Transboundary cooperation in the Dniester River basin

Slides:



Advertisements
Similar presentations
Bic river basin management plan and involvement of local authorities in the implementation of the program of measures Dumitru Drumea, Executive Director,
Advertisements

International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Le Duc Trung Acting Secretary.
The Danube Basin ICPDR Philip Weller Danube Leaders Conference, Novi Sad, July 9, 2010 The Ecological Foundations for Development.
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
Public Participation in Transboundary issues in Moldova Ilya Trombitsky International Environmental Association of Dniester River Keepers Kisninev, Moldova.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
UNDP-ENVSEC Project Fostering a Dialogue between Riparian States for Development and Establishment of Initial Legal and Institutional Frameworks for Increased.
Project: Climate change and security in the Dniester river basin Sonja Koeppel, UNECE Water Convention secretariat, Coordinator of climate change activities.
International Cooperation in Water Management and Pollution Control in the Danube River Basin Joachim Bendow, ICPDR Executive Secretary 1.
EU S TRATEGY FOR THE D ANUBE R EGION (EUSDR) | Annual Stakeholder Seminar of the Pillar II. - Protecting the Environment of the EU.
The Marine Strategy Framework Directive 17th March 2010, Newcastle North Sea Stakeholders Conference Leo de Vrees European Commission (DG Environment,
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
Institutional Capacity in Transboundary Basins: The Danube The Experience of the ICPDR UN Water Decade Workshop 11 November, 2008, Bonn Philip Weller.
International legal Agreements - working together in the environment sphere Massimo Cozzone Italian Ministry for the Environment, Land and Sea 4th EU-Central.
Development of lake Druksiai/Drisviaty Basin Management Program Feasibility study.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia Update on strengthening the implementation and enforcement of EU environmental.
Third BERCEN Plenary Meeting December 16-17, 2004 Brussels, Belgium Key Achievements in Environmental Enforcement and Compliance in the Republic of Montenegro.
Kavala Workshop 1-2 June 2006 Legal protection of Transitional Waters [in the Cadses area]: A comparative analysis Dr. Petros Patronos / Dr. Liliana Maslarova.
“POLICY AND CHALLENGES ON ENVIRONMENT IN MONGOLIA – GEF COOPERATION” By J. Enkhsaikhan GEF Political Focal Point for Mongolia GEF Constituency Meeting.
Kyrgyzstan priorities in environment protection B. Tolongutov, Director, State Regulation Center on Environment Protection & Ecological Safety Sector State.
2 nd Annual meeting Athens, January 2006 Legal Protection of Transitional Waters in Greece Dr. Petros Patronos / Dr. Vivi Roumeliotou Nomos + Physis.
Trans-boundary river basins in Spain and Portugal: The Albufeira Agreement Teodoro Estrela Deputy Water Director Ministry of Environment, and Rural and.
2 International efforts to coordinate Mekong water development started in 1920s – Series of international agreements mainly for navigation and boundary.
BUG PROJECT Information as a basis to establish transboundary cooperation: The experience of the Bug Pilot Project Małgorzata Landsberg-Uczciwek Voivodeship.
Lake Peipsi/Chudsko-Pskovskoe – River Narva basin: working together on the new Eastern border of the EU Ago Jaani Ministry of the Environment Councillor.
16 th meeting of the EUWI EECCA Working Group Impacts of climate change on water resources in Moldova and possible adaptation measures. Trans-boundary.
Svetlana Stirbu, Secretary of the National Working Group for the implementation of the UNECE Convention on Transboundary Effects of industrial Accidents.
Dzidra Hadonina Ministry of the Environment of the Republic of Latvia Kiev, Ukraine, November 22-24, 2004 Legal Framework for Cooperation in the River.
“Lake Peipsi/River Narva basin – working together on the new Eastern border of the EU” Harry Liiv Deputy Secretary General on Environmental Management.
Public Participation in Transboundary Waters Negotiations and Cooperation: Dniester River Case Ilya Trombitsky Eco-TIRAS Moldova.
European Commission, DG Environment, Nature Unit
Seminar on the role of ecosystems as water suppliers CONCLUSIONS AND RECOMMENDATIONS.
08 th Meeting of the Working Group on Flood Management and Climate Change Adaptation Kiev, Ukraine 13 December 2013 Project Overview Project: Climate Change.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
The Mekong River Commission: Challenges, Mission, and Strategies.
Status of the Intergovernmental agreement on the Dniester River Basin Round table “Towards Integrated Management of the Transboundary Dniester River Basin:
Mekong River Commission Meeting the Needs - Keeping the Balance MRC Water Utilization Programme: GEF International Waters Project (GEF/World Bank)
Joint bodies according to the UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes Francesca Bernardini United.
Upcoming EU Regulation on Invasive Alien Species European Commission DG Environment MEETING OF THE STRATEGIC CO-ORDINATION GROUP FOR THE WFD COMMON IMPLEMENTATION.
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
Ecologic.de Public Participation- Key element of EU Water Policy Nicole Kranz Ecologic - Institute for International and European Environmental Policy.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Environment and Security Initiative - ENVSEC - Working Group on Integrated Water Resource Management October 2008.
1 ACTIVITIES OF THE REGIONAL ADVISER AND THE WORK PROGRAMME OF THE WATER CONVENTION Bo Libert, regional advisor on environment UN Economic Commission For.
Short overview of the legal framework of protected sites and status of existing ecological networks in Serbia.
The Mekong River Commission: Challenges, Mission, and Strategies.
Challenges, results and experience with cross-border cooperation - local and national level impacts - DRIMON and Transboundary Prespa Lake Basin Crossing.
The Azerbaijani Republic The Ministry of Ecology and Natural Resources WATER RESOURCES OF AZERBAIJAN, THEIR MANAGEMENT AND BILATERAL AGREEMENTS Matanat.
3rd Biennial GEF IW Conference Brasil, June UNDP/GEF Danube Regional Project GEF Danube – Black Sea Strategic Partnership 3rd Biennial GEF International.
Seminar for Eastern Europe, Caucasus and Central Asia Countries (EECCA) on Water Statistics September 2012 Almaty, Kazakhstan The EU Water Framework.
Mekong River Commission, Tools to Implement the 1995 Agreement - Dr Choomjet Karnjanakesorn, WUP Team Leader 28-Apr-17 Mekong River Commission (MRC) Water.
WHY IS INTEGRATED RIVER BASIN PLANNING IMPORTANT? Module 1 pp 1.1.
Convention on the Protection and Use of Transboundary Watercourses and International Lakes Elements for the second Assessment of transboundary waters in.
River Narva basin: Narva reservoir and Lake Peipsi
Participation as a Pivotal Element R. Andreas Kraemer & Nicole Kranz
Experience of river basin management approach for confidence building and promotion of ecosystems’ interests in divided country (Moldova) Ilya Trombitsky.
Environmental policies in Europe
National Policy Dialogues under the EU Water Initiative
What is this telling you?
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
DG Environment, Nature Protection Unit (D3)
Hydropower and the WFD: constraint or opportunity?
Natura 2000 and river basin management
Water Framework Directive, Habitats Directive and Inland Waterway Transport Marieke van Nood WFD Team, DG ENV.D.2, European Commission.
Frequently asked questions Part II: Coordination of monitoring under WFD and BHD Workshop: Biodiversity and Water - Links between EU nature and water.
What does it mean to have a forest in a Natura 2000 area?
Presentation transcript:

