John Hegarty ERESS Forum, 13. June 2019

Slides:



Advertisements
Similar presentations
Natural Gas Measurement, Meters and Pipelines
Advertisements

Congestion is what Quiet Cities solve presented by Robin Haycock 26 th November 2014.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Prepared By: Kopila Sharma  Enables communication between two or more system.  Uses standard network protocols for communication.  Do.
Oil & Gas. Built Environment External Aerodynamics.
GSC16-OBS-03 ITU-T GSC – 16 Observer Presentation Karen Higginbottom, JTC 1 Chair.
California Public Utilities Commission Sub Meter Protocol Workshop George Bellino Project Engineer Infrastructure Commercialization 27 Oct 2011.
Introductions GeoNav Group Providing Geospatial/Map Technology to Utilities Garmin OEM Super Dealer/Developer ESRI ArcGIS Business Partner.
Business Area Analysis Focus: Domain View (selected business area) Goals: –Isolate functions and procedures that allow the area to meet its goals –Define.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
Using GIS for Emergency Response City of Grand Forks implements Autodesk Crisis Command Adam Jonasson GIS / CAD Coordinator City of Grand Forks Bob Lenz.
Project field communication services llc Remote Site Industrial Communications Systems - Delivered. Capabilities Overview Project.
AMA FiT4HANA Designed for Big Data
Label Gallery Developer Series Overview. Label Gallery Developer Series Label Gallery Developer Series is a line of Label Gallery products designed for.
European Railway Energy Settlement System (ERESS) - ”Building common European solutions” UIC Energy Efficiency Conference 2009.
Defense & Homeland Security Cluster Initiative Project Update Presented by Wayne Freeman, TDA 10/1/09.
Design Development Image credit:
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
An automated diagnostic system to streamline DSM project maintenance Johan du Plessis 15 August 2012.
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
Open House June 3, 2003
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
TBWG Meeting Burlington, Vermont National ITS Architecture June 10, 2003.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
Human-computer interfaces. Operating systems are software (i.e. programs) used to control the hardware directly used to run the applications software.
Dry Storage & Battery Charging Monitoring & Control System.
Threat and OE Scalable FSO Dynamic Integrated Training Environment Spans all domains Includes Common Training Database and scenarios Future Training Concept:
Hard Drive Replacement Installing and removing hard disk drives in desktop computers.
SMART GRIDS & SMART CITY ENERGY EFFICIENCY BIG DATA INTERNET OF
Communications & Computer Networks Resource Notes - Network Hardware
Optimised & Safe Braking Systems Commercial operations Private use Fleet considerations.
Texas Technology Forum The Future of Mobile Technology Trends and Issues July 16, 2009.
ebee company presentation
Software Integrity and Cyber Security NAMEPA: Managing Change in a Changing World Jim Watson Division President & COO, Americas Division Management New.
Smart Home Technologies
Case study municipality. 2 Contents Introduction The way Results Conclusion.
Vehicle Data Entry. Scroll to Scan Diagnostics To perform Scan Tool functions scroll to Scan Diagnostics and press Enter Enter.
Veterans Integrated Service Network GEMS Coordinator Roles and Responsibilities.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Don’t need a line of sight If a device couldn’t sent the data it would record data in your memory and it’s seeking new path for send data.; More 1000.
PGE Strategy for Oregon’s Energy Future Empowering customers Energy efficiency Smart meters Distributed generation Diverse power supply Maintain and make.
«My future profession»
Chapter 1 Computer Technology: Your Need to Know
Components of software quality assurance system overview
Document No: GSC-21_034 Source: ISO/TC 184/SC 4 Industrial data
Tweet or short statement
ESB Networks IT Market Retail Systems.
    PRODUCT PRESENTATION ON :   INCREASING REVENUE BY USING GLO 3G NETWORK TO SUPPORT REMOTE AUTO DIAGNOSIS AND MANAGEMENT (GLO VEHICLE DIAGNOSIS AND MANAGEMENT)
Adam Jonasson GIS / CAD Coordinator City of Grand Forks
Smart Meter Technology European Style!?
Smart Car through IoT 라이 아샤리 리날디
What can be procured through SEWP V?
Top 10 Considerations for Implementing a Parking Guidance System
Challenges for the European Automotive Software Industry
CORPORATE PROFILE JUNE 2016
. - t !!l t. - 1f1f J - /\/\ - ' I __.
Component Based Software Engineering
Water & Irrigation Control systems
.. '.. ' 'i.., \. J'.....,....., ,., ,,.. '"'". ' · · f.. -··-·· '.,.. \...,., '.··.. ! f.f.
Communications & Computer Networks Resource Notes - Network Hardware
e-Navigation The Benefits to Ship Operators John Vonli General Manager
The business view Operations Business processes Productivity
Document No: GSC-21_034 Source: ISO/TC 184/SC 4 Industrial data
Components of software quality assurance system overview
HUMAN AND SYSTEMS ENGINEERING:
Biology Standards.
MODELLING OF AN OPTIMIZED, AUTOMATED WATER SUPPLY SYSTEM FOR OLKARIA
RSSB Board SLT/RSSB Director RSSB Technical Director
Complete Vehicle Systems.
Presentation transcript:

John Hegarty ERESS Forum, 13. June 2019 Energy Metering @ SBB John Hegarty ERESS Forum, 13. June 2019 Unternehmenspräsentation SBB CFF FFS

SBB Project - Meter Installations 2016-2019 SBB • Infrastructure • Energie • 06-2019 2

Energy Measurement System for railway vehicles SBB • Infrastructure • Energie • 06-2019 3

Energy Measurement System for railway vehicles Optimised EMS for each vehicle type (engine power <> sensor <> meter) => Fleet engineers need to undertand EMS design Integration of EMS in the vehicle – it’s not just a meter-box => but also sensors, antennas, mobile routers, cabling, supports … Hightech systems with complex software and sensitive electronics => plan specific training for installation and maintenance personal Conformity Assessment is a good quality control for all EMS => needs to be done at vehicle level, not just component Managing the data flow from DHS to billing system can involve several parties => role, responibilites and interfaces need to be clear SBB • Infrastructure • Energie • 06-2019 4