NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report

Slides:



Advertisements
Similar presentations
Building a Combined 25F Nomogram Step 0: Define Terms Safe operating area: System remains within limits following the next worst contingency, regardless.
Advertisements

Puget Sound Area Northern Intertie (PSANI) Transmission History ColumbiaGrid September 24, 2007 September 24, 2007 Snohomish County Public Utility District.
NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report 24 Sept 2007 Gordon Dobson-Mack Ellen Feng
Project Update Late 2005 the PSANI Policy Group reviewed mitigation efforts to reduce transmission curtailments in the Puget Sound Region Late 2005 the.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
PROJECT RISK MANAGEMENT
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
©2001 Plan B Systems Inc. PBSi Quantitative Cost/Schedule Risk Analysis.
UFMP methodology changes in the updated webSAS February 2015 A video presentation reviewing the webSAS UFMP methodology changes going into effect March.
Project quality management Cody Ronning 3/23/2015.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Grizzly-Summer Lake 500 kV Line Planned Outage May 27-June hours Mike Viles – BPA Transmission Operations Technical Management Team June.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Puget Sound Energy Columbia Grid Presentation June 19, 2007 John Phillips.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Generation Adequacy Task Force Update to WMS November 18, 2009.
Puget Sound Energy Columbia Grid Presentation August 15, 2007 John Phillips.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Next-day Study Task Force Jason Ausmus NDSTF Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
A new Nomogram Development POM- based tool - Application results in the Idaho Power System. Orlando Ciniglio, IPC Marianna Vaiman, V&R Energy WECC TSS.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
2009 ERCOT CSCs and Congestion Zones (10/8/08) C. Richard Ross American Electric Power Service Corporation.
NHS England Emergency Preparedness, Resilience and Response (EPRR) Business Continuity exercise Information (Unobtainable) and Information.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
Texas Nodal Electrical Buses and Outage Scheduling.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
NHS England Emergency Preparedness, Resilience and Response (EPRR) Business Continuity exercise Staffing – reduced availability
Puget Sound Area Transmission Expansion Plan Sensitivity Results Review
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Bert Peters Chair, Path Operator Task Force
Transmission Planning in ERCOT- Overview
Risk Management.
Phase Angle Limitations
Software Project Management
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Brett Wangen Director of Engineering, Peak Reliability
Synergies Between Other IEA DSM Tasks and DSB
COM Operating Personnel Communications Protocols
CPWG – Meeting #1 Background
Status of the Planning Working Group’s (PWG) Efforts
Software Project Management
CHAPTER11 Project Risk Management
A Sample of Seldom Used Tools and other Power Flow Trivia
I-5 Corridor Reinforcement Project
Overview – Guide to Developing Safety Improvement Plan
PSASG Meeting BPA TBL Operation Concerns By Jerry Jackson II
Overview – Guide to Developing Safety Improvement Plan
Transmission Planning in a Modern Market Environment
Mgr. Interconnection Reliability Initiatives
DEC System Voltage Planning - June 2018
Enhanced Curtailment Calculator (ECC)
Building a Combined 25F Nomogram Step 0: Define Terms
Western Electricity Coordinating Council
Special MRC – Fuel Security
Reliability Assurance Initiative (RAI) 101
UFMP methodology changes in the updated webSAS
Assigned to the WEQ OASIS and WEQ OASIS/BPS Subcommittees
Bert Peters Chair, Path Operator Task Force
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Progress on Resource Adequacy Assessment for 2017
ColumbiaGrid Puget Sound Area Study Team
Resource Adequacy Steering Committee Meeting October 4, 2011
Presentation transcript:

NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report 24 Sept 2007 Gordon Dobson-Mack 604-891-6004 Ellen Feng 604-891-6087

Outline Background to PSASG Update report; Highlights from report; Example of Combining S>N and N>S Nomograms; Recommendations from draft report

Update to PSASG 2004 Report Requested by many parties; Draft report – comments and improvements are welcome Attempts to present factual assessment of relative curtailment risk;

