4RP – authorization of wagons

Slides:



Advertisements
Similar presentations
IRSC October Denver, USA 1 Europe: an open space for rolling stock?
Advertisements

Cross-Acceptance: UNIFE expectations Alice Polo Safety and Certification Manager.
Reference Document Management 1 European Railway Agency (ERA) Cross-Acceptance Unit P. Mihm 17/11/2010.
The Future – the “Roadmap” SIMPLIFICATION. The Road Map 2 TSI in Place Hi Speed Conv Loc & pass Off TENS TSI Conformity New Vehicles Networks Open pointsUpdates.
The European Railway Agency in development
1 BRIEFING TO PORTFOLIO COMMITTEE ON HOUSING ON THE PREVENTION OF ILLEGAL EVICTION FROM AND UNLAWFUL OCCUPATION OF LAND AMENDMENT BILL (BILL ) DATE:25.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
Open Competition Intellectual Property Specialists (AST 3/ AD6) OHIM, Alicante – Spain Open for application: October 31st 2013 Apply before : December.
Competition Amendment Bill PASA Presentation by Pierre Coetzee 29 July 2008.
BEWAG (UIP) General assembly European Railway Agency Jean-Marie DECHAMPS, Head of Sector (Safety) Brussels, 27 April 2015.
INTERREG IVA 2 Mers Seas Zeeën Crossborder Cooperation Programme Part-financed by the European Regional Development Fund (ERDF) Legal framework:
Workshop BeWag UIP Implementation of certification of entities in charge of maintenance Jean-Marie DECHAMPS-SAFETY Unit Brussels 28/04/
Implementation of EU Electronic Communication Directives.
Second expert group meeting on Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Cohesion Policy
Definition of a Vehicle Type for IWVTA + Extension of Approvals SGR Transmitted by OICA.
Workshop BEWAG Entity in charge of Maintenance Brussels, 01 st of December /11/2010J-M DECHAMPS.
VALUE FOR MONEY 1 OGC buying.solutions Procurement of Projects Presented by Andy Hamer Pre Accession Advisor, Finance Ministry.
Lille, 17th November 2010 Ernest GODWARD The Report on Vehicle Authorisation - Costs and Complexities.
Public hearing on the 4 th Package 1 The future role of the European Railway Agency Tuesday, 07 May 2013 Steer Davies Gleave Upper Ground London,
1 December 2010 NSA Belgium. 1 December 2010NSA Belgium - Michel Lambermont Constructing, modifying and changing the assignment of wagons.
UIC ERTMS World Conference Certification and Assessment of GSM-R Begoña DOMINGO, GSM-R Project Officer Istanbul, 3/04/2014.
Contracts FP6. PRESENTATION OUTLINE è Legal Framework è Participation è Contract Structure è Collective Approach l signature and entry into force l collective.
The 4 th Railway Package: Impact for the keepers Clio Liégeois.
Recommendation 2014/897/EC (DV29bis) Key Principles.
RE-E / IRSC / 27/09/ /10/09 1 The necessary evolution of railway safety regulations in Europe A challenge – Risks to be controlled.
SEA in the Czech Republic Prague, 24 September 2008.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT meeting, 12 December 2005 Barbara Piotrowska, DG REGIO
General Meeting Florence Secretary General report on Items 5 of the agenda Imrich KORPANEC.
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Advocacy and Legal Advice Centre - Internal procedures -
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Contractual and Financial Management Administrative and Financial Handbook.
109 July 2009CER The Voice of European Railways Cross Acceptance CER Expectations ERA Seminar, Lille, Libor Lochman.
1 Session 1 Perspective for More National Space Legislation - Report of the Rapporteur - Dr. Michael Gerhard, DLR Project 2001 Plus Symposium, Cologne,
Cases C-401 to 403/12 and C-404 to 405/12: No review of legality in light of the Aarhus Convention Dr. Mariolina Eliantonio, LL.M. Prof. Chris Backes Maastricht.
HORIZON 2020 Amendments to the Grant Agreement. Consequences The amended provisions become an integral part of the GA All other provisions remain unchanged.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
The United States Trade Representative  Is an agency within the Executive Office of the President  Approximately 200 people work at USTR  Negotiate.
Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Structured Dialogue Brussels, 19 September
Workshop accreditation and recognition / conformity assessment Removing Technical Barriers - TSIs within New Approach and Safety Directive Dr.-Ing. Andreas.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 9 – Financial services Bilateral screening:
Copyright © AEbt 2016 All Rights Reserved. AEbt Angewandte Eisenbahntechnik AEbt Angewandte Eisenbahntechnik (AEbt Applied Railway Technology) Further.
1 Package on food improvement agents Food additives Food enzymes Flavourings Common procedure Developments since earlier consultation.
23 and 24 May 2017 in Valenciennes
09/02/2018 6th ERA TAF TSI Regional Workshop (EE, LT, LV, PL) The Content of TAF TSI   ERA Telematics Team Warsaw September 2017.
TRANSPORT SCIENCE: INNOVATIVE BUSINESS SOLUTIONS
Safety alerts.
Europe: an open space for rolling stock?
Content of Tender Dossier - Instructions to Tenderers - Tenders
NAB/RB Training Workshop In Valenciennes, April 2016
EFRTC GENERAL MEETING Ny Tiana TOURNIER
Content of Tender Dossier Instructions to Tenderers
4th Railway Package – Implementation of the Technical Pillar
Session II: System authority for ERTMS 4RP Trackside approval
PROPOSALS ON ETCS COMPATIBILITY TESTING & RE-AUTHORIZATION
Practical cases UNIVERSITY OF ZAGREB EUROPEAN PUBLIC LAW
Pavel Kodym Interoperability expert
Network/route compatibility
ERA Seminar Cross Acceptance Ad hoc Summary
ERTMS Conference 4RP VA Authorisation
COORDINATING GROUP FOR STATISTICS ON TRANSPORT
The Mutual Recognition Regulation
Meeting of the WG on Rail Transport Statistics 2-3 April 2009
Commission proposal for a Directive on
A tool to promote the use of the standard
Bernhard Berger, Marco Paviotti DG Environment, European Commission
Jennifer Stradtman, Director, Technical Barriers to Trade
Andrea Sundstrand Associate Professor
Working together Marc Thauront Brussels 28 January 2009.
Fourth Railway Package Technical Pillar Hearing at the European Parliament, Brussels 7 May 2013 José GORTAZAR Chief Technical Officer, CAF.
Contractual and Regulatory Framework
Presentation transcript:

