North Carolina's Selective Vegetation Removal.

Slides:



Advertisements
Similar presentations
What do you think? 1.Removal of water loving species like sycamore and willow or aquatic plants is the best way to increase stream flow. True or False.
Advertisements

DANIEL PETERSON Transportation Operations Supervisor II Alexandria Sub Area MN/DOT Performance Measures: Integrated Roadside Vegetation Management.
Presented by Dr. Teri Hamlin Georgia Department of Education The appearance of a properly pruned plant is like a good hair cut: hardly noticeable at first.
Management for Water Yield Basic treatments –Removal of woody vegetation –Weather modification –Construction of “catchments”
Thorntons Inc. Landscape Standards 1. Table of Contents PAGE #TITLE 3Thorntons Inc. Signage 4Landscape Bed Standards 5Trimming Shrubs 6Dead Shrubs 7Lawn.
Heavy Equipment  Addressed under 1926 Subpart O: Heavy Equipment  All equipment left unattended at night, adjacent to a highway in normal use, or adjacent.
Digging out the trenches, experience in Russey, August 2003, version Delineate 3 independent contiguous trenches on a surface of 11 x 4(5) meters.
CERTIFICATE 4 IN BUILDING BCGBC4004A. General Notes  Site clearing billed in m 2 & includes trees ≤0.5 m girth measured 0.5 m above ground  Tree removal.
Route 6 CorridorProject Limits Exit 1 Exit 2 Exit 3 Exit 4 Barnstable T.L.
HOW TO DO Soil Sampling. Purpose Determining the fertility level of a soil through a soil test is the first step in planning a sound lime and fertilization.
Mississippi DOT Roadsides, Drainage & Vegetation Management Standards.
Vegetation Tutorial Start. In this tutorial, this exercise helps to calculate tree heights (H 1 ) and lengths of bore (H 2 ). Each set of tree data occupy.
Tree Measurement and Forest Evaluation Review Bob Hansen, Linda Carnell & Sarah Ashton.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
DFC: Desired Future Condition Forest Practices Board March 31, 2009 Chuck Turley/Lenny Young.
THE WASHBURN NEIGHBORHOOD ASSOCIATION presents: RAIN BARREL INSTALLATION.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Vegetation Control For Safety Russ Johnson – Maintenance Supervisor - WSDOT Don Petersen – Safety/Design Engineer - FHWA.
Tree Data National Manual Version 1.61 Section 5.0.
Traffic Barrier Guidelines Section 3.0 Potential Roadside Obstacles Hands-On Workshop III July
2006 Annual Educational Conference on Outdoor Advertising Cleveland, Ohio Keith C. Melvin, CPM Director of Outdoor Advertising South Carolina Department.
Woody Plant Installations to Ensure Survival Lync Training (12 March 2013) Dr. William M. Fountain Extension Professor of Arboriculture UK College of Agriculture.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
MODOT’S ODA VEGETATION CONTROL PROGRAM. Missouri statutes allow for the cutting and trimming of vegetation on the highway right of way which interferes.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Large Woody Debris in Valley Creek By: Conan McCarty.
Soil Inquiry By Mary Crabb. Observation/Prior Knowledge I knew that different types of soil can be more fertile then others because if you have a garden.
MNM Fatal Explosives Accident Explosives Accident September 7, 2011 (Alaska) September 7, 2011 (Alaska) Gold Mine Gold Mine Miner Miner 30 years.
North Carolina Symbols Nakia. The state Bird Was selected in 1943 Because its, a year round bird in its, the most common.
Chapter 41 Rendering Methods for Perspective Drawings.
7 th Grade Math Pg I can read and write integers and find the absolute value of a number.
Lift Station No. 1 and 2 Force Main Replacement Ronald Wastewater District Summer 2015.
East Link Extension Bel-Red Tree Mitigation Light Rail Permitting Citizen Advisory Committee July 2, 2014.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Land Clearing. Aims of cleaning land 1.Remove the obstacles 2.Remove the topsoil.
Silverthorn Elaeagnus pungens (Thunb.) Elaeagnaceae.
Excavation.
Excavating, planting and mulching Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright 2012.
MNM Fatal Falling Material Accident Falling Material Accident April 11, 2012 (North Carolina) April 11, 2012 (North Carolina) Sand & Gravel Operation.
Africa: Climate and Vegetation Mr. Dodson. Africa is so hot because it lies between the Tropic of Cancer and tropic of Capricorn “Sahara” is Arabic for.
Modify guardrail ends to increase access width Action 1.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
Hosted By Your wonderful teacher Mr. Embree Terms coordinate plane Integers Evaluate expressions
August 2008 Preparing the Planting Site Developed by: Dr. Teri Hamlin Georgia Department of Education.
Looking east Above ground spa and wood deck to be removed and lines capped Wood fence to be reconnected Wood fence to be removed Patio cover to.
Adapted from Teri Hamlin
OLD TOWN COMMUNITY WORKSHOP
THE WASHBURN NEIGHBORHOOD ASSOCIATION presents:
Trails Carolina
Therapy Programs Provider: Trails Carolina
Trails Carolina: Social Media Profiles
ФОНД ЗА РАЗВОЈ РЕПУБЛИКЕ СРБИЈЕ
Pollen Understanding samples from 2009 deep drilling of Lake El’gygytgyn Local application with North Carolina Pollen.
Gleaning Useful Results From Operational Trials
Town of Westport pLANNING bOARD SUBDIVISION RULES AND REGULATIONS
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
Lesson Plan Day 4 >Chapter 7- Power Point > Driver’s education notes: Steering straight backward, Changing lanes, Hand over hand steering, Push Pull steering,
II //II // \ Others Q.
'III \-\- I ', I ,, - -
“Ground Water Movement”
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
№96 сонли умумий ўрта мактабининг ўқитувчиси Эшанкулова феруза
Roof Control Jeopardy.
Which one? Circle: + and no a or b OR a=b Ellipse: + and =1 and a=b
,, 'III \-\-
Pictures from the Forest Industry
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
Presentation transcript:

North Carolina's Selective Vegetation Removal

Old Clearing Limits ROW Billboard Centerline 125’ Trees Mowing Line 40’ Travel Lane

Existing Clearing Limits Billboard 125’ Centerline A 100’ B ROW II Trees I III Mowing Line 40’ C D E Travel Lane 50’ 250’

Site Review Blocked Sign Face Sign Face Not Blocked

Site Review Determine if trees were 4 inches in diameter at time sign was installed

Site Review Layout Cutting Zone

Compensation Compensation Area II I III A B ROW C D E Billboard 125’ Centerline A 100’ B ROW II Trees I III Mowing Line 40’ C D E Travel Lane 50’ 250’

Compensation Measure Trees to determine ... III Measure Trees to determine ... If Trees are 12” in diameter at 6” above ground level, then measurement taken at 4’6” If Trees are less than 12” Diameter at 6” above ground level, measurement is taken at 6” … total caliper inch removal (for trees 4 inches and greater) and total cost.

Restoration Plantings Desired Restoration Areas Billboard Compensation Area 125’ Centerline A 100’ B ROW II Trees I III Mowing Line 40’ C D E Travel Lane 50’ 250’

Restoration Areas II I A B ROW C D Billboard 125’ Centerline 100’ Trees I Mowing Line 40’ C D Travel Lane 50’ 250’

Allowable Cutting Zones Cutting Procedure Allowable Cutting Zones Billboard 125’ Centerline A 100’ B ROW II Trees I III Mowing Line 40’ C D E Travel Lane 50’ 250’