Hardware Injection Status Update

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Project Control Techniques
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
Implementation/Acceptance Testing / 1 Implementation and Acceptance Testing Physical Implementation Criteria: 1. Data availability 2. Data reliability.
Galin, SQA from theory to implementation © Pearson Education Limited Chapter 13 CASE Tools and their Effect on Software Quality.
ITIL: Why Your IT Organization Should Care Service Support
Getting the Most Out of Blue Mountain RAM
Sitefinity Performance and Architecture
Virtual Mechanics Fall Semester 2009
System Analysis and Design
Software Testing Life Cycle
CAA/CFA Review | Andrea Laruelo | ESTEC | May CFA Development Status CAA/CFA Review ESTEC, May 19 th 2011 European Space AgencyAndrea Laruelo.
S4/S5 Calibration The Calibration team G Z.
Deliverable Readiness Review LexEVS 5.1 December 17, 2009.
Design and Programming Chapter 7 Applied Software Project Management, Stellman & Greene See also:
T Project Review Tetrastone [Iteration 2]
©Dr I M Bradley Doing the project and other things.
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
PwC New Technologies New Risks. PricewaterhouseCoopers Technology and Security Evolution Mainframe Technology –Single host –Limited Trusted users Security.
EText Higher Ed Monthly Steering Committee Meeting January 2011 ONLINE TEXTBOOKS PERSONALIZATION INTEGRATED LEARNING MEDIA.
Summary We had used and the need to learn and implement using the software of Microsoft Visual Studio 2008 into our system upgrade. The report documents.
LIGO-G E1 Reviewer Report for the S2 Time-Domain Pulsar Search Teviet Creighton, Andri Gretarsson, Fred Raab, B. Sathyaprakash, Peter Shawhan.
HDF-EOS Workshop IV September 19-21, 2000 Richard E. Ullman ESDIS Information Architect NASA/ GSFC, Code 423.
The Registration Alert System LCA Overview. Overview The Registration Alert System (RAS) is web-based software package that allows University of Washington.
S3 and S4 pulsars injections Graham Woan, University of Glasgow, For Matt Pitkin Réjean Dupuis PULG … LIGO-G Z.
TEAM FOUNDATION VERSION CONTROL AN OVERVIEW AND WALKTHROUGH By: Michael Mallar.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
CASE Tools and their Effect on Software Quality
© CGI Group Inc. User Guide Subversion client TortoiseSVN.
Software Development. The Software Life Cycle Encompasses all activities from initial analysis until obsolescence Analysis of problem or request Analysis.
Software Development.
T Project Review X-tremeIT I1 Iteration
The SCEC CSEP TESTING Center Operations Review
Training Demo: DuPont Vendor Clients December 2016
Software Project Configuration Management
Managing the Project Lifecycle
Archiving and Document Transfer Utilities
Generator Services planning meeting
Overview of E10 / S3 Hardware Injections
Plans for stochastic hardware injection
Apple TV Error. Check Here.
ITIL: Why Your IT Organization Should Care Service Support
James Blankenship March , 2018
ITIL: Why Your IT Organization Should Care Service Support
KIT: UNM IT Knowledge Management
Design and Programming
Electronic Review Process
Privilege Separation in Condor
Hardware Injections in S4
User Guide Subversion client TortoiseSVN
Nicolas Rothbacher University of Puget Sound
First look at Injection of Burst Waveforms prior to S1
Project Management Process Groups
AGILENT TECHNOLOGIES RESTRICTED
Applied Software Project Management
Quick update on the project
Slaptitude by Focus Pocus
Welcome Traceability Software Integrators
Priorities and contents of releases
Enhancing the Quality of Care in the Intensive Care Unit
ITIL: Why Your IT Organization Should Care Service Support
Case Study 1 By : Shweta Agarwal Nikhil Walecha Amit Goyal
IT OPERATIONS Session 7.
How to Write a Test Plan? A Case Study.
Administrator’s Manual
© 2018 American Nurses Credentialing Center. All rights reserved
Lateral X-rays with ESS
Executive Project Kickoff
Progress Reports.
Presentation transcript:

Hardware Injection Status Update Eric Thrane, Adam Mullavey, Peter Shawhan, Jeff Kissel, and David Shoemaker on behalf of the HWINJ Team

Overview Critical infrastructure is set up and mostly tested. Hardware injections demonstrated in ER7 (or before): CW, CBC, Burst, Stochastic. Imperfect injection recovery: there appears to be a not-yet-understood sign-flip in H1 filters. Thank you to Technical Review Board (TRB) for helpful feedback; some recommendations implemented now, others saved for later due to limited FTEs.

Better Front-End Integration Now than in iLIGO Front-End Calibration Layout Diagram, https://dcc.ligo.org/LIGO-G1500765

ER7 Injection Software Injections carried out at H1 and L1 using version-controlled code. Transient injections carried out with tinj: a wrapper for awgstream. Request from TRB to migrate to Guardian in the future. CW injections carried out with psinject + makefakedata (LAL code). Stochastic injections carried out before ER7 with awgstream. HWINJ SVN: https://svn.ligo.caltech.edu/svn/dac/hwinj/Details/ DOCUMENTATION: https://dcc.ligo.org/T1400349

ER7 Debugging A number of bugs identified and fixed. An illustrative (but not exhaustive list): EPICS flag identifying injection type (burst vs. CBC) was backward. tinj died every 12.5 hours due to book-keeping error with file identifiers. tinj modified to check inent bit CW injection of L1 data at H1 For details, see Peter Shawhan’s wiki page: https://wiki.ligo.org/Main/HWInjER7

ER7 Logging & Segment Generation ODC uses front-end time series data and EPICS channels set by HWINJ code to set bitmask bits SegGener makes segments to go into dqsegdb Significant debugging due to confusion from last-minute changes to ODC bits, but eventually ODC bits and segments shown to behave properly. Injection results logged by injection code, but… Injections not yet marked in GraceDB (GRiNCH). Injection logs not archived. [sysadmins working on] No automated cross-check of ODC bits, segdb, log files, schedule etc. [being developed by Maryland grad student] RED: requires assistance from DA groups. PURPLE: priority action item for HWINJ team…in progress

ER7 Injection Recovery Mostly successful recovery with CBC, Burst, CW…ran out of time for coherent stochastic injection. See Peter’s wiki page for details. All recoveries appear to indicate a flipped sign in the H1 inverse actuation function filter. Investigations ongoing: focus is on construction of a more suitable filter for O1. Also significant calibration error apparent:

Recovered Burst Injections (Shawhan) -- Basically consistent with what Matt Pitkin found from CW injections Up to ~80% amplitude error phase delay + sign flip

Current Limitations of Injection System Saturation of injections at high frequency due to filter LIMIT LIMIT setting could be relaxed, but how much? Hard saturation will occur in the chain somewhere Limited implementation of operator override controls Basic enable/disable works; is checked 5 minutes before scheduled injection time No automatic restart of injection software Keith T. currently working to be able to run programs under monit

Blind Injections No blind injections performed during ER7. Blind injection code (simple!) added to version control since ER7. The blind injection team is in the process of beta testing the blind injection software now. We expect to be able to demonstrate blind injections before and during ER8.

Next steps Working to address most pressing improvements requested by TRB, especially archival of injection logs. Test blind injection infrastructure. New inverse actuation filter. Test recovery of burst/CBC/CW/stochastic injections with revised code during ER8. Test segment generation during ER8.