Liaison Report Date: Authors: January 2011

Slides:



Advertisements
Similar presentations
Doc.: IEEE Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 1 71st Session of meetings of the IEEE Working Group for.
Advertisements

Doc.: IEEE m TG4mSlide 1 March 2013 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission.
Doc.: IEEE /1187r1 Submission September 2012 Clint Chaplin, Samsung ElectronicsSlide Liaison Report Date: Authors:
Liaison Report Date: Authors: September 2009
Liaison Report Date: Authors: January 2012
Report on Date: Authors: January 2015 July 2013
Liaison Report Date: Authors: November 2009
Liaison Report Date: Authors: November 2012
January 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2016] Date.
Submission Title: TG4m 4TV Closing Report for May 2013
Liaison Report Date: Authors: September 2008
Liaison Report Date: Authors: July 2008 July 2008
TGaf Waikoloa Closing Report
doc.: IEEE <doc#>
January 2013 doc.: IEEE < > January 2013
Liaison Report Date: Authors: January 2012
Liaison Report Date: Authors: July 2012
Submission Title: TG4m-4TV Closing Report for November 2011
Liaison Report Date: Authors: January 2014 July 2013
Liaison Report Date: Authors: September 2011
Submission Title: TG4m 4TV Closing Report for January 2013
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4n Chinese Medical Band Closing.
Liaison Report Date: Authors: May 2013
November 2010 doc.: IEEE < > November 2010
<month year> doc.: IEEE < e> <July 2018>
February 19 November 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: RFID-SG Closing Report for.
Liaison Report Date: Authors: July 2011
<month year> doc.: IEEE < e> <September 2018>
Liaison Report Date: Authors: March 2011
Liaison Report Date: Authors: July 2011
Report on Date: Authors: November 2018 July 2013
Report on Date: Authors: March 2016 July 2013
September, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2015]
Report on Date: Authors: November 2016 July 2013
Liaison Report Date: Authors: July 2009
Report on Date: Authors: January 2019 July 2013
Jul 15, /15/10 07/15/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report.
TGaf Waikoloa Closing Report
Report on Date: Authors: March 2019 July 2013
Liaison Report Date: Authors: March 2012
Report on Date: Authors: July 2016 July 2013
Liaison Report Date: Authors: March 2011
Liaison Report Date: Authors: November 2011
Liaison Report Date: Authors: January 2012
Liaison Report Date: Authors: May 2014 July 2013
Liaison Report Date: Authors: September 2013
Report on Date: Authors: July 2018 July 2013
Liaison Report Date: Authors: March 2012
Liaison Report Date: Authors: January 2012
Report on Date: Authors: January 2016 July 2013
Liaison Report Date: Authors: May 2013
Liaison Report Date: Authors: September 2012
Liaison Report Date: Authors: May 2014 July 2013
Liaison Report Date: Authors: March 2010
Liaison Report Date: Authors: September 2010
Liaison Report Date: Authors: November 2013
Report on Date: Authors: July 2016 July 2013
Liaison Report Date: Authors: July 2010
Liaison Report Date: Authors: September 2013
Report on Date: Authors: January 2019 July 2013
Report on Date: Authors: May 2019 July 2013
doc.: IEEE g-Trends-in-SUN-capacity
Liaison Report Date: Authors: September 2010
Report on Date: Authors: July 2017 July 2013
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for TG4j (MBAN) Task Group, Nov.
Liaison Report Date: Authors: November 2011
Report on Date: Authors: May 2019 July 2013
Report on Date: Authors: July 2019 July 2013
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Specialty Networks (WSN) Submission Title: TG4z EIR Closing Report for September.
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Specialty Networks (WSN) Submission Title: TG4z EIR Closing Report for September.
Presentation transcript:

802.15 Liaison Report Date: 2011-01-21 Authors: January 2011 January 2011January 2009September 2008 January 2009September 2008 September 2008 doc.: IEEE 802.11-08/xxxxr0 January 2011 802.15 Liaison Report Date: 2011-01-21 Authors: Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

Abstract Liaison report on 802.15 as presented to 802.11 January 2011 September 2008 January 2009September 2008 January 2011January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 January 2011 Abstract Liaison report on 802.15 as presented to 802.11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

September 2008 January 2011January 2009September 2008 May 2008 January 2009September 2008 doc.: IEEE 802.11-08/0697r0 doc.: IEEE 802.11-08/xxxxr0 January 2011 802.15.4 Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 January 2011 802.15.4e MAC amendments Second Initial WG ballot LB60 on D2.0 closed November 7, 2010. Results were 128/25/11. 83.66% Affirmative: Passes 858 comments: 355 Technical, 494 Editorial, 9 General Resolved all comments Expecting to go out for first Recirculation WG ballot after draft is complete (late February) Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 January 2011 802.15.4f RFID First Initial WG ballot LB63 on D1.0 closed December 14, 2010. Results were 132/23/15. 85.16% Affirmative: Passes 332 comments: 134 Technical, 197 Editorial, 1 General Resolved all comments Expecting to go out for first Recirculation WG ballot after draft is complete (late February) Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

