Presented at Princeton Future Princeton Public Library, Princeton NJ

Slides:



Advertisements
Similar presentations
Critique of PU A&T Site Plan Alain L. Kornhauser, PhD 11/29/
Advertisements

Full Kornhauser. Full Kornhauser Issues Not surprisingly, tunneling to Palmer Square is no easy matter. The tunnel route must go under road infrastructure,
Access & Circulation to a Moved Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
An Advanced Transit Alternative for The Princetons Alain L Kornhauser 24 Montadale circle Board Chair Advanced Transit Association Founder ALK Transportation.
Lunar Research Station Tarrant Elementary School 4 th Grade Gifted Class Tarrant, AL.
1 Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area Township of West Windsor September 8, 2008 Urbitran | DMJM Harris.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
1 PRINCETON FUTURE January 11, 2011 PRINCETON BRANCH TRANSPORTATION ISSUES Jack May.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
NJ Transit Train Station “Consumer-shed” NJ Transit Train Station “Consumer-shed”
FOR LEASE Kenmark Corporate Center East & West San Mateo, California Kenmark WestKenmark East.
Addressing The Dinky Terminus Must Move Issue Alain L. Kornhauser Montadale Circle Township.
Circulation Solutions that Preserve the Current Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township.
Access & Circulation to a Moved Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING March 4-3:00PM | ROOM 1E-113.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Detroit River International Crossing (DRIC) Study 2007 Ohio Conference on Freight Toledo, Ohio September 18, 2007.
UniversityCity Proposal for FY2012 TIGER Discretionary Grant MARCH 2012 FIU, City of Sweetwater and Miami-Dade Expressway Authority by FIU Maidique Campus.
Stop Sign This is a traffic sign. This means to stop. It helps us be safe when driving.
HSL Helsinki Region Transport Local Rail Projects in Finland Arttu Kuukankorpi Head of Route Network and Timetable Planning Group.
THE CANADA LINE Project Backgrounder
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
September 25, 2010 Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale Circle.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Circulation Solutions for Alexander-University Congestion Alain L. Kornhauser 24 Montadale Circle Princeton Township.
September 25, 2010 Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale Circle.
Statement of Alain L. Kornhauser, PhD NJ Historic Sites Council April 19, 2012 Trenton, NJ.
Alain L. Kornhauser, PhD Professor, Operations Research & Financial Engineering Director, Program in Transportation Faculty Advisor, Princeton Autonomous.
Background B Case Studies & C. Public Improvement Plan Presented by: Erin Newton.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING Sept. 17, 2014|3:00PM -5:00PM | ROOM 1E-113.
Mercer Corridor Stakeholder Committee November 4, 2015 Sound Transit.
San Diego Trolley. Current Current/future expansion Propose extension.
September 30, 2010 Whereas, Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale.
II. Facility Program, A. Providers HOUSTON INTERMODAL CENTER/MULTIMODAL TERMINAL.
Topographic Maps.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
HOLLYWOOD PLAZA PARKING GARAGE BZA #VA APPLICANT: JOSHUA WALLACK APPELLANT: SCOTT A. GLASS HOLLYWOOD PLAZA PARKING GARAGE BZA #VA
Indian Hill Grade Separation City Council Meeting February 23, 2016.
Ardmore Station Presented to Lower Merion Commissioners by Carl Dranoff March 11, 2009.
1 Eagle P3 Project Update FasTracks Monitoring Committee September 1, 2015.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Arizona Forward Update
planning and zoning committee presentation September 19, 2016
Potomac Yard Metrorail Station
Regional Roads Committee
West Chester Borough Master Parking Plan Framework
Little Rapids Habitat Restoration St
Center City Connector 101.
Transportation and Traffic Engineering Ch 1 Introduction 10/10/2017
Draft Transportation Element September 6, 2017
CLIC Civil Engineering Update
Lilia Y. Gonzales '94, AIA, LEED AP BD+C, University Architect
NCC Education - Title Master
Analysis of Walk Distances to Major Venues from existing and proposed station locations by Alain L. Kornhauser 12/18/12 Format of labels: Name (Walk Distance.
SKYTRAINS Sky Train has 79.6 km (49.5 mi) of track[4] and uses fully automated trains on grade-separated tracks running on underground and elevated guideways.
25th Avenue Grade Separation
25th Avenue Grade Separation
West Campus Parking Deck & Roadway Update
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Rail Program Management Services Review Grade Separation Recommended Ideas Palo Alto Rail Committee Meeting ……..
METRO RAIL IN CHENNAI Prepared by S.PRABHAVARAJAN LECTURER.
Radical Improvements for the Area's Transportation System
AN INVESTMENT IN CALIFORNIA’S FUTURE
About Rio Grande Pacific Corporation
Presentation transcript:

