SPEED LIMIT ORDINANCE UPDATES

Slides:



Advertisements
Similar presentations
Speed Feedback Signs Traffic Engineering Division Board of County Commissioners February 11, 2014.
Advertisements

January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
Titusville to Edgewater Bike Loop PD&E Study
1 PIERCE COUNTY LIBRARY 2030: FACILITIES MASTER PLAN COMMUNITY ORGANIZATION MEETINGS PIERCE COUNTY LIBRARY SYSTEM SUMMER 2009.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
River to Sea TPO May 28, 2014 River to Sea TPO May 28, “I-4 BEYOND the ULTIMATE” PD&E REEVALUATION STUDY From west of US 27 to west of Kirkman Road.
From Island Estates Parkway to St. Johns County Line.
Parks and Recreation Division October 2, 2012 IMPACT FEE FUND UPDATE.
New Brighton Planning Commission Meeting April 18, 2006 Public Hearing: Zoning Ordinance Amendment: Section Regarding Commercial/Industrial Park.
Site # Lake In The Hills Site 65 +/- Acres 900 Woodlands Parkway Vernon Hills, Illinois Office; Fax: Cell:
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
A PRESENTATION BY THE DISTRICT 1 COMMUITY COUNCIL SIDEWALK TO BATTLE CREEK REC.
Union Park District Council Ayd Mill Road Task Force St. Paul Capital Improvement Budget Proposal
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Welcome!. OVERVIEW Limited access reconstruction/relocation of US 31 from US 30 to US 20. The project area includes the communities of LaPaz and Lakeville,
D Board of Aldermen Retreat May 19, 2012 City of Wentzville Transportation Program & Street Budget Update Scott J. Smith, P.E., Director of Public Works.
Florida Gas Transmission 16-Inch Section#1 Hydrostatic Test 16-Inch Saint Petersburg Lateral Pipeline From Polk City to Lakeland Polk County.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Med City Marathon of 11 Start Line
Arizona Forward Update
Norman CTP Subcommittee Meeting #3 - Needs and Projects March 25, 2013
Thoroughfare Plan Update
City of New Braunfels Regional Transportation Planning Garry Ford, P.E., PTOE City Engineer June 13, 2017.
The Gainesville Area Chamber Infrastructure Investment Initiative
Jefferson County SA Red Rocks Site Approval
I-15 North Phase 4 Scoping & Project Management Assistance
City Council Meeting November 7, 2016
Will’s Trace Subdivision
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Regional Roads Committee
City of Johnston East of Merle Hay Road Infrastructure Improvements
City Council Work Session July 5, 2017.
Center City Connector 101.
CRAZY BIRD PELICAN RIDE
Infrastructure Investment Needs
Florida Gas Transmission Mainline Hydrostatic Test
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Adoption of the FY Capital Improvement Program Budget & Amendments to FY 17 CIP May 8, 2017.
I-5/SR 18/SR 161 Interchange Interchange Improvements Hung Huynh
Florida Gas Transmission Mainline Hydrostatic Test
STREETS & STORMWATER DEPARTMENT
Kerr Tar Project Update – June 2016
Grey County Transportation Master Plan
Florida Gas Transmission 16-Inch Section#1 Hydrostatic Test
Roswell CITY COUNCIL MEETING
Presented by BikeOCNJ bikeocnj.org August 22, 2018
Highway 169 Bridge Replacement & Pavement Resurfacing
SANDY SPRINGS CITY COUNCIL MEETING
Transportation CIP Update
Solid Waste Enterprise Fund: Wildlife Resistant Containers
Presented by Mrs. Estes’s 4th Grade Class of
Tam O’Shanter Rezoning
Downtown Valdosta Truck Traffic Mitigation Study
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
PROJ. 566(17) LOR PID MAJOR WIDENING
Eden Prairie Miller Fields 8208 Eden Prairie Rd (4) Highway 212 to Eden Prairie Road Go North Fields are on the Left.
Construction Management & Engineering
Comprehensive Transportation Plan
Orange Grove Boulevard Complete Streets Project
Transportation Workshop
Protected Bicycle Lanes Finally Pedal Their Way to KC…
ST CURRENT & FUTURE SERVICE MAPS
Metropolitan District | mndot.gov
Broward County Congestion Assessment
“The Body” A Tiny Town Mystery.
Presentation transcript:

SPEED LIMIT ORDINANCE UPDATES Rory D. Grindley, P.E., PTOE County Traffic Engineer Pierce County Planning & Public Works (253)798-2275 or Rory.Grindley@piercecountywa.gov 8/1/2018 Pierce County Council

Summary Pierce County Planning and Public Works, Traffic Section, conducted an engineering and traffic investigation, which identified certain roads and reasonable and safe maximum speed limits that should be changed to reflect existing field conditions. 8/1/2018 Speed Limit Ordinance Updates