4RP – authorization of wagons

1. Background Legal Background Actually, no legal tekst is being published Technical pillar of 4th railway package is intended to enter into force by 01/06/2016 NSA Belgium 10/05/2016

2. Forecast Since June 2015, ERA is preparing in close collaboration with NSAs and the sector the implemenation of the 4RWP, By 01/06/2019, ERA will have taken over all authorisation procedures for vehicles intended to be authorised in more than one member state. For vehicles intended to be used in only one member state, the applicant will have the possibility to handle the authorisation with only the NSA of that member state whitout the intervention of ERA or with ERA. NSA Belgium 10/05/2016

3. Foreseen procedures ERA will set up cooperation agreements with the NSA of each member state. The applicant will have to send the request for authorisation to ERA (starting with a concept file). From there on, ERA will start up the authorisation process and will coordinate the authorisation activities with the NSA’s of the member states where the vehicles are intended to be used. During evaluation of a vehcile, (or subsystem), workgroups of concerned NSA’s, ERA, DeBO, NoBo (see comment), IM (see comment) and applicant(s) can be organised in order to make a status of the ongoing evaluations and tests and also to discuss and solve issues or problems. This workgroups will be coordinated by ERA. NSA Belgium 10/05/2016

3. Foreseen procedures For the authorisation process, ERA will have some inner resources but will also rely on the know how of the NSA’s. Therefore, ERA intends to create a ‘pool’ of experts. This topic is still under discussion. The evaluation process, as it exists today, will remain unchanged. The evaluation against TSI specifications will be done by the NoBo and the evaluation against NNTR wil be done by DeBo. Also the CSM processes will remain unchanged. NSA Belgium 10/05/2016

4. Authorisation The time schedule for the authorisation process remains the same i.e. 4 months, the ‘type authorisation’ being delivered by ERA. There is actually no clear view on (will be from ERA) registration of vehicles but it should stay the same as now. There will be a possibility for appeal by the applicant if there is a conflict between ERA and the applicant concerning the delivery of an authorisation (European Court). There is also an arbitration procedure for dispute between ERA and NSA NSA Belgium 10/05/2016

5. Modification In case of modification, the provisions of DV 29 apply. In case there is a new authorisation needed, the procedures as described in 3 and 4 apply. NSA Belgium 10/05/2016

The process as described for vehicles will apply for wagons It is to be noticed that today, a major part of the wagon fleet used within the EU are RIV or TEN (GE). New built wagons fullfil the TSI Wagon (DC 321/2013 and its amendments) + eventually § 7.1.2 + eventually annex C and also the TSI Noise. Modifications on the wagons have to be done according to the above mentioned TSI. There is only a very restricted amount of remaining national rules for wagons in Belgium. The process as described for vehicles will apply for wagons NSA Belgium 10/05/2016

QUESTIONS ? NSA Belgium 10/05/2016