ELENA beam commissioning

Slides:



Advertisements
Similar presentations
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
Proton beams for the East Area The beams and their slow extraction By : Rende Steerenberg PS/OP.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Diagnostics for intense e-cooled ion beams by Vsevolod Kamerdzhiev Forschungszentrum Jülich, IKP, COSY ICFA-HB2004, Bensheim, October 19, 2004.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
1 EMMA Tracking Studies Shinji Machida ASTeC/CCLRC/RAL 4 January, ffag/machida_ ppt & pdf.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
Slide 1 Overview Introduction Stochastic Cooling History of the Antiproton machines at CERN The AD and ELENA Conclusion.
Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
ELENA installation progress F. Butin / ELENA collaboration.
Beam test of slow extraction from the ESR
Parameters of ejected beam
Nonscaling FFAG design and EMMA experiment
Jim Crittenden CHESS Simulation Working Group 30 March 2015
Overview of Extra Low ENergy Antiproton ring (ELENA) and TE-EPC contribution to the project TE-EPC Group Meeting Michal Dudek 25th June 2015.
ELENA installation and commissioning status
Installations up to Start of Commissioning
Alternative/complementary Possibilities
The LHC - Status Is COLD Is almost fully commissioned
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
-9:00: Test IP transverse adjustment (CMS) and optics verification.
TMCI Observations in AD
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Coupling Correction at the Australian Synchrotron
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
ELENA Extra Low ENergy Antiproton Ring
Advanced Research Electron Accelerator Laboratory
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Beam dynamics requirements after LS2
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
(Beam) Commissioning Plan
LHC - Week 38 Technical stop: Katy Foraz
PSB magnetic cycle 900 ms MeV to 2 GeV
Electron Cooling in ELENA - observations and plans
Feedbacks & Stabilization Getting them going
Some Thoughts on the JLEIC Ion Injector
Plans for future electron cooling needs PS BD/AC
Updated MEIC Ion Beam Formation Scheme
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

ELENA beam commissioning Planning and Results 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

ELENA initial planning… 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

The Commissioning Plan, Scenario 2 1. 14:th November – 20:th December 2016, midFebruary – March 2017, (possibly also part of January 2017) 100 keV H- @ 1 Hz, ring in normal polarity & normal direction: Finalise set up of xfer line from source: need BTV:s, BPM First injections & circulating beam: need ring BPM:s, tune msmnt, Schottky system Orbit/coupling: validation of systems, corrections, need RF Tunes: validation of system, corrections Chromaticity: validation of system, RF needed Acceptance check/studies: need scraper & beam blow-up systems Lifetime/blow-up rates, need intensity measurement (Schottky analysis) (Lattice validation with orbit response msmnts) (check alignment of e-cooler solenoids with orbit correction program, study effects of e-cooler solenoids on optics) Acceleration: tests & ramp corrections: further RF setup needed incl. B-train Repeat validations and corrections at intermediate & top plateau 100 keV protons @ 1 Hz, ring in normal or reversed polarity (both beam directions) could be used if needed 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

ECC - ELENA beam commissioning review T.Eriksson The Plan 2. May 2017 (timing also depends on commissioning progress) Installation & tests of e-cooler Vacuum bakeout of sector 40 Installation of LNE50 (Gbar) line ? (readiness of SEM:s & magnetic pick-up?) LNI/LNE SEM & magnetic pick-up installation  3. From June 2017 100 keV H- @ 1 Hz, ring in normal polarity & normal direction: Set-up e-cooler If H- lifetime is too short: use protons, ring in reverse polarity & normal direction, additional corrections might be necessary later for pbar operation due to remanence effects Recombination detection (protons), additional tool for alignment/tuning Extensive use of scraper system for profile and emittance msmnts Schottky analysis for long. Emittances Check solenoid alignment with orbit correction program, cooling time studies Lifetime/blow-up rates 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

ECC - ELENA beam commissioning review T.Eriksson The Plan 4. From June 2017 100 keV protons or H- @ 1 Hz, ring in reverse or normal polarity & normal direction: Initial setting-up of the extraction and ejection lines (only short sections installed at this stage for main and GBAR lines) Need u-wire monitors + high sensitivity intensity msmnt pickup in lines 5. From June 2017 5.3 MeV pbars @ .01 Hz, ring in normal polarity & normal direction: Set-up transfer line from AD: need BTV, GEM, TFA7049, BPM. (optics validation) RF synchro s-u for bunch to bucket transfer Deceleration (mirror acceleration cycle): Ramp studies: orbits, tunes, slope Further e-cooler set-up & optimisation Set-up of nominal cycle; obtain nominal emittances Bunched beam cooling @ extraction Set up extraction for Gbar operation 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