Summary (Cont.) Previous Speed Limit Ordinances • Ord. 2010-36 • Ord. 2004-79S • Ord. 2001-103 • Ord. 2000-5S • Ord. 99-13S • Ord. 95-137 • Ord. 94-78 • Ord. 89-152 • Ord. 87-72 • Ord. 85-144 8/1/2018 Speed Limit Ordinance Updates

Summary (Cont.) Technical Corrections Upgraded Arterials Speed Limit Changes School Zones 8/1/2018 Speed Limit Ordinance Updates

Technical Corrections 8/1/2018 Speed Limit Ordinance Updates

Technical Corrections Change in address area abbreviations on Key Peninsula, Fox Island, and Anderson Island per Ordinance 2017-85 City Annexations - Arterial Limits Changed Due to Annexation WSDOT Redefined Arterial Limits 8/1/2018 Speed Limit Ordinance Updates

Technical Corrections Change in address area abbreviations on Key Peninsula, Fox Island, and Anderson Island for compliance with Next Generation 911 standards per Ordinance 2017-85 KPN – changed to NW KPS – changed to SW AI – removed from street name FI – removed from street name 8/1/2018 Speed Limit Ordinance Updates

City Annexations Nine arterials have been fully annexed by the adjacent city 35 Miles Per Hour 70 Ave E – Fife City Limits to SR-99 (Fife) 134 Ave E – Pioneer Way E to 80 St E (Puyallup) Kelly Lake Rd E – Church Lake Rd E to 214 Ave E (Bonney Lake) Tacoma Mall Blvd S – 84 St S to 80 St S/Tacoma City Limits (Lakewood) 25 Miles Per Hour 44 St W – Alameda Ave W to 67 Ave W (Fircrest & University Place) 207 Ave E – 64 St E to Bonney Lake City Limits (Bonney Lake) Burnham Dr NW – SR-16 to Sehmel Dr NW (Gig Harbor) Church Lake Rd E – Bonney Lake City Limits to Kelly Lake Rd E (Bonney Lake) West Tapps Dr E – Bonney Lake City Limits to Church Lake Rd E (Bonney Lake) 8/1/2018 Speed Limit Ordinance Updates

City Annexations (Cont.) Nine arterials had limits changed due to annexation by adjacent cities 35 Miles Per Hour 80 St E – SR-162 to Puyallup City Limits 84 St E – 18 Ave E/85 St E to Puyallup City Limits 96 St E – 24 Ave E to Puyallup City Limits 234 Ave E – South Prairie Rd E to Bonney Lake City Limits Bujacich Rd NW – 22 5’ south of Sehmel Dr NW to Gig Harbor City Limits Burnham Dr NW – Gig Harbor City Limits to SR-302 Spur Sehmel Dr NW – 78 Ave NW to Gig Harbor City Limits Woodhill Dr NW – 70 Ave NW to Gig Harbor City Limits 25 Miles Per Hour 64 St E – 218 Ave E to Bonney Lake City Limits 8/1/2018 Speed Limit Ordinance Updates

WSDOT Redefined Arterial Limits Two arterials have been reconfigured requiring the description to be updated 40 Miles Per Hour Spanaway Loop Rd S – SR-704 to 121 St S Changed from SR-7 25 Miles Per Hour • 234 Ave Ct E – SR-410 to 234 Ave E New connector due to 234 Ave E realignment 8/1/2018 Speed Limit Ordinance Updates

The speed limit will remain 25 MPH. Upgraded Arterials 21 local roadways upgraded to collector arterials after approval of Road Class Ordinance 2015-23. The speed limit will remain 25 MPH. 8/1/2018 Speed Limit Ordinance Updates

Speed Limit Changes 16 arterial segments are proposed to have speed limits reduced and 23 arterial segments are proposed to have speed limits increased 8/1/2018 Speed Limit Ordinance Updates

Speed Limit Changes District 1 Crystal Mountain Blvd E – 3000’ south of MP 5.0 to MP 6.0 Proposing to decrease from 35 MPH to 20 MPH 128 St E/Tehaleh Blvd E (Future) – McCutcheon Rd E to Falling Water Blvd E Proposing a 40 MPH speed Falling Water Blvd E (Future Extension) – Rhodes Lake Rd E to Cascadia Blvd Proposing a 35 MPH speed 180 St E (Future) – 122 Ave E to 184 St E 184 St E – 122 Ave E to 180 St E Proposing to increase from 25 MPH to 35 MPH 198 Ave E – Rhodes Lake Rd E to 120 St E 8/1/2018 Speed Limit Ordinance Updates

