Building 360 Freight Elevator Rehabilitation at SSWRF

Slides:



Advertisements
Similar presentations
Means of Vertical Circulation: Elevators traction verse hydraulic types, sizes, speeds and finishes, escalators. Hydraulic Elevators Traction Elevators.
Advertisements

Acme Industrial Mechanical, Inc. Capabilities Presentation Performance-Based Planned Maintenance Providing Leadership Quality Service for the HVAC Industry.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
1 Roof Top Units Saving Energy and Improving Occupant Comfort Presented by Ethan Bellavance and Mary Jane Poynter.
URD Cable Rehabilitation Program SWEDE 2009 Tulsa, OK May 7, 2009 B. Shawn Cobb, P.E.
Crabtree, Rohrbaugh & Associates, Architects Montoursville Area School District High School Project Update February 10, 2015.
More... Better... Different. Performance Based Maintenance Contracting – An Asset Management Approach.
Set the Table for Success Pat Prince, Phoenix Union High School District Barry Chasse, Chasse Building Team.
CO# OS POSITIVE TRAIN CONTROL PROJECT Change Order #4 October 17, 2013 Related to Agenda Item 11.
WOLD WIDE HYDRAULIC SERVICE AND COMMISSIONING. YOUR SOLUTION PROVIDER Global expert in hydraulics and lubrication solutions. We have specialist competences.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Replacement Analysis Course Outline 10.
Department of Public Works CONTRACT AWARD TO RECON ENVIRONMENTAL, INC., FOR LOWER ARROYO HABITAT RESTORATION City Council December 14, 2015.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Grafton Public Schools. Extraordinary Expenses Additional Classrooms Additional/ Replacement Furniture Added Security Devices Replace Rotted Grease Trap.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
Calcasieu Parish Mechanical Treatment Plant Inspection Program Calcasieu Parish Division of Planning and Development November, 2011.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
AMI System Status Report December 11, Project Objectives Selection, p rocurement and implementation of an AMI System that: Provides automated meter.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
AC’s- integral part of life. Rising temperature and high standard of living have made AC’s an important part of our lifestyle. The AC distributes conditioned.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
59th Technical Committee Meeting, Barcelona (ES), March 26-27, 2012 SC A1 PREFERENTIAL SUBJECTS FOR 2014 SESSION DRAFT PS1: Developments in Rotating Electrical.
Development of a Comprehensive Modernization Project at Burroughs Middle School Community Meeting January 20, 2016.
Project proposal Acronym and Title
Runway Rehabilitation: Award of construction contract and acceptance of 3 grants Resolution June 22, 2009.
Advantages & Disadvantages of Rotary Screw Air Compressors in Myanmar
After the FCC Form 471 E-rate Program Applicant Training
District-Wide Well Maintenance, Rehabilitation, and Repair
Infrastructure, Innovation and Standardization
Fans & Heaters technical seminar
Operations Update 15 November 2012
1(844) How to Fix HP Printer Error Code 0x610000f6 ?
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
Symptoms of a Faulty Cylinder Head Temperature Sensor.
What are the Common Symptoms of a Fallen Power Window Regulator?
How could you Find the Dirty Fuel Filter of your Car
Top 5 Auto Repairs you Should Fix it Yourself at Home
Some Basic Idea on the Different Types of Fuel Injection Service
2013 RTS Campus Improvement Project
Board of Education Workshop – April 2015
Improvement in Project Delivery
مفهوم الموازنة العامة المقدمة
Clean your hardware EIT, © Author Gay Robertson, 2016.
Illinois Waterway 2020 Consolidated Closure
Delegated Acts concerning PPPs
Huntsville High School Softball Program Upgrades
CURRENT CHALLENGES IN HR in the Commission and Eurostat
Prodcom Working Group September 2014
Division of Business & Finance Accounting Services Information Technology and Plant Operations 2017 Budget Hearing April 22, 2016.
CEM 515 Done by: Abdulkarim Sulais
Change Order 4 Contract J06026C01 JIWRF Nonhazardous Site Lighting Upgrade Restore ED Original Delegated Authority Approve Changes to Total Contract.
Execute Purchase Order South Shore Water Reclamation Facility Building 359 Odor Control System Repairs Commission Agenda Item #8.
Award of Contract M06013C04 Project Management Information System (PMIS) Licensing, Maintenance and Service Agreement Commission Agenda Item #13.
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
Change Order Number One Purchase Order for Ferric Chloride Use
Change Order Number Five, Contract M03037P01, Professional Services, 2050 Facilities Plan – Ultimate Build Out, and Approve Changes in Total Project Cost.
Sludge Dewatering Filter Press Controls Upgrade at SSWRF
Change Order Request Contract S02013C01 SSWRF RAS System Improvements Restore ED’s Original Delegated Authority Approve Changes in TPC Commission.
Asset Management Plan Development and Implementation Support
Access Hatch Replacement Phase 4
Access Hatch Replacement Phase III
Authorizing ED to Reject Bid for Contract P01005C10
Jones Island Water Reclamation Facility
Commission Agenda Item #8
KK River Flood Management Community Outreach Services
SC1R COLD BOX PLATFORM DESIGN LOADS: 150 PSF LIVE LOAD
Authorize ED to Execute Purchase Order
Commission Agenda Item #1
Commission Agenda Item #2
Presentation transcript:

Building 360 Freight Elevator Rehabilitation at SSWRF Award Contract S06038C03 Building 360 Freight Elevator Rehabilitation at SSWRF Commission Agenda Item #4

Filter Press Building Freight Elevator Elevator is original to Filter Press Dewatering Building Used more than 25 years Important to efficient operation and maintenance

Elevator Issues Elevator does not level properly Currently inoperable Cylinder/plunger assembly Failed Needs to be replaced Situated inside underground casing

Proposed Contract Scope of Work Remove existing cylinder/plunger assembly Remove existing casing Install new casing Install new cylinder/plunger into new casing

Elevator Components Shaft Car Replace Plunger Replace Cylinder Replace Casing

Project Cost/Schedule Contract within budget Contract duration 275 days

QUESTIONS?