【Schedule】 Multi-screen LCD display systems – Part 1 & 2

Slides:



Advertisements
Similar presentations
Reporting Status or Progress. Define the Subject n Break the subject into areas of discussion n List the main subject components here.
Advertisements

LED Panel 28 th February 2008 LED Standardisation Lawrence Barling Senior Technical Manager The Lighting Association.
Introduction to Integrated Library Systems
Report from MT01 Peter Hauge Madsen Convenor MT01.
Standards. Historically In the past –Proprietary single source components (IBM Token Ring: Single Source Components) –Applications driven (Data Comm’s.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
IEC TC 88 PT IEC Ed.1: Wind Turbines – Part 5: Rotor Blades
Digital Images Chapter 8 Exploring the Digital Domain.
NANC Report Numbering Oversight Working Group (NOWG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Karen Riepenkroger, Sprint.
1 Beyond California Water Plan Update 2005 California Water and Environmental Modeling Forum Annual Meeting, March 3 rd, 2005.
Action Report of IEC/SEG1 System Evaluation Group on Smart Cities Berlin, 27-28, Feb IEC/SEG1 on Smart Cities1.
Global Relevance ANSI Conference on US Leadership Phoenix, AZ – Jack Sheldon Strategic Development Manager.
1 Technical & Business Writing (ENG-315) Muhammad Bilal Bashir UIIT, Rawalpindi.
Update September 14, 2011 Adrian Fletcher, Jacob Schreiver, Justin Clark, & Nathan Armentrout.
Submittal of C as an IEC/IEEE Dual Logo Document IEEE Switchgear Committee Main Committee Meeting 18 October 2007.
IEC TC 100 Oct Wireless Power Transfer – multiple sources control management H. Sakakihara 100/AGS501.
Budapest, Hungary 15/16 April 2015
SC 3D IEC CDD – Architecture 3DWG2/190D/INF.
Christer Eriksson 11 March 2010 JWG1 - Wind Turbine Gearboxes IEC/ISO Design Requirements for Wind Turbine Gearboxes.
The 11th CJK NGN-WG Meeting 1 11 th CJK NGN-WG (CJK NGN Test-bed Activity Report) CJK NGN Test-bed Ad-hoc Group.
TC 57 PSCE09 - CIM Status Update Panel Session Introduction Ed Dobrowolski, NERC.
(SRS) SOFTWARE REQUIREMENT SPECIFICATION(SRS) 1. Topics to be discussed.. What is an SRS? Purpose of an SRS Who reads the SRS? Who writes the SRS? Characteristics.
Report to the IEC TC100 AGS on Stage 0 Project on Accessibility May 20, 2009 Washington, DC (at the Consumer Electronics Association in Crystal City, Virginia)
CISPR/TC77 Joint Task Force Activity Update ACEC meeting in Paris, June 2006 Prepared by Donald N. Heirman Chairman CISPR Subcommittee A.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
AMENDMENTS TO CDRH LASER STANDARD. TEPRSSC ‘99 Revisited. Presentation Summary. Discussion Summary.
New Revised Specification In Construction For 1st teaching September 2009 For moderation 2011.
Progress report of TFG 7 “Fire resistance test” Mar. 3rd, 2016 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute.
“Hydrogen detection apparatus” Dr. Ichiro Matsubara, convener
In-session workshop on safety standards Vienna, 19 July 2016 Page 1 /13.
IEC Approaching the Finishing Line
Proposal for developing TR: Conceptual model for TC 100 robotics
Consultation with CE manufacturers re new DTV technologies
Energy Rating Standards (IEC61853) – Standards Body Perspective -
A Simulation Framework For Storage System Proposal
Jack Sheldon Strategic Development Manager
ISO TC 108 SC3 Liaison to CCAUV
Informal document No. 9 (50th GRE, 7-11 April 2003, agenda item 3.2.)
Scott MacLeod UL LLC TC 111 US NC
International Ballooning Commission
IMTC Telepresence AG Overview
UHD Terminology Analysis & Suggestions
IEC Activities affecting HSSC Hannu Peiponen Chair of IEC TC80
Corporate Uniform To Enhance Uniform Your Business Image?
Frances Cleveland Convenor WG15
JASIC Japan ______ 61st GRSP Session May 2017
TC3 Workshop Montreal, Canada –
Technical Committee 3 INFORMATION STRUCTURES, DOCUMENTATION AND GRAPHICAL SYMBOLS.
ServiceLink Training Video Scheduling Service Gaps
TC Process Specification Flow
Progress Report on proposed GUID on Information System Security Audit
Report from IEC/TC 117 Solar thermal electric plants
Rear direction indicator lamp and stop lamp separation
SMPTE D-Cinema (21DC) Status Report IEC TC 100 AGS Berlin meeting
Chapter 15 Technical Descriptions
Emulsion Task Force (ETF) Meeting
Standardization Management Board Decisions How They Affect Your TAG!
Developing Standards and Linkage to IECEx
TCU-PROJECT: 7TH Semester Course
DBIA Manual of Practice
Signal Conditioning.
Wrap up of agenda item no. 3
PSS verification and validation
Informal document GRE-81-14
Informal document GRE Rev.1
Gender Training Workshop Name of Institution Place Date
Introduction to Computers
Presented to the CEOS WGISS October 10, 2019
JPNC modified comments for cl.24.2 and 21.10x
Presentation transcript:

【Schedule】 Multi-screen LCD display systems – Part 1 & 2 IEC TC100 CHINA NC

Background Multi-screen LCD display systems– Part 1: Conceptual model -. This document specifies a conceptual model of multi-screen LCD display systems. This document defines typical functional components to compose multi-screen LCD systems and describes the system structure and signal flow. The document also clarifies signal processing in the system to create multi-screen images from a single video signal input. Multi-screen LCD display systems– Part 2: Measuring methods -. This document specifies measuring methods of multi-screen LCD display systems. To evaluate the characteristics of multi-screen display systems, The following measurement items are specified: * Gap( physical, optical)--- Detail splicing precision; * Image dislocation—Picture display accuracy of Multiscreen LCD display system; * Installation tolerance---The flatness of terminal in surface and vertical direction; * Brightness uniformity--- Adjacent units brightness uniformity * etc

Schedule Completed : Plan : Proposal @Italy meeting Working draft @Belarus meeting Progress report @Austria meeting Progress report @Germany meeting 2015.04 2015.10 2016.05 2016.09 PL finished the application materials CN NC submit to IEC TC100 Part-1 IS or TS review 2016.03 2016.08 2016.09 Plan : Circulation &Vote 1st CD 2nd CD 1st CVD 2nd CDV 1st FDIS 2nd FDIS IS 2016.12 2017.06 2017.12 2018.06 2018.12 2019.06 2019.12 2020.06

Thank you for your support Our Suggestions The conceptual model is as important as the measuring methods. It’s the basis of the whole series standards. So we recommend the part-1(Conceptual model)to be an IS. Thank you for your support