Presented at Princeton Future Princeton Public Library, Princeton NJ Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale Circle Princeton Township Andrew Koontz President, Borough Council, Princeton Borough Presented at Princeton Future Princeton Public Library, Princeton NJ September 25, 2010

Whereas, Princeton University located a parking garage without adequate accessibility Fac ulty Road Parking Garage Dinky Station Alexander Road September 25, 2010

Whereas, Princeton University wishes to create a barrier-free pedestrian plaza as part of its Arts Center Development Project September 25, 2010

Whereas, Princeton University, without using any of its infinite wisdom, initiated a “Land Grab” by proposing that the Dinky Station be moved 450 ft. September 25, 2010

Whereas, Princeton University, without using any of its infinite wisdom, initiated a “Land Grab” by proposing that the Dinky Station be moved 450 ft. September 25, 2010

Whereas, This would be the 2nd time the University has performed a “Land Grab” on the Dinky. The original station was moved “450 feet” to make room to create a “barrier free plaza” between Henry & 1901 etc. September 25, 2010

Whereas, This would be the Nth time the University has opposed rail accessibility to the center of Princeton. Two interurban trolley lines connected Trenton and Princeton. Both succumbed to the contemporary “Marv Reed’s BRT” which rapidly transformed into the “606”. September 25, 2010

Whereas, by using just a little wisdom, one observes that the elevation of the Dinky tracks at it Canal crossing is approximately 42 feet 42 feet September 25, 2010

Whereas, one further observes that the Dinky tracks rise 66 feet so as to make a dangerous at-grade crossing with Faculty Road September 25, 2010

Whereas, one further observes that the Dinky tracks rise another 37 feet to its current station location and creating the surface nuisance for the garage and the plaza Climb 37 ft to Current Station Location 42 ft Canal Xing Elevation Climb 66 ft to Faculty Road Xing September 25, 2010

Let it be Resolved, To re-grade the Dinky line so that it climbs only 46 feet so that it can safely pass under Faculty Road After Now September 25, 2010

Let it be Resolved, To re-grade the Dinky line so that it climbs only 46 feet so that it can safely pass under Faculty Road After Now September 25, 2010

Let it Further be Resolved, to continue the grading so as to relocate the Princeton Dinky Station 20 feet below its current location September 25, 2010

Underground Dinky Station Let it Further be Resolved, that NJ Transit grant “air rights” to Princeton University so that it can create a barrier free plaza and access drive to its parking garage Underground Dinky Station September 25, 2010

Development Opportunity Let it Further be Resolved, that with its “air rights”, Princeton University will make better use of its otherwise barriered land holdings along Alexander Road Development Opportunity Development Opportunity Cover Over September 25, 2010

Let it Further be Resolved, that NJ Transit evaluate the feasibility of Modernizing the Dinky through Automation since its tracks are now completely grade-separated Enabling 24-7 operation (if need be) Meet of all trains at Princeton Jct. 5 minute headway integration with P. Jct. Transit Village Many proven technology options; for example: JFK Air Train Technology September 25, 2010

JFK Air Train Technology Linear Induction Motor Propulsion Completely Automated Other Implementations Vancouver, BC SkyTrain Largest system 1st opened in 1985 Toronto (1985) Detroit (1987)) Kuala Lumpur (1998) Beijing Airport Line (2008) Video Outside Video Yongin, South Korea (under construction) September 25, 2010

Let it Further be Resolved, Automation of the Dinky would enable the University to add an additional station east of the canal enabling intelligent accessibility and development of those lands September 25, 2010

Whereas, The natural contour of the land is such that the elevation of the Kiosk at Palmer Square is 43 feet above that at the current Princeton Station 188 feet 145 feet September 25, 2010

Whereas, Princeton University will have granted NJ Transit the right to tunnel under its campus at some future date 1,700 feet February 16, 2010

Let it Further be Resolved, that NJ transit undertake a thorough study of the engineering and economic implications of extending the Dinky to an underground station at Palmer Square September 25, 2010