Meaningful Results CAN Come Early in SPI Efforts

Slides:



Advertisements
Similar presentations
A Navy Business Initiative Defense Daily OA Summit 12 November 2013 Nickolas H. Guertin, PE Director for Transformation DASN RDT&E
Advertisements

SE 450 Software Processes & Product Metrics 1 Defect Removal.
Indicator 3.07 Understand the nature of customer relationship management to show its contributions to a company.
 Fraud refers to a criminal act.  Abuse is a civil violation where criminal intent cannot be proven  In the case of surveys, it appears falsification.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
TERM 3: BUSINESS ROLES AND BUSINESS OPERATIONS ENTREPRENEURIAL QUALITIES AND SUCCESS FACTORS PART 2.
Management Leadership and Accountability. Managing vs. Leading By managing, organizations make things happen By leading, organizations show employees.
Training and Development Prof R K Singh AIMA CME.
Patient Safety Training Evaluations: Reflections on Level 4 and more…
Practicum: Learning Object Design and Development Instructional Design for eLearning Instructor: Tanveer Makhani.
Company is giving a fix income on every lead which is complete by you or by your Executive, I.E. Rs. 900/- E.G. if a single field executive.
Software Engineering Lecture 8: Quality Assurance.
Caruth Juvenile Delinquency Prevention Initiative Big Brothers Big Sisters requests: $2,993,750 Mentor 1,000 at-risk Dallas County youths Adjudicated Youth:
Design Intent. One of the biggest advantages Parametric Modellers carry over other forms of CAD is their ability to change and update models which have.
Swami NatarajanOctober 1, 2016 RIT Software Engineering Software Metrics Overview.
Learning objectives.
Six Sigma Greenbelt Training
Application Systems Health Assessment Summary
The Project Outputs and Activities.
WOREP: What we learned at CSUF?
Facet5 Audition Module Facilitator Date Year.
Enterprise Algorithm Change Process
How to write an article Composition.
Geographic Information System
Surfing and Searching the Web
The Annotated Bibliography
Amanda Oliver, Amanda Jamieson, Anne Daniel
What is your Learning Style?
Root cause analysis.
How does a Requirements Package Vary from Project to Project?
Implementing on a Limited Budget: Leveraging Existing Tools within Lockheed Martin Aeronautics Customer Support Centers Successful Collaboration and Knowledge.
Continuous Improvement
Paul Ammann The Agile Heresy: What Drives Traditional Software Engineering, and Why Agile Turns it Upside Down Paul Ammann.
SCHOLARLY BEHaVIORS HOW ARE YOU A SCHOLAR ?.
ريكاوري (بازگشت به حالت اوليه)
Drawing Conclusions and Making Inferences
Impact Post-Hire Surveys
Mathematical Modeling
المدربين : حوا سعادة – محمد حسيب
Karen Silvestri, Instructor English 90
Introducing ISTQB Agile Foundation Extending the ISTQB Program’s Support Further Presented by Rex Black, CTAL Copyright © 2014 ASTQB 1.
Survey design Stat 472.
TECHNICAL REPORT.
Positive/Negative Space
Finding Trends with Visualizations
Community Resource Team
In the Senior Design Center
CERNER MILLENNIUM Test Result Review & Documentation
Summer Bridge Example in the Assessment Cycle
Computer Science The 6 Programming Steps.
Giving Reality a little twist.
Gabriella Brignardello | Brian Higgins
SCHOLARLY BEHaVIORS HOW ARE YOU A SCHOLAR ?.
SCHOLARLY BEHaVIORS HOW ARE YOU A SCHOLAR ?.
Fill out your leadership support structure
Presentation to SISAI Luxembourg, 12 June 2012
SCHOLARLY BEHaVIORS HOW ARE YOU A SCHOLAR ?.
What Do Illustrators Do?
Different approaches for different questions…
Data Collection: Designing an Observational System
Karin Blix, Statistics Denmark,
Management Leadership and Accountability
What will you hear at this stage?
“Which Path Should I Take?”
For More Details:
Positive/Negative Space
Software Design & Production Methodologies
CERNER MILLENNIUM Test Result Review & Documentation
Presentation transcript:

Meaningful Results CAN Come Early in SPI Efforts Target improvements for frequently executed processes Examples include peer reviews, maintenance Develop complete, but manageable, package for improvements Process updates Training (both high level and detailed) Subject Matter experts for support Tools, if applicable Need to use leading indicators not trailing indicators Find something else to measure besides quality in the field Defect Containment, Behavior Surveys A little data goes a long way More is usually better, but you can draw useful conclusions with small data sets

Behavior Surveys As A Leading Indicator 50% Adoption of Planning Improvement 70% Adoption of SPC Improvement +22% increased in use of Org improvement DB +30% Improvement in Levels of Control

A Little Data Goes A Long Way