Transboundary cooperation in the Dniester River basin Madrid – Lisbon 19-23 November 2018

The Dniester basin – general information Riparians: Moldova, Poland, Ukraine Length – 1380 km Area – 72,9 K km2, incl. 73,5% in Ukraine, 26,2 % in Moldova and 0,3% in Poland 9th largest river in Europe, the biggest one in Moldova, 4th largest in Ukraine Annual discharge - 10,2 km³ Rich diversity of landscapes, habitats, animal and plant

Socio-economic development in the basin The basin hosts: 56 % of area of the Republic of Moldova, 2 municipal and 41 cities and towns (incl. the capital city Chisinau) Considerable area of 7 (out of 24) obslasts of Ukraine, incl. 62 cities and towns Ca. 8 mln people (110 pers/km2), incl. 2,74 mln in Moldova and 5 mln in Ukraine 3,5 mln people beyond the basin consume the Dniester water

Ramsar wetlands in the Dniester River basin Moldova: Ungur-Holosnica (2005) – 15,553 ha, borders with Vinnitsa oblast in Ukraine. 49 mammal sp., 205 bird sp., 96 reptile sp., 9 amphibian sp. Lower Dniester (2003) 60,000 ha, borders Odesa oblast of Ukraine. Hosts 80% of birds sp. Of Moldova, 57 fish sp. Ukraine: Northern Part of the Dniester Liman (1994) Intersction of the Turunchuk and the Dniester branch

