OIL# 52: End of PEV range criteria

Slides:



Advertisements
Similar presentations
WLTP Elaborated by the WLTP downscaling issues task force OIL #5 Proposal for modifications of the calculation parameter/coefficients.
Advertisements

WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-094 Leader: Per Ohlund / Kazuki Kobayashi.
DATE CONFIDENTIEL PROPRIÉTÉ RENAULT Nicolas HAREL Sam TRIPATHY Shorten range Test Procedure: Impact of constant speed on Range determination.
REPORT TO GRPE 71 ST SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE st GRPE, 8-12 June 2015, agenda.
Progress report of e-Lab sub-group (WLTP rev1e)
Progress report of e-Lab sub-group (WLTP-10-12e) 1. Proposals for Adoption 2. Proposals for Discussions 3. Next Actions.
Status report of WLTP Sub Group EV EVE 14. At WLTP IWG 10 Adopted open issues.
WLTP-E-Lab Sub Group Test procedure
Progress report of Sub Group EV (WLTP-11-19e) 1. Discussion points 2. Next Actions.
Progress report of Sub Group EV (WLTP-12-19e) draft 1. Proposals for adoption 2. Discussion points.
WLTP-12-17e Status report about the work of the gearshift issues task force.
WLTP-DHC Current status of WLTP-DHC & Mode Construction Prepared by DHC Secretary the 18 th DHC meeting under GRPE/WLTP informal group 5 th Jun.
Renault statements and questions: Page Autor/Abt.: ACEA WLTP EV Group /Samarendra Tripathy 1] Phase specific calculation (appendix YYY of attached.
WLTP, result calculation, v6
National Traffic Safety and Environment Laboratory JAPAN NTSEL OIL#58: Shorten test procedure (validation test in phase 1a)
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-034 Leader: Per Ohlund / Kazuki Kobayashi.
State of play WLTP Sub Group EV. Sub Group EV meeting 28 of September Last meeting of WLTP IWG 29 of September to 1 of October Final meeting for phase.
WLTP Vehicle range and energy consumption EVE October 2014.
Status report and Discussion paper for Number of tests at WLTP Tokyo IWG in 2015 JAPAN WLTP-12-15e.
Nicolas HAREL Sam TRIPATHY 23/10/2014 CONFIDENTIEL PROPRIÉTÉ RENAULT WLTP PEV Range test procedure : End of test criteria.
WLTP-12-17e Status report about the work of the gearshift issues task force.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-081 Leader: Per Ohlund / Kazuki Kobayashi.
WLTP-DHC Development of World-wide Light- duty Test Cycle -- Proposal for the threshold vehicle speed of Low/Middle/High(/extra-High) phase --
2013 年 6 月 12 日 所内フォーラム nd half1 st half2 nd half1 st half2 nd half1 st half2 nd half1 st half2 nd half WLTP-gtr.
WLTP-11-5e Status report about the work of the gearshift issues task force.
Progress Report of World-wide Light-duty Test Cycle
WLTP Informal Working Group
Study on Drive Trace Index of Electrified Vehicles
Electric Vehicles and the Environment (EVE IWG)
Electric Vehicles and the Environment (EVE IWG)
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-043
WLTP Informal Working Group
Electric Vehicles and the Environment (EVE IWG)
WLTP-14-15e Progress report of Sub Group EV (WLTP-14-15e) 14th WLTP IWG 26 April 2016.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-043
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-012
Drive Trace Indices in WLTP
Drafting Subgroup Meeting Part of IWG #16, The Hague, October 2016
Confirmation on application to EVs unique cycle
Electric Vehicles and the Environment (EVE IWG)
Status report on the DTI TF Takahiro HANIU (JASIC/JARI)
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-077
Current status of WLTP-DHC
OIL# 53: FCV test procedure e-Lab sub-group (WLTP-10-10e)
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 1/2/2019.
WLTP Informal Working Group
OIL#58: Shorten test procedure (validation test in phase 1a)
WLTP Informal Working Group
Electric Vehicles and the Environment (EVE IWG)
J. Pavlovic, A. Marotta, B. Ciuffo WLTP 2nd Act May 18th, 2017
1. Summary # items RESULTS status remarks EV_1 HEV system power
WLTP Phase 2 Presentation and discussion of the Term of Reference for the Durability Task Force Paris, April th WLTP IWG meeting DG GROW.C4.
Working Paper No. WLTP-05-12
1. Summary # items RESULTS status remarks EV_1 HEV system power
ACEA Comments from ACEA welcomes the idea to develop a shortened range test procedure based on MCT However, ACEA does not support JP proposal.
GRPE/WLTP-IG/ DHC subgroup
Proposed actions for gtr development
WLTP Informal Working Group
Request to GRPE for Approval of Prolongation of Mandate and
Status Report Cop Taskforce
Discussion paper on Applicable Test Cycle and Mode Construction
Discussion paper on Applicable Test Cycle and Mode Construction
Progress report of Sub Group EV (WLTP-12-19e) 1
WLTP-14-16e Report from EVE 18 – Shanghai, April 11th/12th Subgroup EV meeting – Paris
Electrified Vehicle Durability
Report from EVE 18 – Shanghai, April 11th/12th Subgroup EV meeting – Paris
Palais des Nations, Geneva
Additional discussion points from the gearshift issues task force
1. Summary # items RESULTS status remarks EV_1 HEV system power
Proposal for optional procedure of All Electric Range test (BEV)
Presentation transcript:

