation of project returns and negative autocorrelation decreases it.

Using historical data Use the r-squared of the time serious regression to capture the autocorrelation effect. Cross-correlation between variables is captured by the r-squared between them. The standard deviation for each of the variables is the standard deviation of the residuals that results from the time serious regression.

Therefore, the confidence interval, out-of-sample, increase approximately as

Subjective estimates provided by management Geometric Brownian motion

A more complicated case : mean-reverting procedures The general model for mean reversion may be written as :