ECC - ELENA beam commissioning review T.Eriksson The Plan 6. From July 2017 until end of 2018 Pbar operation for Gbar Further studies with Ions & Pbars Space charge studies on higher intensity bunches (extraction on lower harmonics); compatibility with ejection lines Deceleration efficiency > 60% ? Synthetic B-train, validation for use in regular operation 7. LS2 – first half? (assuming ELENA performance is satisfactory) Installation of low-energy beam lines to experiments Commissioning with 100 keV Ions (Pbar set-up when available in 2021) 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

ECC - ELENA beam commissioning review T.Eriksson The Reality….. Nov. 2016: H- source operating at 100 keV, ELENA ready for first tests First H- injected 16/11 and “threaded” around ELENA, circulating beam (a few hundred turns) a few days later Only LNR.BTV118 (between septum and kicker) and ring BPM:s via OASIS used 25/11 H- source isolation transformer breakdown => end of run 2016 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

ECC - ELENA beam commissioning review T.Eriksson The Reality….. H- source back up in March 2017. It was decided to run at 85 keV to minimise the risks of further breakdowns. Some main activities/milestones in 2017: March: 1:st SEM tests using 16 OASIS channels = 2 monitors for H- => improved xfer and H- lifetime (0.5s) As of March, sometimes temporary instrumentation solutions while getting systems ready: 1:st tune measurements using bpm delta signal and OASIS FFT (strong coherent oscillations at injection) Synchrotron frequency measurements using radial position and OASIS FFT Work on Scraper beam profile measurements Orbit system: first measured YASP orbits 30/5 Set-up and tuning of many systems, RF, B-train, BBQ,…, Trying to improve/better understand Source stability problems, H- transfer line, lifetime etc. etc. 3 Pbar shifts/week interleaved with Ion commissioning as of June 2017 7 June: 1:st 5.3 MeV Pbar tests, 2 BTV:s available for AD-ELENA xfer 23/6: Pbars seen on LNR.BTV118 2/8 First Pbars circulating in ELENA Faster progress towards the end of the year – see following slides 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

First Pbars in ELENA ELENA supercycle with Pbar and Ion cycles - Pbars transferred through beam line and seen on BTV118 23 June….with missing bpm:s, only the 2 BTV:s available. 2 August 2017: AD – ELENA cycle synchro and handshake debugged & operational RF/timing clocktrains installed & debugged After minimal correction of H/V trajectories in transfer line Small correction of ELENA main B field => first Pbars circulating in ELENA! First few turns observed on bpm:s Envelope over 2 ms 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

ECC - ELENA beam commissioning review T.Eriksson Pbar progress Sept.-17 25/9: Significant RF progress with Pbars; beam decelerated with good efficiency down to the 35 MeV/c plateau and well into the following ramp using both radial and  phase loops after optimisation of the phase loop correction. Aperture was also measured at 100 MeV/c using radial steering, beam survives to +20 and to -5 mm offsets. 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

ECC - ELENA beam commissioning review T.Eriksson H- progress Sept./Oct. -17 Good intensity and well-focused beam on BTV118. Much shorter and intense circulating bunches could be observed after bunch to bucket transfer of H- was established. The radial and beam phase loops could not be closed as both the LPU and bpm signals seemed too weak/noisy. A different bpm is now connected (as LPU) which should see less “pollution” of the H-beam. 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

H- circulating beam profiles Sept./Oct. -17 First nice H- beam profiles have now been observed but there are still timing issues to be sorted out before we can see position (and emittance estimation) instead of time on the x-axis. 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

ECC - ELENA beam commissioning review T.Eriksson End of 2017: H- Ion source stability/reliability improved – often simple start-up and circulating beam Orbit corrections and kick response measurements work with only 2E6 H- but still not understood polarity/sign convention issue Influence on beam position on BTV118 by overhead crane observed BBQ tune measurements tested with beam excitation, looks promising! => Gbar extraction tested, fast deflectors commissioned, beam seen on first SEM. Issues with readout not understood… Lifetime estimations => in the second(s) range RF: phase and radial loop set-up & Source clocked with RF-train => cleaner transfer, better lifetime ! Pbars Bunch to bucket RF LL set-up and operational BBQ tunes, clean H and V signals (with excitation) at injection plateau + part of ramp After initial QFND scan (some) beam makes it down to (almost) 100 keV ! 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

