FY18-19 EIC R&D FOA FY 2018 Research and Development for Next Generation Nuclear Physics Accelerator Facilities Web site: https://science.energy.gov/np/funding-opportunities/

Slides:



Advertisements
Similar presentations
Simulation Study For MEIC Electron Cooling He Zhang, Yuhong Zhang Thomas Jefferson National Accelerator Facility Abstract Electron cooling of the ion beams.
Advertisements

Nuclear Energy University Programs Review of the NEUP Program in 2011 Dr. Marsha Lambregts NEUP IO Program Manager.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
Agenda for Early Career Meeting 10/3/14
1 EIC Users Meeting, Stony Brook June 27, 2014 Request for these slides: Comment on “EIC working group activities at Jefferson Lab, and how people could.
2015 Technical Assistance Funding Workshop 1/23/15.
Technology Programme Autumn 2005 Autumn 2005 Competition The Application and Assessment Process Peter Miles TUVNEL Ltd.
Generic Detector R&D for an Electron Ion Collider RHIC & AGS Annual Users Meeting T. Ludlam, June 2011.
BROOKHAVEN SCIENCE ASSOCIATES Peter Bond Deputy Director for Science and Technology October 29, 2005 New Frontiers at RHIC Workshop.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
NATIONAL INSTITUTES OF HEALTH CHALLENGE GRANT APPLICATIONS Dan Hoyt Survey, Statistics, and Psychometrics(SSP) Core Facility March 11, 2009.
NOTES FROM INFORMATIONAL BRIEFINGS FOR POTENTIAL REGIONAL CENTER AND CONTENT CENTER APPLICANTS JUNE 19,20 & 22, 2012 Comprehensive Centers Program.
1 Access to the World and Its Languages LRC Technical Assistance Workshop (Part 1) Access to the World and Its Languages I N T E R.
2014 Technical Assistance Funding Workshop 1/28/14.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ERHIC design status V.Ptitsyn for the eRHIC design team.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Thomas Roser EIC AC meeting November 3-4, 2009 EIC Accelerator R&D Strategy and Programs Thomas Roser/Andrew Hutton BNL / Jefferson Lab R&D program is.
Jefferson Lab Overview Bob McKeown April 20, 2015.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
2016 DOE EPSCoR State Implementation Grants Program January 7, 2016 Contact : Richard Cristina.
Summary David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Fundamental aspects of muon beams submitted to Accelerator R&D panel for GARD funding consideration by J.P.Delahaye/SLAC & Robert D. Ryne/LBNL.
PRE-CONCEPTUAL DESIGN OF A CW POSITRON SOURCE FOR JLAB (2013-LDRD-02) JOE GRAMES LDRD PROPOSAL REVIEW - JULY 17, 2013 PROJECT OVERVIEW THE TEAM LDRD EVALUATION.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
WG2: Beam Dynamics, Optics and Instrumentation – Summary
DOE Accelerator Safety Workshop 2017 Bob Lowrie
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Short Contribution Title Goes Here
North Carolina Council on Developmental Disabilities
J. Alexander + Cornell accelerator group Cornell University
Beam-beam effects in eRHIC and MeRHIC
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
BNL ERL and frequency choices
JLEIC Collaboration Meeting Closeout considerations
R&D Topics for FOA Funding Proposals
JLEIC R&D Review: Other R&D
JLEIC R&D Overview NP EIC R&D Panel Review and Report
Open Science in the US and opportunities for Neutron and Light Sources
Tammy Custer Grant and Contract Officer
DOE Office of Science Graduate Student Research (SCGSR) Program
Introduction to Jefferson Lab
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Short Contribution Title Goes Here
Other issues and concepts under study Conclusions References
Expression of Interest for future flagship projects
Measurement Innovation Program
NSF Tribal College Workshop
Why is the CBETA Important for the Electron Ion Colliders?
MEIC Cost Estimate Overview
Why CeC is needed? High luminosity of US future electron-ion collider(EIC) is critical for success of its physics program 2018 NAS Assessment of U.S.-Based.
North Carolina Council on Developmental Disabilities
EIC Collaborations EIC Collaboration Workshop, JLAB Oct 28-Nov 1st
SOLID Collaboration Meeting
Spin Transparency Study and Test
CEBAF Pulsed Operation for JLEIC Electron Injection
Update on the JLEIC pCDR
JLEIC Engineering Status
JLEIC Main Parameters with Strong Electron Cooling
Comments to the Report of the Community Review of EIC Accelerator R&D for the Office of Nuclear Physics, February 13, 2017 (60 pages) By Haipeng Wang,
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Perspectives from DOE NP
Overview Slides for JLEIC Presenters
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

FY18-19 EIC R&D FOA FY 2018 Research and Development for Next Generation Nuclear Physics Accelerator Facilities Web site: https://science.energy.gov/np/funding-opportunities/ Announcement number for DOE National Laboratories: LAB 18-1848 Announcement number for other institutions: DE-FOA-0001848 The rules are somewhat different for the labs and other institutions; this presentation is based on the announcement for the labs Dates No letters of intent No pre-proposals Full proposals are due on 01/19/2018 at 5 pm EST Anticipated selection and award dates: “It is anticipated that the award selection will be completed by July 15, 2018. It is expected that awards will be made in Fiscal Year 2018.” Funding $7M per year over two-year project periods No award ceiling for national labs Proposals are for two years FY18 and FY19, there will be no FY19 FOA

FOA Topics “R&D … should fall in the following general categories: Accelerator R&D with the potential for the development of future generation accelerators, i.e., currently not under construction or approved design (e.g., EIC). Accelerator R&D with the potential for improved performance to existing user facilities that will lead to new capabilities.” “Priority will be given to potential initiatives identified by the community as compelling, such as in the NSAC LRP for Nuclear Science. Relative to a potential electron-ion collider, community sponsored review panels and workshops have identified a number of areas where focused R&D and prototyping could advance technical feasibility and pre- conceptual design; priority will be given to these areas of study. … Thus, the relevance of proposed electron-ion collider efforts to the R&D priorities established in that [Jones panel] report should be clearly articulated in the application.”

