SuRf Lab: (STFC) VTF Infrastructure and Process

Slides:



Advertisements
Similar presentations
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Advertisements

July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
WP : HIGH-BETA CAVITY DELIVERY A Wheelhouse ASTeC, STFC Daresbury Laboratory ESS SRF Elliptical Cavities Kick-Off Meeting CEA Saclay 15 th December.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Integration and Cold Testing of the CW ERL Cryomodule at Daresbury Shrikant Pattalwar ASTeC, STFC, Daresbury Laboratory (UK) On behalf of ERL Cryomodule.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
WP : High-Beta Cavity Delivery
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Operation Status of the RF Systems and Taiwan Photon Source
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
ESS Program Plan and Schedule Update
WP High Beta Cavities Delivery
Crab Cavity Technical Coordination meeting:
Spokesman's update.
Status of the M-ECCTD F. Peauger - P. Bosland
S1G Experiment Schedule Plan
Preliminary Review of LERF as Cryomodule Testing Facility for LCLS-II
Cryomodule test stand at ESS site
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
High-Beta cavity STATUS at DAREsbury laboratory
Archiving and Document Transfer Utilities
at STFC Daresbury laboratory
Crab Cavities Contribution from the U.S.
1.3-GHz Cavity Vacuum Furnace at IB4
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
Power coupler at DESY & for XFEL
Mark Pendleton – STFC Daresbury Laboratory
Uppsala Commitment to ESS and FREIA Planning
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
HEL – Safety aspects Christelle Gaignant
Progress and Issues with VTS Upgrade
SPS cryogenic proximity equipment and SM18 validation
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Test plan of ESS HB elliptical cavity
Test plan of ESS HB elliptical cavity
ESS RF Development at Uppsala University
Status of the cryogenic system for B180
UK RFD Pre-Series cryomodule
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
FRIB summary of performance degradation - VTA to cryomodule
SNS PPU Cryomodule Instrumentation
Daresbury ESS In-Kind Contributions
Overall time schedule of SRF activities
CTF Users’ Perspective
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.
Teleconference ACS – FREIA 19th June 2017
ESS Spoke cryomodule testing: cryogenic experience
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
Burst Disc Review Closeout 21 May 2019 J.G. Weisend II, Chairman.
Presentation transcript:

SuRf Lab: (STFC) VTF Infrastructure and Process SRF Collaboration Meeting: 25/06/2019 Mark Pendleton Paul Smith Andy May Dave Mason On Behalf of the SuRF Lab Team

Run-1 cryogenic performance ~36 hours for shield cooldown to 75K ~6 hours for cavity support insert cooldown to 4.2K

Run-1 cryogenic performance Excellent pressure and temperature stability under static load at 2 K with PID control of 2 K pumps +/- 0.1 mbar +/- 1 mK Stability under dynamic load to be investigated in forthcoming run

P02 Q vs T measurements

P02 Q vs Eacc Measurements

P02 Q vs Eacc Measurements

P02 Q vs Eacc Measurements Same calculation method used as CEA Saclay Good agreement within expt error bars Q-10-15% Eacc-5% Investigating the heat dissipated on the input probe at high power levels Series cavities have a Cu probe, whereas prototypes have a Ti probe-3xRs-3 times loss Radiation survey in progress- cant complete till P02 on top cradle

Radiation Survey Points Pole outside ESS Office Bunker wall pointing toward main offices Top of LHe dewar

Preliminary Radiation Survey Cavity P02 middle cradle RF Power level Incident (W) On the Lid μS/Hr   On the pole Bunker Wall LHe Dewar Mirion detector In Line mS/Hr Mirion Above Mirion below 46.9 580 0.85 25 0.4 170 40 96 2600 3.2 211 1.5 500-600

HOMS Cavity P02

Cleanroom Update Cleanroom build complete Commissioning and validation in progress. On - schedule. HPR final build phase w/c 1st July 2019

UPW system installed Ultra pure water system installation completed on-time and as per specifications. High pressure works on schedule to complete by 8th July 2019

Solution and proposal provided for Series Valve orientation : Valve orientation requirement at 45 Degree for CEA integration. Solution utilising 45 Degree elbow- fitted to each series cavity to suit STFC interface Meets original design spec for STFC modular cleanrooms RI to procure and install 88 elbows (STFC to implement change with RI) STFC to receive cavity with elbow installed and capped (Spec. TBA) STFC will ship to CEA with Elbow removed. (Spec TBA) CEA will prep and clean DN40 valve for CEA interface connections. Elbow solution for series cavities

High Level SuRf Lab commissioning schedule Run 2 Run 3 Run 4 Latest Schedule for commissioning with cavities available: *P01: Current status at CEA for testing mid July 2019. Arrival @ STFC TBC. * H001 First series dressed cavity tested at DESY due @ STFC 28th August 2019 Run 2 (22 – 26 July): De-risk: Rad survey completion (P02 Top cradle) and High Power Tests ~200W (localised cooling installed on flange) Run 3 (30 Aug – 26 Sep): P01 + P02 Commissioning Run 4 (17 – 27 Oct): P01 + P02 + H001 Commissioning Utilising P01 + P02 + H001 for commissioning and De-risk SuRf lab to review and update series schedule after Run 3

Objectives for Run 2 Use copper block to thermally anchor the flange-reduce temp rise Do we need to do a phase optimisation at high power If YES Perform Phase optimisation-then wait to cool Perform decay measurement then wait to cool (Like DESY) Just measure the transmitted power? If NO Just measure the transmitted power Perform Radiation Survey with P02 on top cradle & measure Rad

Commissioning and validation with Series cavities Proposal: 1st Quarter of 2020 will be utilised for verification and validation of STFC VTF with dressed HB002 + HB003 + HB004 tested from DESY. Commissioning times may be shortened dependant on Run3 conclusions. Di-Phase pipe cutting validation with DESY: HB001 (TBC) Box validated by STFC cavity production team Further De-risk testing strategies under consideration

Proposed annual testing and maintenance cycle Run 3 will be used for system optimisation Target to test 3 Cavities every 2 weeks (system design S.P) Schedule proposed for the testing over one year cycle Anticipated 66 tests per year with quarterly and yearly technical stops. Next steps to define STFC acceptance criteria for full validation

Target 2 week Cycle: Proposed 2 week cycle for Testing x3 cavities Linked for mapping resource Contingency built into the programme to allow cross-over of staff and uncertantites of the testing specifciation/duration i.e. Cavity processing time cut off 1 hr? Draft plan under development

Cavity workflow: Workstation (WS)

SuRF Lab QMS SuRf Lab Database under development for the STFC cavity workflow

Next Steps: Review lessons learnt from Run 1. Adapt Run 2/3 Update processes and procedures Update plans with new data to meet TA deadline. QMS: Commission data management system Completion of the workstations: procurement, installation, commissioning. Complete planning for the completion of CSI A for series cavities. 5’s type system for the SuRf Lab area Training of all staff; on the job and collaborator opportunities