Highlights from draft report Curtailment risk lower than in 2004; 14 South to North N-1 operating conditions with curtailment risk 9 North to South N-1 operating conditions with curtailment risk Numerous examples of operating innovations Getting harder to schedule outages

Building a Combined 25F Nomogram Step 0: Define Terms Safe operating area: System remains within limits following the next worst contingency, regardless of PSA generation levels. Potentially safe operating area: Depending on PSA generation, the system may not remain within limits following the next worst contingency. Unsafe operating areas: System WILL NOT remain within limits following the next worst contingency, regardless of PSA generation levels. Danger area: blind spot: Depending on PSA generation levels, a specific contingency may cause a transmission element to exceed its limits. With current tools, the System Operators may not be aware of this risk.

Building a Combined 25F Nomogram Step 0: Define Terms Safe operating area: System remains within limits following the next worst contingency, regardless of PSA generation levels. Potentially safe operating area: Depending on PSA generation, the system may not remain within limits following the next worst contingency. Unsafe operating areas: System WILL NOT remain within limits following the next worst contingency, regardless of PSA generation levels. Danger area: blind spot: Depending on PSA generation levels, a specific contingency may cause a transmission element to exceed its limits. With current tools, the System Operators may not be aware of this risk.

Building a Combined 25F Nomogram Step 1: Import South-to-North Nomogram Tacoma-Covington #2 230kV line O/S Winter 2007 Heavy Loads Outage: 931 Temp: 25Fahrenheit Safe operating area Potentially safe operating area Unsafe operating areas Danger area: blind spot

Building a Combined 25F Nomogram Step 2: Evaluate the S>N Operating Areas Tacoma-Covington #2 230kV line O/S Winter 2007 Heavy Loads Outage: 931 Temp: 25Fahrenheit Safe operating area Potentially safe operating area Unsafe operating areas Danger area: blind spot

Building a Combined 25F Nomogram Step 3: Import & Invert North-to-South Nomogram Tacoma-Covington #2 230kV line O/S Winter 2007 Heavy Loads Outage: 931 Temp: 25Fahrenheit Safe operating area Potentially safe operating area Unsafe operating areas Danger area: blind spot

Building a Combined 25F Nomogram Step 4: Evaluate the N>S Operating Areas Tacoma-Covington #2 230kV line O/S Winter 2007 Heavy Loads Outage: 931 Temp: 25Fahrenheit Safe operating area Potentially safe operating area Unsafe operating areas Danger area: blind spot

Building a Combined 25F Nomogram Step 5: Combine & identify blind spots Tacoma-Covington #2 230kV line O/S Winter 2007 Heavy Loads Outage: 931 Temp: 25Fahrenheit Safe operating area Potentially safe operating area Unsafe operating areas Danger area: blind spot N-2: Echo Lk-Maple VL/Rocky Rch-ML contingency will overload COVINGTN TO CRESTON CKT 1

Building a Combined 25F Nomogram Step 6: Combine all Operating Areas Tacoma-Covington #2 230kV line O/S Winter 2007 Heavy Loads Outage: 931 Temp: 25Fahrenheit Safe operating area Potentially safe operating area Unsafe operating areas Danger area: blind spot

Recommendations from draft report Phase 1 Recommendations: Develop an operating option for an Echo Lake-Maple Valley forced outage Explore options for each High Risk and Very High Risk nomogram to reduce the curtailment risk Review the Northern Intertie nomograms for negative operating points and implement operating practices to avoid these operating blind spots

Recommendations from draft report Phase 2 Recommendations: Establish a Transmission Adequacy Guideline for the Puget Sound Area Determine when the Puget Sound Area will need major system reinforcements to withstand All Lines in Service (N-0) and N-1 Operating Conditions. Develop portfolios of projects that would ensure that the Puget Sound Area system is able to meet the newly established PSA Transmission Adequacy Guideline;

Recommendations from draft report Phase 3 Recommendations: Investigate Nomogram study methodologies that treat Northern Intertie firm schedules as inputs, rather than outputs of the nomogram methodology.