ICG-WIGOS, eigth session, Jan 2019

Slides:



Advertisements
Similar presentations
WMO WMO Integrated Global Observing System (WIGOS) CBS EXPERT TEAM ON AIRCRAFT-BASED OBSERVING SYSTEMS 1st Session (Geneva, September, 2013) Dr I.
Advertisements

World Meteorological Organization Working together in weather, climate and water Other Cross-Cutting Matters WMO Polar Activities and Global Cryosphere.
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
Activities of the RA V WG-INFR Ms Agnes Lane Bureau of Meteorology.
ICG-WIGOS-3 Status of the WIGOS Operational Information Resource (WIR) Etienne Charpentier (OBS/WIGOS/OSD) WMO; OBS.
Development and Implementation of the WIGOS Data Quality Monitoring System (WDQMS) Doc. 4.4 ICG-WIGOS Task Team on the Plan for the WIGOS Pre- operational.
WMO Moving from the WIGOS Framework towards the Pre-operational Phase A. Makarau President of RA I.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) STATUS OF IMPLEMENTATION (Dr S. Barrell, Chair, ICG-WIGOS) WMO; OBS.
WMO WIGOS in support of GFCS ICG-WIGOS-3 (Doc 5.4) February 2014, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr. L. P. Riishojgaard, WIGOS-PO.
WMO WIGOS Pre-operational Phase Regional & National Perspectives Tyrone W. SUTHERLAND (BCT, EC FP for WIGOS)
CGMS-42 EUM-WP-32.ppt, v1A, 19 May 2014 Coordination Group for Meteorological Satellites - CGMS Presented to CGMS-42 Working Group IV, agenda item WGIV/9.1.
© Crown copyright Met Office Report of the Chair Stuart Goldstraw, UK Met Office, Chair ET-SBO-1, July 2013.
Monitoring Tools Timo Pröscholdt WMO; DRA. Today  Report  Timeline  Outlook.
ICG-WIGOS-6 Report from the Commission for Basic Systems
WIGOS Pre-operational Phase
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
WIGOS IMPLEMENTATION LEAD BY WORKING GROUP ON INFRASTRUCTURE
The Plan, Status and First Results
Concept Proposal for RA-III Regional WIGOS Centre
WIGOS Data Quality Monitoring System (WDQMS)
In partnership with GCOS
1st Session of the Task Team on WIGOS Data Quality Monitoring System
ET-SBO Report to ICT-IOS-9
and Vol. A Timo Pröscholdt,
WIGOS Data Quality Monitoring System (WDQMS)
Snow Watch Team Terms of Reference
5th Session of the Task Team on WIGOS Metadata
Regional Basic Observing Network Concept
The Plan, Status and First Results
Sue Barrell, Bertrand Calpini
WMO Integrated Global Observing System (WIGOS) 16-RA VI Side Event Helsinki, Finland, 11 September 2013 Dr Miroslav Ondráš, Dr Wenjian Zhang (WMO) Dr.
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Regional WIGOS Centres
WIGOS Pre-operational Phase
WIGOS Pre-operational Phase
Roadmap to Enhanced Technical Regulations of WMO
Regional WIGOS Center in RA VI
Agenda item 2.3 Report of OPAG ISS Matteo dell’Acqua
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
4.2(2) WIGOS Editorial Board (WEdB)
WIGOS implementation in RA II
OSCAR/Surface (User Perspective)
Regional Basic Observing Network Concept
WMO WIGOS is an all-encompassing, holistic approach to the improvement and evolution of the present WMO global observing systems into … (the next slide)
Overview of the WMO Integrated Global Observing System (WIGOS)
Dr Sue Barrell, Australia
OSCAR/Surface, Vol. A, and the WMO Members
Decisions on CBS activities to support WMO priority activities
REPORT on RWCs in RA VI Ivan Čačić President RA VI ICG-WIGOS-7
OSCAR/Surface – and all you ever wanted to know about it
Co-chair Introduction
Decisions and Recommendations for the
the Commission for Basic Systems (CBS) perspective
Monitoring System (WDQMS)
Workshop (… 2016) WIGOS Project Office
Status and Plan of Regional WIGOS Center (West Asia) in
WMO RA-II WIGOS Workshop Workshop summary and recommendations
WIGOS Pre-Operational Phase;
Proposed functionalities of RWC
IPET-DD-1 meeting Feb 2019 Thorsten Busselberg -DWD
ET-WISC structure and work plan
The WIGOS Pre-Operational Phase
IPET-DD-1 meeting Feb 2019 Thorsten Busselberg -DWD
WIGOS - Regional and National Implementation Planning
COLLABORATION AND ENGAGEMENT WITH CROSS-CUTTING WMO PRIORITIES; WIGOS MAIN OBSERVING COMPONENTS GLOBAL CRYOSPHERE WATCH 25 Jan 2019 Árni Snorrason Chair,
Inter-Commission Coordination Group On WIGOS
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
Co-chair Introduction
OSCAR/Surface Functionality and Usability Assessment
Presentation transcript:

ICG-WIGOS, eigth session, 24-26 Jan 2019 Report of the Task Team on OSCAR Development ICG-WIGOS, eigth session, 24-26 Jan 2019 Simon Gilbert / Thinesh Sornalingam Co-chairs TT-OD

Today Main findings Revised and prioritized TORs Conclusions and recommendations Workplan for 2019

Main findings

Main findings TT-OD to act as User Representative Collaboration with TT-WMD and OSCAR Project Team needed Improve usability of OSCAR Interface with WIGOS data quality monitoring system

