A.Blas AB/RF/FB APC meeting 20/4/ Status of the PS TFB Upgrade launched in July 2005 L. Arnaudon, A. Blas, F. Caspers, D. Glenat, R. Louwerse, V.
Advertisements

Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
SPP FIELDS Preamp Power Requirements 01DEC2012 D. Seitz.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
Electrical & Control Power Supplies Trevor Hartnett.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
G D Commissioning Progress and Plans Hanford Observatory LSC Meeting, March 21, 2005 Stefan Ballmer.
Preamplifiers : BGA 2003 (Silicon MMIC amplifier): In general, the function of a preamp is to amplify a low-level signal to line-level. DESCRIPTION: Silicon.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20091/23 reported by Wolfgang Hofle CERN BE/RF/FB Transverse feedback to cure electron-cloud induced.
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
A.Blas APC meeting 12/5/ Status of the PS TFB Project triggered by: K. Schindl and R. Cappi Hardware: J. Belleman (PU amplifiers) T. Bohl, W. Hofle,
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
LEIR Transverse Dampers Alfred Blas LIU-ION LEIR Internal Review Associated colleagues: Michel CHANEL Alan FINDLAY Wolfgang HOFLE Reinier.
RF system & magnetic PU ELENA review meeting CERN, November 2015 M.E. Angoletta, S. Hancock, M. Haase, M. Jaussi, A. Jones, J. Molendijk, M. Paoluzzi,
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
FBCT experience at Desy Presenter: Matthias Werner, DESY At CERN Workshop: „Improving the accuracy of the BCT measurements in the LHC“ January 2011.
F. Caspers, S. Federmann, E. Mahner, B. Salvant, D. Seebacher 1.
Radio-Frequency (RF) & Schottky diagnostics WP for ELENA Maria Elena Angoletta, BE/RF on behalf of the CERN RF group First ELENA construction meeting CERN,
A new RF system for the PSB. LIU-PSB Working Group Meeting, 10th December 2015 M. Paoluzzi December 10 th Wide working group involved including.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
Challenges of Dual Harmonic RF Systems
For Diagnostics and Deceleration Flemming PEDERSEN
The ISIS Dual Harmonic Upgrade
Oleksiy Dolinskyy December 1st, 2014
Phase Feed-Forward Piotr Skowroński (CERN)
Visit for more Learning Resources
Brief Status SPS Prototype PSB Prototype Installed in LS1
Jorge Sánchez-Quesada BE-RF-FB
ELENA installation and commissioning status
Installations up to Start of Commissioning
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
LIU – EVM status and next steps
Injectors BLM system: PS Ring installation at EYETS
Construction and Commissioning of Electronic Test Benches
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE-BI Software for LINAC4
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
10 MHz amplifier status G. Favia
The ELENA BPM System. Status and Plans.
Possible causes for SPS ZS2 misalignment
Digitizers in CCR for transverse wide-band pick-ups
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
Transverse Feedback System (LHC Damper)
Upcoming longitudinal MDs
Electronics: Demod + 4Q FE
Electronics: Demod + 4Q FE
BESIII EMC electronics
SPS Transverse Damper System
Limits on damping times
AB-RF-FB section meeting
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Maria ELENA Angoletta for the RF team
S21 (at center frequency) 19 dB
Cooling of C6+ ion beam with pulsed electron beam
Status of the BI Work Package in the LIU-PSB frame
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

ELENA / AD Pick-ups and Schottky Wolfgang Hofle, 7 March 2019

ELENA longitudinal pick-ups (LPU) Principle follows the design by F. Pedersen for AD Low frequency version: 3 kHz - 3 MHz High Frequency version: 800 kHz - 30 MHz different types of ferrites are used for the two versions Wolfgang Hofle, 7 March 2019

ELENA longitudinal pick-up assembly Design: J. Sanchez Quesada, F. Pedersen, F. Caspers, S. Federmann et al. http://accelconf.web.cern.ch/AccelConf/IBIC2013/papers/tupf27.pdf Mechanical engineering with Central Workshop Amplifier design and commissioning in BE-RF-FB R. Louwerse assigned for its performance improvement after Departure of J. Sanchez Quesada Help from F. Caspers available Wolfgang Hofle, 7 March 2019

Status of ELENA LPUs Four pick-ups were planned within the project 3 low frequency pick-ups (LF) 1 high frequency pick-up (HF) The HF and LF Schottky LPU are installed in the ELENA ring The signals they provide suffer from interference this is being looked at with priority Combining the signals correctly for different energies requires an adjustable delay between the two (depending on beam energy) that needs completion (electronics) The remote control of the gain requires completion of work in BE-RF-CS The LF pick-up in the extraction line to Gbar (LNE50) was installed in 2018 and has measured the intensity of the extracted bunches through a system of digitization and calibration provided by BI (J.C. Allica Santamaria) Signals are also available on OASIS (since 2018) Cabling is prepared for the last of the four pick-ups, a LF version for the LNE00 line Nota bene: LNE50 LPU has small leak (?); no spare pick-up Wolfgang Hofle, 7 March 2019

Head amplifier powered remotely from the rack powering through a long cable with feedback to stabilize DC voltage interference observed and oscillatory behaviour of voltage regulation mitigation in ELENA ring by local power supply (mid June 2018); reducing regulation bandwidth on electronics implemented during 2nd half of 2018 (R. Louwerse) Wolfgang Hofle, 7 March 2019

Test in June 2018 (LF version in LNE50) Wolfgang Hofle, 7 March 2019

Powering locally from lab supply Powered from rack with operationally used supply Powered locally from a lab supply in the ring LF LPU LNE50 LF LPU LNE50 400 mVpp 20 mVpp LF LPU Ring LF LPU Ring 80 mVpp 20 mVpp Signals without beam, output of pe-amplifier

Ring PUs with local powering Frequency response to be adjusted Delay for combined signal to be checked 27.06.2019 (pbar) D. Gamba Wolfgang Hofle, 7 March 2019

LF LPU for LNE00 and strategy Pick-up mechanically completed Leak tested and accepted by TE-VSC after bake-out Test stand being prepared for the electrical tests with pre-amplifier in building 112 Wolfgang Hofle, 7 March 2019

Completion of electronics and installation Mitigation of noise and interference through testing in 112 and trying out modifications Test of operational set of electronics in 112 for LNE00 Test of spare set of electronics in 112 with pick-up Installation in LNE00 of pick-up and electronics Repeat measurements to see if situation in ELENA is different from the lab environment Decision on needed modifications of the electronics and on spare electronics depending on the outcome of the tests (budget from operations, ~10 kCHF may be needed) Wolfgang Hofle, 7 March 2019