LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.

Slides:



Advertisements
Similar presentations
A. Bay Beijing October Accelerators We want to study submicroscopic structure of particles. Spatial resolution of a probe ~de Broglie wavelength.
Advertisements

June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
(n)QPS LHC status LHC: past, present and future Mike Lamont for the LHC team
Status of the LHC Mike Lamont for the LHC team. The LHC Very big Very cold Very high energy 2.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
Luminosity expectations for the first years of CLIC operation CTC MJ.
LHC progress Report LHCC Wednesday 23 rd March 2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Filling Schemes for the 2010 Heavy Ion Run Updated (3 rd iteration) version of BCWG presentation initially on 28 September, updated after discussions with.
LHC Machine Operational Status and Plans LHCC, 22nd September 2010 Steve Myers (On behalf of the LHC team and international collaborators)
Turnaround time in modern hadron colliders & store-length optimization
LHC Status Report 1 Jan Uythoven For the LHC Team LPCC
CERN’s Large Hadron Collider
LHC Status Fri Morning 3-June
LHC Status and Prospects
The CERN Physics Programme
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
MPI-ATL Calor Meeting 7-Sep-2009 H. Oberlack MPI für Physik, Munich
LHC schedule.
LHC Machine Status report
Machine Coordinators: G. Arduini, J. Wenninger
10th Hadron Synchrotron Incoherent effects section meeting
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Lecture 2 Live Feed – CERN Control Centre
Status of the BLHC ….work in progress! Mike Lamont CERN/AB 18/01/2008
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
The Status of the LHC machine
LHC Morning Meeting - G. Arduini
Machine Progress Towards Higher Luminosity
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
Summary of Week 16 G. Arduini, J. Wenninger
CSP Meeting CERN CERN Accelerators in th November 2010
First Beam in the LHC September 10, 2008 in the ATLAS control room.
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Saturday – Morning 7:36 beams dumped
LHC upadtes.
Friday Morning 7:30 injection for fill 2908
Overall commissioning strategy for protons (estd. 2005)
LHC Beam Operations Past, Present and Future
Summary Thursday h21: Stable beams fill #1303.
LHC Morning Meeting - G. Arduini
Lecture II.
Tue/Wed 12/ :00 Probe beam back again
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
LHC nuova schedule dopo Chamonix
Installation, Commissioning and Startup of ATLAS & CMS Experiments
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC Morning Meeting - G. Arduini
Saturday 6th October 05:38 STABLE BEAMS # :06 OP dump
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Monday 152 bunch operation summary
Tuesday
Presentation transcript:

LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012

LHC: end of 2012 physics period

ATLAS / CMS luminosity Integrated luminosity in 2012 passed 20 fb-1 last week. Fast luminosity ramp up was possible based on 2011 experience. Peak L = 7.7×1033 cm-2s-1. We expect to reach 23-25 fb-1 by the end of the run.

Example: last 3 weeks Intensity B1 Intensity B2 Luminosity Energy

Efficiency Average fill length: 6.0 hours Average fill length comparable to 2011. Fill length is determined mostly by MP system detecting parameters outside envelope and triggering a beam dump. Spent 36% of scheduled time with stable beams. Compared to 33% in 2011

Proton-Lead test and run A test with 13 colliding p and Pb bunches was done end September 2012 with few hours of first p-Pb collisions. A 4 week long run will be made in Jan/Feb 2013. Expected beam parameters: 200 ns spacing proton and Pb beams, ~350 bunches / beam, p in ring 1 + Pb in ring 2, and vice-versa, Luminosity ~ 6x1028 cm-2s-1. ALICE p-Pb event

LHC LS1 schedule Beam Commissioning 13 TeV W-Up Splices Cool-down M CSCM Splices Cool-down 13 TeV Beam Commissioning M

LMC 10 October 2012: Quadrupole diode consolidation => + 1 month

Third LHC Splices Review Production Readiness Review