The Reality…..continued in 2018 ELENA start-up end April – now equipped with electron cooler! 3 Pbar shifts/week planned until 27/7, this was later extended to the end of the run with Gbar often taking beam in parallel 2018: a bad year for AD, only 65% machine availability, affected physics as well as ELENA… H- source at 100 keV until end of May, then at 85 keV after breakdown, down again 21/9 =>… More debugging/set-up of: YASP orbits and corrections, LSA incorporation rules etc. Kick response measurements to identify bpm or polarity issues BBQ tune measurements throughout the cycle Transverse beam profiles from scraper measurements Injection coherent oscillations correction program – extensive use throughout the run Setting up of Pbar (and H-) cycles - Much work on: Tune settings throughout the cycle, many working points tested to try to reduce losses Further set-up of RF - additional features, tuning, debugging etc. Injection line quad scans (only 2 monitors) 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

Injection line SEM, first beam profiles observed! 13/6/2018: Pbars 18/6/2018: H- 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

Pbars: 22/5/18 - First beam observed at 100 keV ! After tune corrections throughout the cycle a small amount of Pbars remain at 100 keV This without beam cooling… 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

2/7/2018: First signs of effect of e-cooler Set-up & conditioning with electrons started 29/5 (interleaved with H- operation in ELENA) Set-up and compensation of ring orbit & coupling due to solenoid, toroid and fringe fields Set-up of cooler parameters & orbit bumps Clear signs of dp/p cooling seen on 4/7 …and later on, transverse cooling at both energies can be seen with scraper measurements 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

ECC - ELENA beam commissioning review T.Eriksson H- cycle set-up Sept.18 Set-up of a complete cycle with: Injection at 85 keV Acceleration to 100 keV Acceleration to 5.3 MeV Deceleration to 100 keV H- operation compromised due to periods with unstable beam position and several breakdowns of the Ion source (Mainly HV isolation transformer) 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

Gbar beam transfer, on the rota as of 30/7 H- extracted as of June/July 1:st Pbars extracted on 20/7 after set-up of ejection synchro. Some “Normal” Gbar shifts with Pbars starting in August with low intensity (no cooling at 100) Gbar staff often present in ACR towards the end of the run to profit from any beam extracted… Transverse profiles measured with SEM detectors in the GBAR line 1:st Pbar beam observed at entrance of Gbar decelerator 20/7 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

Pbar cycle at end of run – towards a nominal deceleration cycle Good deceleration efficiency, beam survival at 100keV and transfer to Gbar was finally obtained during the last week of operation in 2018 after: Further tuning of working point(s) Further optimisation of RF parameters Deceleration on lowest ramp on h=4 instead of h=1 Bunched beam cooling at 100 keV Bunch rotation before extraction Etc. etc. etc. Deceleration cycle: Pbars from AD injected at 100 MeV/c Deceleration to 35 MeV/c on h=1 Electron cooling at 35 MeV/c Deceleration to 13,7 MeV/c on h=4 Electron cooling at 13,7 MeV/c Re-bunching for extraction on h=4 ~45% of injected beam extracted (transfer efficiency AD to ELENA unknown) 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

ECC - ELENA beam commissioning review T.Eriksson Goals & Achievements Obtained 1/11/2018: Decent deceleration efficiency (60% in design report)  Good enough lifetime at 13.7 MeV/c  Efficient cooling at both plateaus  Acceptable emittances, lifetime & blow-up  with bunched beam prior to extraction Beam transfers to Gbar  Stability & reproducibility  07/03/2019 ECC - ELENA beam commissioning review T.Eriksson

ECC - ELENA beam commissioning review T.Eriksson Conclusion For beam commissioning, the Ion source was used less than expected while Pbars were used much more Progress was very slow at the beginning and quite fast towards end of 2017 and 2018 Beam was sent to Gbar experiment more or less as planned – good progress on their side ELENA design specs almost achieved But…..much work remains on tuning/improving ELENA performance and installation & commissioning of the new transfer lines 07/03/2019 ECC - ELENA beam commissioning review T.Eriksson