THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)

Slides:



Advertisements
Similar presentations
Public/Private Partnerships for Water & Wastewater Systems 2006 ACMA Summer Conference Loews Ventana Canyon Resort Tucson, Arizona.
Advertisements

The Idaho Department of Environmental Quality Mark Mason, P.E., Engineering Manager Idaho DEQ - Boise Regional Office 1445 North Orchard Boise, ID
U.S. Pretrial Services and Probation Office Northern District of Ohio.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Harris County Pollution Control Services Department Enforcement of Bacteria Requirements in Wastewater.
Presented by Lynley Doyen, Water Program Liaison Field Operations Support Division Water Quality Advisory Work Group January 25, 2011 Austin, Texas.
25th Annual U.S. EPA Region VI Pretreatment Association Workshop Liquid Waste Transporter Enforcement Stories August 5, 2009 Ms. Erin La Rue Pretreatment.
What is it and what can it do for me?
Title V Site Operating Permits (SOPs)
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
After the Sanitary Survey
SSES and GIS, A Great Partnership Cindy Fort, PE Technical Director Environmental Engineering and Jeff McCann GIS Coordinator.
Enforcement Overview Melissa Cordell, P.G. Enforcement Division Office of Compliance and Enforcement Texas Commission on Environmental Quality Environmental.
Rules Overview: Why Do We Do What We Do Alisa Max, P.E. Harris County Alisa Max, P.E. Harris County.
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
Rapid Assessment Process Project Strategic Plan City of Marfa Water and Wastewater System Improvements Marfa, Texas Presented to: Stakeholders and Project.
MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1.
MEDICAL WASTE MANAGEMENT REGULATIONS FOR THE HANDLING, TREATMENT & PROPER DISPOSAL OF MEDICAL WASTE, INCLUDING EBOLA WASTE Daniela Ortiz de Montellano.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
Permit Process & Application Guide
Enforcement Overview Melissa Cordell, P.G. Enforcement Division Office of Compliance and Enforcement Texas Commission on Environmental Quality Environmental.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
An Introduction to the Voluntary Cleanup Program Texas Commission on Environmental Quality Environmental Trade Fair & Conference May 3, 2016 Gene Muller,
Texas Commission on Environmental Quality. SUBCHAPTER A GENERAL PROVISIONS SUBCHAPTER B GENERAL REQUIREMENTS FOR THE PRODUCTION, CONVEYANCE, AND USE OF.
HB 2031 and HB 4097: Marine Seawater Desalination Rulemaking Trade Fair / May 2016 Office of Water Water Availability Division Water Quality Division.
Texas Commission on Environmental Quality
Oil & Gas Waste Stream Management and Permitting Options
Recycled Water Project Basis of Design Report
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
e-Application Occupational Licensing Electronic License Application
Implementing HB 2793 Main Page
David Kurz, P.E. Lead Wastewater Engineer
NetDMR.
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
Biosolids Public Workshop March 22, 2016
New Licensing and Renewal Requirements
Criminal History Background Checks for all TCEQ Licenses
2017 Environmental Trade Fair Shannon Gibson
Class I Injection Well Application Issues
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
Water Department has Six Divisions
Industrial and Hazardous Waste Easier, Better, Faster Permitting
TCEQ, Occupational Licensing Wastewater Licensing Overview
Jesse Boultinghouse Waste Permits Division TCEQ Trade Fair May 3, 2016
The Legal and Practical Requirements
Annual Inspections of First Nation Water and Wastewater Facilities
Sludge Removal Requirements
TCEQ Environmental Trade Fair Austin Convention Center May 3, 2016
The Islamic University of Gaza- Civil Engineering Department
NetDMR.
Wastewater Permitting Updates
Radioactive Materials Section Update
2018 Environmental Trade Fair Shannon Gibson
Criminal History Background Checks for all TCEQ Licenses
Use of Domestic Reclaimed Water
Alexander Hinz & Kasy Stinson Water Supply Division
TCEQ Environmental Trade Fair Water Quality Division
Chapter 312 Rule Revisions
Annual Enforcement Report Overview
Regional Solid Waste Grants Program
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
Capital Improvement Plan April 9, 2018 Status Update
PUBLIC WATER SYSTEM PLAN and EXCEPTION REVIEW
TOOLS FOR HIGH QUALITY APPLICATIONS (AKA “Streamlining”)
Kasy Stinson Water Supply Division
USES OF DOMESTIC RECLAIMED WATER
Occupational Licensing Requirements
2019 Environmental Trade Fair & Conference Monica Vallin-Baez
Wastewater Permitting Updates
Presentation transcript:

THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217) 2019 TCEQ ENVIRONMENTAL TRADE FAIR & CONFERENCE May 14, 2019 TCEQ TRADE FAIR 2015 MAY 5, 2015 Louis C. Herrin, III, P.E. Engineer, Water Quality Division 512-239-4552 louis.herrin@tceq.texas.gov Louis C. Herrin, III, P.E. Engineer, Water Quality Division 512-239-4552 louis.herrin@tceq.texas.gov

OVERVIEW Current Chapter 217 History Summary Transmittal Letters Call in

Current chapter 217 Subchapter A Subchapter B Subchapter C Administrative Requirements Subchapter A Treatment Facility Design Requirements Subchapter B Conventional Collection Systems Subchapter C Alternative Collection Systems Subchapter D Preliminary Treatment Units Subchapter E Activated Sludge Systems Subchapter F Fixed Film and Filtration Units Subchapter G Natural Treatment Facilities Subchapter H Sludge Treatment Units Subchapter J Chemical Disinfection Subchapter K UV Light Disinfection Subchapter L Safety Subchapter M Subchapter A Administrative Requirements Subchapter B Treatment Facility Design Requirements Subchapter C Conventional Collection Systems Subchapter D Alternative Collection Systems Subchapter E Preliminary Treatment Units Subchapter F Activated Sludge Systems Subchapter G Fixed Film and Filtration Units Subchapter H Natural Treatment Facilities Subchapter J Sludge Treatment Units Subchapter K Chemical Disinfection Subchapter L UV Light Disinfection Subchapter M Safety

History of MAJOR CHANGES OF the Wastewater Treatment Design Criteria in Texas The first consolidated design criteria was adopted by Texas State Department of Health on 9/18/1950. This document was revised on 9/11/1961, 9/18/1968, 9/13/1970, 9/1/1974, 6/1/1981, 4/20/1990, 8/28/2008, 12/4/2015 The first consolidated design criteria was adopted by Texas State Department of Health on 9/18/1950. This document was revised on 9/11/1961, 9/18/1968, 9/13/1970, 9/1/1974, 6/1/1981, 4/20/1990, 8/28/2008, 12/4/2015

chapter 217 Check the status of your summary transmittal letter. http://www18.tceq.texas.gov/wwps A picture is the web page box that you can check the status of your project.

CHAPTER 217 Identifying Information TCEQ Log No.: 0314/034 Engineer: XXXXXXX. (License No. XXXXX) Applicant: CITY OF JOHNSON CITY Permit No.: 10198-001 Applicant’s Project or Grant No. (if any):   Status of Review of Plans and Specifications Cover Letter Dated: 03/12/14 Received by TCEQ: 03/12/14 Final Action Date: 03/13/14 Final Action: APPROVED Chapter 217 Identifying Information TCEQ Log No.: 0314/034 Engineer: XXXXXXX. (License No. XXXXX) Applicant: CITY OF JOHNSON CITY Permit No.: 10198-001 Applicant’s Project or Grant No. (if any):   Status of Review of Plans and Specifications Cover Letter Dated: 03/12/14 Received by TCEQ: 03/12/14 Final Action Date: 03/13/14 Final Action: APPROVED

SUMMARY TRANSMITTAL LETTER Copy of the first page of the summary letter.

SUMMARY TRANSMITTAL LETTER Copy of the second page of the summary letter.

Missing Compliance Statement Wrong Permittee Name COMMON MISTAKES Missing P.E. Seal Missing Firm No. Missing Permit No. Missing Compliance Statement Wrong Permittee Name Common Mistakes on Transmittal Letter Missing P.E. Seal Missing Firm No. Missing Permit No. Missing Compliance Statement Wrong Permittee Name

Variances What is the technical justification for the variance requested? Variances What is the technical justification for the variance requested?

Common Variances Vacuum Testing of Manholes Manhole Spacing Venting of Collection System Separation Distances Common Variances Vacuum Testing of Manholes Manhole Spacing Venting of Collection System Separation Distances

Project Description Short narrative of the project that include: Treatment units with based sizing The length and size of collection system Number of manholes General information on lift station Effluent Limitations Project Description

What Types of Projects Get Call-in? Innovative or Nonconforming Technologies Pressure or Vacuum Sewer Systems Nutrient Removal Limitations Enforcement Actions SBR or MBR WWTP Rerate Poor Project Descriptions

Prohibitions Bending Collection System or Force Main Pipe Hopper Bottom Clarifier greater than 10,000 gpd Ladder or Steps in Manholes Several on the Chemical Disinfections

QUESTIONS? A background picture of a Question Mark?