Enabling Large Scale Utilisation of Class 3

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Modification MOD_24_12 Amendments to the MIUN Calculator to address instances of Excessive Area.
Credit Scenarios – Modification 0335 Joanna Ferguson.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Mod Clarifications Transmission Workstream 6 August 2009.
Project Nexus Workgroup – Invoicing 11 th August 2014.
Customer Charge On behalf of all DNs 25 October 2010.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
Modification 0232 Presentation for Total By Gareth Evans.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
SoS Report PAC – 13th December 2016.
DSC Change Committee UK Link Future Releases Proposed Approach
Congestion Management
Interactions with the implementation of RIIO-T1
Supply Point Capacity BSSOQ and Supply Point ratchets
UNC Modification Proposal 0202 National Grid Distribution
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Proposer: Matthew Hatch Panel Date: 20/10/16
Consideration of issues raised by UNC Modification Proposal 0244
Distribution Workgroup 24/11/16
Corporation Tax Loss Relief
(Additional materials)
UNC Trader User – Licence obligations
Proposer: National Grid NTS Panel Date: 17th April 2014
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Confirmation Notice Period for Certain ‘Unique’ Sites
UNC Modification – Non Effective Days
Capacity Methodology Statements
Reduction of Exit Capacity at DM Supply Points
Distribution Workstream UNC Modification 0224 Draft UKLink Implementation Summary Responses 26th February 2009.
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
Modification 0117 – Additional Considerations
Consideration of issues raised by UNC Modification Proposal 0244
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
UNC Modification Proposal 0172 National Grid Distribution
Supply Point Capacity BSSOQ and Supply Point ratchets
Mod 124 Steve Nunnington.
Market Participant Identity Process – migration to UNC
UIG Task Force Progress Report
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Mod Proposal 0268 : AQ Backstop Date
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
CDSP Service Document amendment - high-level activity description*
Consideration of issues raised by UNC Modification Proposal 0244
CUSC “Alternate” Proposal process
Proposer: Debbie Brace Panel Date: 20th March 2014
Transmission Workstream - EU 3rd Package Update
UIG Task Force Progress Report
Additional Gemini API’s UK Link - Class 3 Modification
UK Link Manual Update (UNC Modification 0613)
Optimisation of Entry Capacity Modification Proposal
DN Interruption Phase II
Development Work Group 0209 Straw Man Update
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Implementation Approach Distribution Workgroup – June 2014
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
UIG Task Force Progress Report
UIG Task Force Progress Report
Enabling Large Scale Utilisation of Class 3
and Forecasting Resources
XRN Enabling large scale utilisation of Class 3 – MOD0700
UIG Task Force Progress Report
UIG Task Force Progress Report
Presentation transcript:

Enabling Large Scale Utilisation of Class 3 Supply Point Amendment processing

UNC Modification 0700 – SPC Capacity One facet of the change is proposed to specify a User limit of Supply Point Amendments, and Where this is breached allow the CDSP to reject excessive Amendments Following 0700 implementation the UK Link Manual will: Define a maximum daily limit of Supply Point Amendments (SPC) [currently stated as 26k] Set out how the daily User value is derived Define how excessive volumes will be communicated to Users (subject to design)

UNC Modification 0700 – SPC Capacity It is proposed that Users will provide projected Supply Point Amendment volumes for the following month User allocated volume = (User requested volume / Total requested volume) * Total Available Volume This will be defined as a daily limit (User allocated volume / no. of processing days) There may be a need, in subsequent months, to take account of unused User volume to prevent Users constraining capacity for other Users e.g. User requested volume – previously unused User allocated volume Currently, this is ONLY a discussion point – as any subsequent use of this will only be after issues identified, therefore adjustments to the calculation can be targeted Contract Management will be informed of the Total requested and allocated volume values provided [where requested volumes exceed capacity]