South Western Railway Overview of Wiltshire and South West Priorities

Slides:



Advertisements
Similar presentations
Windsor Park & Ride (Overview & Scrutiny Panel – 29 th October 2007)
Advertisements

TravelWatch SouthWest MetroWest - from concept to delivery James White 4 October 2014.
The independent campaign for a better bigger railway.
 Peninsula Rail Task Force Rail Stakeholders’ Update 6 th March 2015.
Yeovil Junction Yeovil Town Yeovil Pen Mill To Frome To Taunton To Exeter To Weymouth To London Waterloo Key: B&E/GWR L&SWR/SR Proposed route Trackbed.
Hugh Chaplain Transport for Greater Manchester / Rail North Thursday 6 th November 2014.
Wiltshire Green Infrastructure Strategy. What is green infrastructure? The Wiltshire Green Infrastructure Strategy Wiltshire’s existing green infrastructure.
Introducing Passenger Focus and local rail services for Peckham Rye Sharon Hedges Passenger Link Manager.
1Rail Group The Big Question Peter Wilkinson, Director, Rail Franchising.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
TRANSPORT INNOVATION FUND Stephen McFarlane Regional & Local Transport Delivery - DfT.
THE SOUTH WESTERN RAILWAY Growing the regional economy through better connectivity Chris Loder Head of Business Projects.
Action for business, by business Action For Business – Tameside Friday 30 th November 2012.
Possible Routes. The Salmon Weir Crossing – A new bridge A new Bridge The Salmon Weir Crossing A new Bridge.
What Transport for Cambridge? The Sub-Region Development Strategy and Transport Policies.
Moving People Overview. Key Themes Road Hierarchy/Classification Strategic freight corridors Strategic public transport corridors Review and implementation.
Item 10. Rail Update Great Western Franchise 7 March 2012.
Steve Beverley SUSTAINABLE TRAVEL MANAGER METROCENTRE, GATESHEAD.
London City Airport Airport Surface Access Strategy (DRAFT) - summary of development & next steps December
Transport Focus Update Nina Howe Passenger Manager.
1 Date SINTROPHER Regional Workshop David Morgan.
Marston Magna Junction Departures. Marston Magna Jcn DEPARTURES Platform 0717 Yeovil Junction Penzance Weymouth Chelford Taunton1.
Kent Route Director Andrew Munden November Agenda Introduction Network Rail’s Role Network Capacity Network Constraints Timetable Development Process.
Growing the regional economy through better connectivity Chris Loder Head of Business Projects.
High Speed Rail Opportunities for the West Midlands Geoff Inskip Chief Executive Centro.
Why not a ‘Southern Powerhouse'? John Denham Chair of the Advisory Board
Analysing the Case for Change Joe Lennard | Digital Railway Funding Lead Suppliers’ Summer Conference 15/07/2015.
 The 20 Year Plan for the SW Peninsula Rail Network Philip Heseltine Head of Transport, Infrastructure and Investment, Plymouth City Council On behalf.
Scotland Route Utilisation Strategy. Slide 2 What is a RUS? A blueprint for the future of the route  Provides a series of options that funders may choose.
Developing Devon’s rail network - new stations and beyond
South Western Railway.
Alternative ways to address growth
Rail North Manchester Airport Transport Forum
High Speed Rail Some Development Principles
MetroWest Phase 2 LGA PT Consortium Visit 7th September 2017

East Sussex Strategic Partnership Transport Update 25 April 2017
West of England Joint Transport Study
What’s the Combined Authority all about
Improving the Cardiff and Valley Railway
Raising the Bar for Integration with Public Transport
Strategic Transport Forum Friday 15th September 2017
Central Polk Parkway PD&E Study
The Freight RUS - a draft for consultation
The Second Consultation!
Transportation Summit
Kent Route Director Andrew Munden
Midlands Connect: A Pan Midlands Strategic Transport Partnership
TravelWatch SouthWest General Meeting Taunton, 7th October 2017
Simon Warburton Interim Strategy Director, TfGM.
Rail Service Update Peter Jermany Principal Planner (Planning Policy)
TravelWatch SouthWest General Meeting Taunton, 6th October 2018
Great Western Railway GWR’s Rail Vision and Community Rail
Ian Brooks Assistant Director, PricewaterhouseCoopers
Delivering East West Rail
Walking and Cycling Strategy Implementation
Getting Around Lightly
East Coast Route Study November 2016 update.
Current and future investment priorities for the south east
Friday 14th – Monday 17th April
Introduction to Micro-Transit / Demand Responsive Transit
FPASTS STAG 1 plus – Rail Elements (Ellon Rail Study)
Kent Route Study – Draft for Consultation
GEML SOBC GEML Rail Conference July 2019
Great Eastern Mainline
Travel to Royal Surrey County Hospital
Possessions Update Great Western Railway Andy McRae
Trans Wilts Conference
TransWilts June 2019 Alex Lawrie.
Western Rail Link to Heathrow
Presentation transcript:

South Western Railway Overview of Wiltshire and South West Priorities Andrew Ardley Regional Development Manager

Contents My role The SWR franchise Getting the strategic approach right Service optimisation report West of England line and TransWilts Salisbury Customer and Communities Improvement Fund

My Role

The SWR Franchise

The SWR Franchise

A Regional Approach? Stations Track Rolling Stock Depots Timetable (including freight interests) Timetable

A Regional Approach?

A clear vision?

Pulling Together Aspirations

Service Optimisation Report Brighton to Exeter via Southampton and Salisbury Portsmouth – Southampton – Bristol Bristol – Yeovil – Weymouth Southampton Airport – Salisbury – Swindon Reading – Guildford – Gatwick Optimisation refers to: Demand Secretary of State and stakeholder aspirations Optimal use of rail capacity DfT asked SWR to explore specific aspirations (amongst others): Hourly Swindon – Westbury – Salisbury – Southampton Apt Parkway Bristol – Southampton stopping service SWR franchise obligation but produced jointly with GWR

Service Optimisation Report: DfT Response August 2018 [extracts]

A route based approach…. Woking / Wimbledon / Waterloo Castle Cary – Exeter diversion Basingstoke Exeter Central / Exeter St Davids Salisbury Yeovil to Chard Junction Wilton – Gillingham single line / Tisbury loop Honiton to Pinhoe Plus: Access to / from stations e.g. car parking, bus, walking and cycling options

Focal Point: Salisbury

Questions