Roger Ruber for the FREIA team 11 June 2013, Uppsala

Slides:



Advertisements
Similar presentations
Tony Gabriel University of Tennessee April 19, 2013
Advertisements

Nine months at the European Spallation Source, Lund, Sweden
The European Spallation Source Dave McGinnis Chief Engineer – ESS\Accelerator Division IVEC 2013.
ISIS Accelerator Division
RF Development for ESS at Uppsala University
Manchester University and the Cockcroft Institute Roger Barlow Technologies manchester.ac.uk Accelerators for ADSRs An account of the requirements.
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
ESS linac Mats Lindroos, Cristina Oyon and Steve Peggs.
CW neutron source Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus Alonso, Lali Tchelidze 6/30/11 Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus.
Part2: Cavities and Structures Modes in resonant cavity From a cavity to an accelerator Examples of structures JUAS 2015 Linacs-JB.Lallement - JUAS
Safety at ESS. Thomas Hansson Nuclear Safety Engineer at ESS, since November 2011 Experience from Swedish Nuclear Power Plants since 1991 (Mainly Fuel.
LLRF Requirement and Parameters at ESS Rihua Zeng, Anders J Johansson LLRF workshop, Hamburg,
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
Page The High power proton accelerator for the European Spallation Source (ESS) S. Gammino Milano, 9 Marzo
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
ADSRs and FFAGs Roger Barlow. 7 Jan 2008Workshop on ADSRs and FFAGsSlide 2 The ADSR Accelerator Driven Subcritical Reactor Accelerator Protons ~1 GeV.
Dave McGinnis Chief Engineer – Accelerator Division
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
CAS, BilbaoMueller, Ugena, Velez, Zerlauth May 31 st v0 SCC – Industrial ADS.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Alexander Aleksandrov Oak Ridge National Laboratory
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
VIEW on RAD HARDNESS TESTS of STS FEE IN MEPHI. Simakov A.B. – Head of “Special Microelectronics” Lab.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs A.Farricker 1, R.M.Jones 1, R.Ainsworth 2 and S.Molloy 3 1 The University.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
Status of the 1.2 MW MB-IOT for ESS Morten Jensen CLIC Workshop 2016, January, CERN.
Aaron Farricker 107/07/2014Aaron Farricker Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Cryogenics at the European Spallation Source ESS
WP5 Elliptical cavities
Linac4 M. Vretenar for the Linac4 design team
Uppsala Commitment to ESS and FREIA Planning
Overview and System Design for ESS LLRF Systems
Accelerator Research and Innovation for European Science and Society
Access to radiofrequency testing facilities
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
ESS RF Development at Uppsala University
Part2: Cavities and Structures
1- Short pulse neutron source
Superbeams with SPL at CERN
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
Neutron Detector Systems at ESS
Implications of HOMs on Beam Dynamics at ESS
ADS Accelerator Program in China
A Superconducting Proton/Electron Linac
Collective Effects and Beam Measurements in Particle Accelerators
Part2: Cavities and Structures
Managing Parameters Karin Rathsman
European Spallation Source ERIC
Presentation transcript:

Roger Ruber for the FREIA team 11 June 2013, Uppsala FREIA Facility for Research Instrumentation and Accelerator Development Roger Ruber for the FREIA team 11 June 2013, Uppsala

06-Jun-2013 Roger Ruber - FREIA at Uppsala University

The European Spallation Source (ESS) Lund, Sweden, next to MAX-IV to replace aging research reactors 2019 first neutrons 2019 – 2025 consolidation and operation 2025 – 2040 operation 5 MW pulsed cold neutron source, long pulse 14 Hz rep. rate, 4% duty factor >95% reliability for user time short pulse requires ring, but user demand satisfied by existing facilities (ISIS, SNS, J-PARC) High intensity allows studies of complex materials, weak signals, time dependent phenomena Cost estimates (2008 prices) 1,5 G€ / 10 years 50% by Sweden, Denmark, Norway 06-Jun-2013 Roger Ruber - FREIA at Uppsala University

The ESS Accelerator single pass linear proton accelerator 5 MW p+: 50 mA, 2.5 GeV, 14 Hz, 2.86 ms < 1 W/m losses 95% user beam time reliability normal conducting (room temperature) electron cyclotron resonance source (ECR) radio-frequency quadrupole (RFQ) drift tube linac (DTL) superconducting (liquid helium temperature) double spoke resonators (DSR) with high velocity acceptance elliptical cavities (two families) © CERN CDS 6808042 06-Jun-2013 Roger Ruber - FREIA at Uppsala University 4