802.15.4g Smart Utility Networks September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 January 2011 802.15.4g Smart Utility Networks Second Initial WG ballot LB59 on D2.0 closed November 4, 2010. Results were 156/22/8. 87.64% Affirmative: Passes 1188 comments: 713 Technical, 475 Editorial Resolved all comments Expecting to go out for first Recirculation WG ballot after draft is complete Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 January 2011 802.15.4i Rollup First Recirculation WG ballot LB64 on D2.0 closed December 1, 2010. Results were 169/3/7. 98.26% Affirmative: Passes 67 comments: 8 Technical, 59 Editorial Resolved all comments Second Recirculation WG ballot LB65 on D3.0 closed January 1, 2011. Results were 175/1/8. 99.43% Affirmative: Passes 14 comments: 1 Technical, 13 Editorial Met Conditional Approval Requirements Initial Sponsor ballot in process: closes February 9 Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Page 7 Page 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

802.15.4j MBAN First time group met as Task Group Initiated Task Group September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 January 2011 802.15.4j MBAN First time group met as Task Group Initiated Task Group Appointed Chair: Ray Krasinski Discussed timeline Discussed FCC MBAN Rulemaking History and Current Status at FCC Agreed to Requirements document (15-11-0064) to guide amendment writing Issued a Call for Proposals (15-11-0095) Proposals will be heard March and May Slide 8 Slide 8 Clint Chaplin, Samsung Electronics Page 8 Page 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

802.15.6 Wireless Body Area Networks September 2008 November 2007 January 2011January 2009September 2008 doc.: IEEE 802.11-07/2752r1 doc.: IEEE 802.11-08/1003r0 January 2011 802.15.6 Wireless Body Area Networks First Recirculation WG ballot LB66 on D2.0 closed January 12, 2011. Results were 139/25/14. 84.76% Affirmative: Passes Completed resolving 493 out of 578 comments (doc# 15-11-0030) on draft 2.0 Hope to finish resolving comments in March Plans for March 2011 plenary session Singapore Complete resolving remaining 150 comments Begin work on Coexistence Document Issue 3rd re-circulation letter ballot On track to begin Sponsor balloting in July 2011 Slide 9 Slide 9 Page 9 Page 9 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

802.15.7 Visible Light Communication September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 January 2011 802.15.7 Visible Light Communication Third recirculation WG ballot on D4.0 closed November 29, 2010. Results were 138/5/26. 96.50% Affirmative 1 comment: restatement of previous comment Met conditional approval requirements First initial Sponsor ballot on D4.0 closed December 30, 2010. Results were 91/3/7. 96.81% Affirmative 163 comments: 63 technical, 97 editorial, 3 general Finished resolving all comments Now editing comment resolutions into draft. Hoping to start third recirculation WG ballot mid-February Approved and submitted a modified PAR to match the Scope and Purpose with the Scope and Purpose in draft Slide 10 Slide 10 Clint Chaplin, Samsung Electronics Page 10 Page 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

Personal Space Communications SG September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 January 2011 Personal Space Communications SG Modified PAR and 5C based on comments received in November meeting Planning on submitting updated PAR and 5C to 802 ExCom in March Slide 11 Slide 11 Clint Chaplin, Samsung Electronics Page 11 Page 11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 January 2011 TV White Space SG SG 4TV 1st meeting was called to order at AM2 session on Monday 17 January 2011. 26 Attendee Cancel 2 sessions (Wednesday & Thursday) Introduced backgrounds and motivations for use of TV white space by amending 15.4. Discussed the process to prepare PAR and 5C Request call for Application/call for Contribution until March 2011 Singapore meeting - Will distribute through the WG 15 and SG 4TV email reflectors - Will listen to responses to this call in Mar. 2011 meeting Next meeting will held March 2011. Slide 12 Slide 12 Clint Chaplin, Samsung Electronics Page 12 Page 12 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

Better Use of Spectrum Resources in WPANs IG September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 January 2011 Better Use of Spectrum Resources in WPANs IG Did not meet this week Next meeting will held March 2011. Slide 13 Slide 13 Clint Chaplin, Samsung Electronics Page 13 Page 13 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

Host Identity Protocol IG September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 January 2011 Host Identity Protocol IG Attendance of One Slide 14 Slide 14 Clint Chaplin, Samsung Electronics Page 14 Page 14 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

THz IG Did not meet January 2011 September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 January 2011 THz IG Did not meet Slide 15 Slide 15 Clint Chaplin, Samsung Electronics Page 15 Page 15 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 January 2011 WNG 802.15.4 Information Elements (IEs) (15-11-0083-00-wng0-summary-of-information-elements-for-802-15-4.pptx) - Ben Rolfe (BCA) Overview of PSC concepts (15-11-0078-00-wng0-overview-of-psc-concepts.pptx) - Soo-Young Chang Slide 16 Slide 16 Clint Chaplin, Samsung Electronics Page 16 Page 16 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

References This document All Documents September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE 802.11-08/xxxxr0 doc.: IEEE 802.11-08/0697r0 January 2011 References This document All Documents https://mentor.ieee.org/802.15/documents Current draft is in the members-only area http://www.ieee802.org/15  Members_Only_Area 802.11 members log in using 802.11 username and password Slide 17 Clint Chaplin, Samsung Electronics Page 17 Clint Chaplin, Samsung Clint Chaplin, Samsung Electronics