Hydopower in the Dniester Dubossary HPP (commissioned in1953) Dam – 30 m high, 133 m long Reservoir - 3,6 bln3 (1/2 silted), 528 m wide, 128 km long, Installed capacity - 48 MW Dniester-1 HPP (commissioned in 1981- 1983) Dam - 1082  m long, 100 m high Reservoir - 3,6 bln3, 1 km wide, 194 km long Installed capacity - 702  MW Dniester-2 HPP (commissioned in 1982- 2002) – buffer Dam – 84 m high, 859 m long Reservoir - 32 m3, 20 km long Installed capacity – 40,8 MW Dniester Pumping Plant (commissioned in 1983- cnt’d) Dam -  7.3 km long, m high Reservoir - 32.7 km3  Installed capacity - 2947 MW (pumping), 2268 MW (turbining)

Nature-related challenges in the Dniester Hydropower: insufficient mutual understanding of flow regulation considering ecological flows and water use Pollution: insufficient efficacy of sewerage purification and lack of good agricultural practices Degradation of floodplains, sand and gravel extraction, loss of biodiversity Climate change

Key steps of bilateral cooperation Cooperation on cross-border waters (not basin) based on the Institute of Plenipotentiaries (ref. Agreement between the Government of the Republic of Moldova and the Government of Ukraine on Joint Use and Protection of Cross-boundary Waters (1994) A transit period based on a basin-wide principle joint management (a series of donors-funded projects) Cooperation based on a joint Commission (ref. the Treaty on Cooperation in the Field of Protection and Sustainable Development of the Dniester River Basin (2012)

The Institute of Plenipotentiaries (1994) The Institute of the Plenipotentiaries is a mechanism for implementation of the Agreement between the Government of the Republic of Moldova and the Government of Ukraine on Joint Use and Protection of Cross-boundary Waters (1994) Key achievements: Spring ecological flush flows Flood prevention and protection Emergency pollution of cross-border waters Hydrological and ecological monitoring at the border sites Challenges: The Agreement covers only cross-border sections of the river and does not cover the whole basin Limited cross-sectoral participation (only 1-2 sectors)

Bilateral Dniester River Basin Commission The Treaty on Cooperation in the Field of Protection and Sustainable Development of the Dniester River Basin was signed in Rome in 2012 (at the UNECE Water Convention MOP) Ratified by the Parliament of the Republic of Moldova in January 2013, by the Parliament of Ukraine in June 2017 Covers the whole basin, a multi- stakeholder platform

Bilateral Dniester River Basin Commission The first bilateral Commission meeting took place in Chisinau, Moldova on 17th September 2018 Key results: Adopted Rules of Procedures of the bilateral Dniester River Basin Commission Established working groups (ToRs agreed on): Strategic River basin management planning and management Emergency situations Monitoring and information exchange Ecosystems and biodiversity

National water-related legislation Moldovan Law on Water (2011) and Ukrainian Water Code of Ukraine (2016) integrate provisions of the EU WFD Additional documents / methodologies (ref. WFD) developed and adopted in both Riparians A list of members of the national Dniester Committees / Councils approved (2014 in Moldova and 2018 in Ukraine) Dniester basin national RBMPs have been developed and approved (2017 in Moldova) or are being developed (in Ukraine)

UNDP/GEF/OSCE project “Enabling transboundary cooperation and integrated water resources management in the Dniester River Basin” Based on a series of projects supported by the UNECE, OSCE and ENVSEC Initiative in 2004- 2015 The GEF projects supports: Development of elements of the Dniester RBMP (according to the art. 5 of the EU WFD) Development of a joint Programme of Measures (according to the EU WFD) which is to become a political document for joint actions Support to the Moldovan-Ukrainian Dniester River basin Commission (organization of the bilateral meetings, a study tour to the Albufeira Commission, stakeholders engagement) Support to a discussion and commenting of the operation rules of the Dniester hydropower (incl. pumping) plants, and impacts assessment of the hydropower sector on water use and ecosystems Demo projects (small rivers restoration, support to fish diversity) Public awarenness and communication

Future plans and challenges of transboundary cooperation Transition to the Integrated Water Resources Management in the Dniester basin Basin-wide approach to transboundary management and conservation Integration of the approaches set in the EU WFD, Directive on Sewage, Nitrate Directive, Flood Directive, Habitats and Birds directives Support to the bilateral Dniester River Basin Commission and its working groups

Thank YOU for attention and hospitality! Welcome to the Dniester!