Speed Limit Changes – cont. District 1 – cont. 254 Ave E – SR-410 to 112 St E Proposing to increase from 25 MPH to 35 MPH Barkubein Rd E (Future) – Connells Prairie Rd E to Radke Rd E Radke Rd E (Future) – Barkubein Rd E to 230 Ave E/Buckley Tapps Hwy E Berkeley Pkwy E (Future) – 176 Ave E to Tehaleh Blvd E Proposing a 25 MPH speed Forest Park Blvd E – Cascadia Blvd E to Village Pkwy E Proposing to increase from 25 MPH to 30 MPH 8/1/2018 Speed Limit Ordinance Updates

Speed Limit Changes – cont. District 1 & 2 94 Ave E – 136 St E to 116 St E Proposing to increase from 35 MPH to 40 MPH District 2 74 St E – SR-162 to Riverside Dr E Proposing to decrease from 35 MPH to 30 MPH Riverside Dr E – 74 St E to 154 Ave Ct E Lakeland Hills Way E – Auburn City Limits to Forest Canyon Rd E (Future) Proposing a 30 MPH speed 8/1/2018 Speed Limit Ordinance Updates

Speed Limit Changes – cont. District 3 8 Ave E – South Fork Muck Creek Bridge (#34183-A) to 260 St E Proposing to decrease from 45 MPH to 35 MPH 168 St S – SR-7 to A St S Proposing to decrease from 35 MPH to 30 MPH 168 St E – A St S to 22 Ave E 176 St E – 50 Ave E to 51 Ave E Proposing to decrease from 45 MPH to 40 MPH 38 Ave E (Future Extension) – 200 St E to 208 St E Proposing a 35 MPH speed 50 Ave E (Future) – 176 St E to 180 St E 8/1/2018 Speed Limit Ordinance Updates

Speed Limit Changes – cont. District 3 – cont. 62 Ave E – 224 St E to 212 St E Proposing to increase from 25 MPH to 35 MPH 86 Ave E – 232 St E to 236 St Ct E Proposing to increase from 25 MPH to 30 MPH 192 St E – 86 Ave E to 92 Ave E (Future) 176 St E –51 Ave E to 1,525’ east of Canyon Rd E Proposing to increase from 35 MPH to 40 MPH 184 St E – 78 Ave E to 86 Ave E 8/1/2018 Speed Limit Ordinance Updates

Speed Limit Changes – cont. District 4 66 St W – Lakewood Dr W to Tacoma City Limits Proposing to decrease from 35 MPH to 30 MPH District 5 99 St E – 16 Ave E to 20 Ave E Proposing to decrease from 35 MPH to 25 MPH 99 St E – 20 Ave E to 24 Ave E 136 St E – Canyon Rd E to 62 Ave E 136 St E –62 Ave E to Woodland Ave E Proposing to increase from 25 MPH to 30 MPH 8/1/2018 Speed Limit Ordinance Updates

Speed Limit Changes – cont. District 6 138 St S – SR-7 to C St S Proposing to decrease from 35 MPH to 25 MPH Park Ave S – 125 St S to 121 St S Proposing to decrease from 30 MPH to 25 MPH Spanaway Loop Rd S – 119 St S to 121 St S Proposing to decrease from 40 MPH to 35 MPH C St S – 112 St S to 121 St S Proposing to increase from 25 MPH to 30 MPH 8/1/2018 Speed Limit Ordinance Updates

Speed Limit Changes – cont. District 7 Key Peninsula Hwy NW – 1000’ s/o Cramer Rd NW/Olson Dr NW to 1600’ s/o Cramer Rd NW/Olson Dr NW Proposing to decrease from 45 MPH to 35 MPH Moller Dr NW – Hallstrom Dr NW to Drummond Dr NW Proposing to decrease from 35 MPH to 30 MPH 26 Ave NW – 0.4 miles s/o Stone Dr NW to 0.54 miles s/o Stone Dr NW Proposing to increase from 25 MPH to 35 MPH Key Peninsula Hwy SW – 40 St SW to 46 St SW Proposing to increase from 35 MPH to 45 MPH 8/1/2018 Speed Limit Ordinance Updates

Four arterials are proposed to have School Zones Four arterials are proposed to have 20 MPH school speed zones 8/1/2018 Speed Limit Ordinance Updates

School Zones – District 5 52 St E – 1000’ to 1600’ east of Pioneer Way E 8/1/2018 Speed Limit Ordinance Updates

School Zones – District 7 56 St NW – Kopachuck Dr NW to 775’ east of Kopachuck Dr NW Kopachuck Dr NW – 56 St NW to 770’ north of 56 St NW 8/1/2018 Speed Limit Ordinance Updates

School Zones – District 7 Hall Rd NW – 525’ east of Van Slyke Rd NW to 1710’ west of Wright Bliss Rd NW 8/1/2018 Speed Limit Ordinance Updates

Follow-up EDIC Meeting 7-24-18 8/1/2018 Speed Limit Ordinance Updates

QUESTIONS? Rory D. Grindley, P.E., PTOE (253)798-2275 or Rory.Grindley@piercecountywa.gov 8/1/2018 Speed Limit Ordinance Updates