Main findings: TT-OD as User Rep. TT-OD to take the User Perspective in OSCAR Development Team TT-OD to get access to user feedback and contact OSCAR community to solicit feedback List key stakeholders and identify actual users to be repsresentative of these roles

Main findings: interfaces With TT-WMD: consider maintainability aspects when adding new features With OSCAR project Team: Share plans and major new features. TT-OD to be included in specification and testing of major new features, with a view of assessing usability aspects

Main findings: usability Metadata input Templates Create easy-to-use templates for specific communities (e.g GCW) Batch operations for common tasks (e.g Close station, change schedules, change contact) Statistics Metadata quality and completeness User behaviour

Main findings: WDQMS Develop interface to include reporting status, obtained by WDQMS Add qualitative and timeliness indicators later and through the same interface once the indicators are developed

Revised and prioritized TORs

Revised and prioritized TORs Item Priority (High: to be addressed in tranche 1 of the workplan; Medium: to be addressed in tranche 2 and Low: to be addressed in tranche 3 a) To review the functionalities of the OSCAR/Surface web interface and advise on possible improvements and their level of priority; MEDIUM  b) To coordinate closely with TT-WMD the implementation of the WMDS updates in the OSCAR/Surface,  HIGH c) To advise and coordinate  the evolution of OSCAR/Surface, prioritizing new major features and the integration of the various component observing systems; d) To advise on issues regarding integration and/or interoperability of the OSCAR/Surface with the WIGOS Data Quality Monitoring System (WDQMS); MEDIUM e) To coordinate with the ICG-WIGOS Task Team on WDQMS the exchange of information between WDQMS and OSCAR/Surface;

Revised and prioritized TORs (II) f) To promote and coordinate  the migration of the WMO catalogue of radiosondes into OSCAR/Surface; MEDIUM g) To liaise with the regional activities related to the operational uptake of OSCAR/Surface, in particular with the establishment of RWCs to support the management of WIGOS metadata; h) To coordinate and oversee the implementation of the Machine-to- Machine API for OSCAR/Surface; HIGH i) To oversee and support the development and provision of training on OSCAR/Surface; j) To develop the requirements for the OSCAR/Analysis module; LOW k) To coordinate and advise on the integration of the various OSCAR modules/databases, in collaboration with CBS/IPET-OSDE (responsible for OSCAR/Requirements) and CBS/ET-SAT (responsible for OSCAR/Space); l) To contribute to the revision and further development of guidance material related to the use of the various modules of OSCAR for the Guide to WIGOS; m) To investigate if and how an "open source OSCAR/Surface compatible package" could be made available for Members to be used at a national level.  n) To report to ICG-WIGOS on the progress made.

Main conclusions and recommendation

Key messages for TT-WMD Users must be included as key stakeholders when agreeing improvements to the Standard (TT-OD will be the proxy representing the users) Recommendations for easy to use templates for different stations/types OSCAR will be responsible for implementing the WMDS, so close liaison between the two teams (TT-WMD and TT-OD) is essential

Relevant recommendations/conclusions TT-OD to act as User representative. Explore ways to review concepts that particularly affect users before they are implemented. Possibly involve in UATs, too. Establish communication channel with OSCAR community (forum, webinar, survey). Share user feedback from training events, webinars and others with TT-OD. Identify key user types/roles to provide expert advice/review particular Use Cases

Relevant recommendations/conclusions Roles and responsibilities/Terms of Reference/WMO Governance of key OSCAR stakeholders (OSCAR NFP, WIGOS NFP, Network NFPs national and global, users representing external and/or international organizations) and current OSCAR user role editing capabilities should be reviewed New or improved features to be considered Apply selected changes (assign contacts, change schedules, close stations, run/save queries) in batch mode to defined groups of stations – ‘My Station List’ export all/selected features of a station Stripped down ‘quick start’ template to assist Members when creating stations of a particular type e.g. radiosonde, surface synoptic, etc More recommendations will be suggested for consideration from TT-OD in the future

Relevant recommendations/conclusions WDQMS interface should be developed in line with the following principles: exchange format to be defined to include information on availability, quality and timeliness (by station, variable and month, history to be kept by OSCAR) implement data analysis visualization step-by-step Explore how official WIGOS Guide/OSCAR User Manual can be kept consistent with documentation supporting the most current release of OSCAR API Provide guidance on correct usage to users (testing, pre-analysis, update status, verification of changes) Backup & restore functions

Workplan 2019

Task description Who is responsible Delivery date Status Link to Terms of Reference 1) Expand the User Profiles document to include the relevant Use Case Requirements Simon Gilbert   (a) 2) Draft templates for standard classes of metadata record in line with the WMDS to include manned surface synoptic, Automatic Weather Station, Radiosonde, GCW Karl Monnick, Lars-Peter Riijshogard (b) 3) Develop proposals for Usability and Functionality Assessments including definition of metrics. Propose methods to measure metrics through logfiles/analytics/queries Thinesh Sornalingam 4) User Outreach and analysis of Feedback. Propose improvements ? (i),(j) 5) Ensure that the OSCAR user manual within the Guide to WIGOS is aligned with the most up to date material available WMO Secretariat (Timo) (l) 6) Circulate report of TT-OD meeting to user community through forum and webinar Co-Chairs and Secretariat End of January 2019 (i) 7) Contribute to the specification of user requirements, acceptance of finalised developments etc. All members, specifically members of the user communities identified under Task 1. In line with OSCAR development team roadmap (c) 8) Work closely with TT WDQMS on data exchange between the WDQMS and OSCAR/Surface (e) 9) Provide guidance on correct usage of the M2M API to users (h)

Thank you www.wmo.int/wigos