Progress report of e-Lab sub-group 1. Discussion points 2. Next Actions

OIL# 52: End of PEV range criteria Overview: This issue is to consider special treatments for PEVs which are not able to follow the prescribed cycle due to their limited speed or power. Current status: Possible solutions are in the following table. The SG requested Europe to have one position for the case of “cap speed”. *) downscale ratio is determined by motor peak power defined in R85, instead of ICE peak power solutions features concerns Downscale (defined in Annex2 in line with ICE* NA ✔ SG agreed Capped speed Reflect the vehicle performance Provide inappropriate information to customer Unfair competition Under discussion power determination: The influence of absence of power determination on test results was minimized during phase 1b. Completed power determination could contribute to expand vehicles to which WLTC can apply. At the same time, we need to mind that we need other technical investigations which had been done for ICE vehicles. It should take time. Special treatments for electrified vehicles, for example downscaling, in cooperation with power determination should be discussed in later phases of WLTP.

OIL# 58: PEV shorten test procedure Overview: This procedure is based on range calculation. This enables to reduce the test burden keeping good accuracy. Current status: WLTP-SG-EV-07-11 WLTP-SG-EV-08-03 The SG has been validating the method. The SG confirmed the deviation of results of shorten test from that of the conventional test is small. Also, the SG confirmed the influence of constant speed on results is small based on the analysis of measured and simulated data. The SG still needs time to discuss about test conditions, such as boundary conditions, constant speed and distance of constant speed phase. Steps for goal: The SG will agree on this issue in #9 meeting(June).

Conditions for Shorten Test Procedure Proposals (tentative) (Under construction) Proposals (tentative) Boundary for STP use Test method Test vehicle’s range Consecutive cycle test Shorten test Range < 70km (L ~ exH ) < 60km (L ~ H ) Mandatory Prohibit Range ≧ 70km (L ~ exH )     ≧60km (L ~ H ) Constant Speed Cycle L ~ exH : 100km/h , L ~ H : 80km/h Constant Speed Cycle duration CSCM : rest (= Total range – cycle driving distance – CSCE) CSCE : 3 ~15km

2. Next Actions 6 7 8 9 10 IWG Meeting #11 #12 Drafting Meeting #3 #4 18, Oct E-Lab. Meeting #9 #10 @Brussels(24~26) gtr drafting for resolved issues (WLTP IWG adopted) @Brussels(22,23) Deadline of gtr submission gtr drafting in advance is necessary

Information: WLTP schedule ~2014 2015 2016 2017 2018 2019 2020 Phase 1b Phase 2 items* will be listed Phase 2 ? Phase 3 *”items” means discussion items in phase 2. it does not mean the GTR(phase 2) items. 1. battery durability Durability of electrified vehicles is one of possible items in phase 2. The European commission recommends WLTP to collaborate with EVE on battery durability issue. Review of the items for phase 2 will be started as the preparation process of phase 2.