Review Criteria “Initial Review Criteria “Merit Review Criteria the applicant is eligible for the award the information required by the Program Announcement has been submitted all mandatory requirements are satisfied the proposed project is responsive to the objectives of the Program Announcement the proposed project is not duplicative of programmatic work” “Merit Review Criteria Scientific and/or Technical Merit of the Project Appropriateness of the Proposed Method or Approach Competency of Applicant’s Personnel and Adequacy of Proposed Resources Relevance to compelling scientific opportunities identified in the 2015 NSAC Long Range Plan Relevance of proposed electron-ion collider R&D efforts to the current EIC design concepts and the R&D priorities as identified in the 2017 NP Community EIC R&D panel report The opportunity for training junior accelerator physicists in accelerator science and technology”

Proposals Multiple proposals can be submitted from a single institutions. Moreover, DoE prefers it if the proposals are separated based on topics and collaborations. Then they don’t have to do it themselves. “The project narrative must not exceed 16 pages of technical information, including charts, graphs, maps, photographs, and other pictorial presentations, when printed using standard 8.5” by 11” paper with 1 inch margins (top, bottom, left, and right). For collaborative proposals, the project narrative page limit is 24. The font must not be smaller than 11 point.”

Proposal Contents “Budget, entered into PAMS as structured data using the PAMS budget form Abstract (one page), entered into PAMS as a separate pdf Budget justification, entered into PAMS as a separate pdf Proposal, combined into a single pdf containing the following information: Proposal Cover Page” Cover page supplement for the lead collaborative proposal only “Table of Contents Project Narrative (main technical portion of the proposal, including background/introduction, proposed research and methods, timetable of activities, and responsibilities of key project personnel…)” Appendices

Collaborative Proposals “Collaborative proposals submitted from different institutions must clearly indicate they are part of a collaborative project/group. Every partner institution must submit an proposal through its own sponsored research office. Each collaborative group can have only one lead institution. Each proposal within the collaborative group, including the narrative and all required appendices and attachments, must be identical with the following exceptions: Each proposal must contain a correct cover page for the submitting institution only. Each proposal must contain a unique budget corresponding to the expenditures for that proposal’s submitting institution only. Each proposal must contain a unique budget justification corresponding to the expenditures for that proposal’s submitting institution only. Our intent is to create from the various proposals associated with a collaborative group one document for merit review that consists of the common, identical proposal materials combined with a set of detailed budgets from the partner institutions. Thus, it is very important that every proposal in the collaborative group be identical (including the title) with the exception of the budget and budget justification pages.”

Go to Clarifications from Manouchehr

High-A & High-B EIC R&D Activities from Jones Report Row # Concept Title of R&D Element Priority 1 All Crab cavity operation in a hadron ring High-A 2 High-current single-pass ERL for hadron ring 3 Strong hadron cooling 4 Benchmarking of realistic EIC simulation tools against available data 5 Validation of magnet designs associated with high-acceptance interaction points by prototyping 6 Polarized 3He source 7 LR High-current polarized and unpolarized electron sources High-B 8 Completion of the ongoing CeC demonstration (proof-of-principle) experiment 9 High-current multi-pass ERL 10 Concept for 3D hadron CeC beyond proof of principle 11 SRF high-power HOM damping 12 RR Complete design of an electron lattice … and instability threshold study… 13 High peak-current multi-turn electron linac 14 Necessity to triple the number of and shorten the bunches in the proton / ion ring 15 Beam pipe copper coating with plasma ion bombardment 16 Simulation of the effect of electron bunch removal on the hadron beam 17 JLEIC Complete and test a full scale suitable superferric magnet 18 Develop a high-current magnetized electron injector 19 High-power fast kickers for high bandwidth (2 ns bunch spacing) feedback 20 Complete the design of the gear change synchronization and assess its impact on beam dynamics 21 Integrated magnetized beam/kicker circulation test using the existing ERL infrastructure 22 Operate the JLab Continuous Electron Beam Accelerator Facility in the JLEIC injector mode

Summary of Collaboration Topics with BNL Strong Hadron cooling options for eRHIC and JLEIC Study the application of optimized strong hadron cooling techniques for both JLEIC and eRHIC High Intensity ERL Studies at CBETA Not for FY18, is it back on the table for FY19? R&D on High Field Septum Type Interaction Region Quadrupoles Development and Test of Simulation Tools Primarily beam-beam Developing highly damped RF Structures for Strong Hadron Cooling ERL Experimental Beam Test of Crab Cavities at SPS Development of a very broad band kicker for the multibunch damper systems Development of a High Intensity Polarized Electron Source?

Go to Proposal Plan