Wednesday 6.10 Morning: Quench test at 450 GeV

Slides:



Advertisements
Similar presentations
● Main goals for week 33: – Luminosity production; – First 150 ns bunch train attempts; – Roman Pots: check movement at 3.5 TeV, with 1b; – Off momentum.
Advertisements

Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
Goal of the week: Stable beams with trains of 200 & 248 bunches 1 OP summary of week 40 R. Bailey, J. Uythoven & J. Wenninger.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
LHC Status Fri Morning 3-June
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Saturday 30th June - Sunday: Rocky !
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Monday morning 08:30 Start of rephasing MD. Dry tests in the morning.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Saturday 12:00 Fill 1992 in stable beams.
Thursday morning – optics correction
Monday 18 October : Collimation system
LHC Morning Meeting - G. Arduini
Monday – recovery from MKI flashover
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Lost at 12:05 to power converter (RTQX2.R1) problem
LHC Morning Meeting - G. Arduini
Thursday 10th May - morning
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Wire almost entirely through beam before BLM triggers dump
Tuesday 9th November 10:02 Fill beams dumped
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 03/11 – The Plan Finish electron-cloud program:
Sunday/Monday & :30 Stable beams. Fill #1851.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Monday 14:00 beam dump Access:
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday Fill 1364 (24 bunch) dumped at 07h
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Thursday 26th July 13:21 Fill 2880 beam dumped
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 24 September 2011.
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Another Immortal Fill….
Wednesday 26 October 2011.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Thursday 10:00 Fill 1986 in stable beams.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Monday 152 bunch operation summary
Tuesday
Presentation transcript:

Wednesday 6.10 Morning: Quench test at 450 GeV Vertical bump (upward) on MQ.14R2.B2, horizontal bump (inside) on MQ.14R2.B1. Probing loss scale of ~ 1 second. Beam2: Triggered busbar protection of nQPS on MQ with 1.6E11 and 2.4E11 (not with 1E11). EE opened, but heaters not fired. Beginning of the quenching of MQ observed. Beam1: Triggered old QPS on MB C14.R2 in front of MQ with 1.7E11. Quench heaters were fired. Beam loss before PM trigger ~1E11. Detailed analysis to be done. 8:30 meeting

BLM signal with 2.4E11 p – note the threshold was increased by a factor 3 to correspond to 3 times estimated quench level. 8:30 meeting

Wednesday 6.10 Central timing lost synchronization with the GPS at about 8am. Synchronization problems seen for PM timestamps, in particular the BIS. Timing expert reconnected the central timing around 11:00. Another ½ hour and a couple PM tests required to ensure all BICs were correctly synchronized again. 8:30 meeting

Wednesday 6.10 Afternoon: PLL test in ramp ADT gain reduced by -3 dB for PLL to work. Ramp of 8 nominal bunches with PLL on B2 and constant excitation amplitude (amplitude loop not commissioned). PLL locked for most of the ramp. Some issues observations that need further attention: - PLL locked on line that was 0.01 off the real tune (possibly Q+nQs). - Systematic tune offset error of few 1e-3. - PLL Q estimates oscillated during part of the ramp while FFT Q measurements were stable. - Beam-blow up: no measurement of the initial emittances, but ended up with quite big beam in B2. - Life-times puzzle: sometimes good (> 600 hours) sometimes very bad (< 5h) Test of a PLL/ADT failure where the ADT switches 'off' while the PLL is 'on'. Slow losses of about 3% over a minute. 8:30 meeting

Wednesday 6.10 19:00 Preparing for physics fill with 200b Again problems with RBI.221 in TI2 (third intervention on the PC today). Again problems with BLM crate in IR7 (crate fails, SIS dump) – same that dumped the previous physics fill. Beam dumped twice. Power cycled by BLM expert. Did not help. CPU exchanged with a lab CPU – temporary fix. Then problem of booster PS. 02:00 Filling Both B1 and B2 QFBs off in the ramp. Issues with coupling in the squeeze – B1. 04:40 Stable beams 1397 8:30 meeting

8:30 meeting

Vacuum Few 10-9 8:30 meeting

Today Access ~ 1 hour: Injection of 24 bunches Pt4 BBQ Pumping station Pt2 ALICE ATLAS AC dipole if it fits in. BLM crate CPU exchange SR7 No access in Pt8 – lift maintenance. Injection of 24 bunches Physics with 248 bunches – if no problems found with fill 1397. 8:30 meeting

Scheduled lift maintenance Some preventive maintenance has been requested on the LHC lifts, and agreed according to the following planning: Tuesday 5 October:             PM15 from 8h to 12h00; PM25 from 13h30 to 17h30 Wednesday 6 October:       PX24 from 8h to 12h00; PZ33 from 13h30 to 17h30 Thursday 7 October: PM85 from 8h to 12h00; PZ85 from 13h30 to 17h30 Tuesday 12 October :          PM56 from 8h to 12h00; PM65 from 13h30 to 17h30 Wednesday 13 October:     PZ65 from 8h to 12h00; PM76 from 13h30 to 17h30 Thursday 14 October:          PM45 from 8h to 12h00; PZ45 from 13h30 to 17h30 LHC status