Two methods to observe tutorial

Slides:



Advertisements
Similar presentations
9/16/2003; Revised 7/12/2004 DPI Vehicle Fleet Management IM-1 1 Use this procedure to extend material master data to another plant. 1.From the SAP R/3.
Advertisements

Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Order Inquiry by Entry Date RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed.
SAP ERP Basic System Navigation
Material Number (DOT#) Search DPI Vehicle Fleet Management IM-5
Issuing Material to Work Orders DPI Vehicle Fleet Management
DPI Vehicle Fleet Management- DR-14
DPI Vehicle Fleet Management OP-7
Display Time Confirmations DPI Vehicle Fleet Management DR-5
Reviewing Daily Transactions DPI Vehicle Fleet Management DR-3
Create Odometer Measurement Documents
Cancel Time Confirmations DPI Vehicle Fleet Management TE-4
DPI Vehicle Fleet Management DR-6
DPI Vehicle Fleet Management DR-21
DPI Vehicle Fleet Management DR-18
DPI Vehicle Fleet Management IM-4
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Wings 2.0 Business Flow Reference
(Work Orders W/One Operation) DPI Vehicle Fleet Management TE-2
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Presentation transcript:

Two methods to observe tutorial Standard Method This method allows presentation to be resized to user preference. Slide Show Method (Example below) Presentation fills entire screen Click on Slide Show tab at top of screen Click icon <From Beginning> Note: Either method; to advance click the progression arrow in the bottom right corner of each slide or press the down-arrow key.

Transaction Procedures Welcome to BSIP 101 Transaction Procedures Time Cancellation Instructor: Stephen Wright DPI Technical Consultant

Purpose: Use this transaction to cancel time on a workorder.

One transaction is required to complete this procedure: IW45 Let’s get started -

Your screen should look similar to the example at the right. From the SAP R/3 Easy Access screen box type IW45 or from your favorites menu, select transaction IW45 – Cancel PM Order Confirmation Your screen should look similar to the example at the right.

Cancel PM Order Confirmation: A new window opens: Cancel PM Order Confirmation: Initial Screen Order Tab (Input) Order - Work order number that contains time confirmations to cancel. Activity – Transaction to cancel. Tip: If only canceling time for a single transaction – enter the activity code. Otherwise leave the field blank. Press the <Enter> key

Cancel PM Order Confirmation: A new window opens: Cancel PM Order Confirmation: Initial Screen Tip: If the workorder has been Teco’d, a warning message will display. Click Yes on the dialog box.

Enter PM Order Confirmation: A new window opens: Enter PM Order Confirmation: Operation Overview Click on the Gray Box to the left of each operation; the box serves as a toggle switch to select and de-select the line. Click the Actual Data icon

Enter PM Order Confirmation: A new window opens: Enter PM Order Confirmation: Actual Data Click the Save icon to record changes.

Enter PM Order Confirmation: A new window opens: Enter PM Order Confirmation: Actual Data Input the reason for the cancellation. Click the Back icon to return to the initial screen.

Enter PM Order Confirmation: A new window opens: Enter PM Order Confirmation: Initial Screen Tip: A message appears in the status bar confirming the cancellation. Click the Enter icon if more confirmations on this particular need to be cancelled. OR Click the Exit icon to return to the main menu.

Questions Email: Stephen.Wright@dpi.nc.gov

Thank You! Stephen Wright DPI Technical Consultant