Nicoletta Garelli & Gérard Cumer Coordination meeting #1 10th May 2019

Slides:



Advertisements
Similar presentations
Digital mock-up web. LHC DIGITAL MOCK_UP Lien actif.
Advertisements

CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
IMPACT Safety sub-working Group 1 Fernando B. S. Pedrosa IMWG – 07/Oct/2014 EDMS id:
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
Visit us at E mail: Tele: www.globalmanagergroup.com.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
CERN OPEN DAYS 27 – 29 SEPTEMBER 2013 ATLAS ACTIVITIES Point 1 Connie Potter.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
CERN Methodology document 1 Use of CERN CAD Exchange tool Process and rules for exchange of CAD files by using CERN CAD Exchange tool. Prepared by : B.
GS Annual Training plan D. Klem Big picture D. Klem 2 Purpose of Training has twofolds As defined in the SR&R :(SII 3.01) ‘The purpose of training.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
Drinking Water Infrastructure Needs Survey and Assessment 2007 Training.
AGH TRAINEE AT 01 JULY – 30 SEPTEMBER INTRODUCTION 1. CERN 2. Vacuum Group 3. ICM Section 4. My tasks 2Magdalena Karpiel.
Drinking Water Infrastructure Needs Survey and Assessment 2007 Website.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire R. Trant HSE Unit for ACCU Meeting R. Trant.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
In a small town, there are 2 industries: an electric company and a gas works electric Town gas.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
An introduction to Energy aspects at CERN June 2014.
Bienvenue à Swanshurst! Class 9Fr1 Name:. Enter the title of your presentation here Include some pictures and a welcome message.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Radiation Protection computing tools Gérald Dumont HSE/RP.
1.Definition 2.Examples 3.Hazards 4.Signage 5.Rule and permit 6.The role of the TSO HSE Unit - Olivier Prouteau CONFINED SPACES Updated in January.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
July 2014, TE-CRG-MLEDMS Naming Key Issues – List of Naming conventions in use QAC Naming Conventions Sub-committee Meeting n.2 S. Knoops QAC TE(-CRG)
Development of CAD concept model of package transformer substation (PTS) Aleksandra Seledkova Perm National Research Polytechnic University.
Click to edit Master title style Click to edit Master text styles – Second level Third level – Fourth level » Fifth level 1 Click to edit Master title.
Electrial Safety LS2 days November 2016 AP
SMB Service Status 113th ACCU Meeting
Some arrangements for personnel safety 1- Procedures for access
Safety in the Neutrino Platform Hall
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Background B513 built in early 1970’s for mainframe era.
Configuration Management and Layout Database ELENA Project
Logistics update 01 September Logistics update 01 September 2016.
YETS & LS2 Reminder G. Girardot 20 juin 2017.
De-cabling strategy during YETS
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
EP Experiments safety validation process Safety Permits
HL-LHC Safety Assessment Process
GIS Portal Racks Project
TECHjOSH.COM TechJosh.com.
Carrying out a HSE competence assessment in SAPphire: Guidance for Assessors This guidance has been prepared to assist assessors to use SAPpHiRe to carry.
2.03 Demonstrate desktop publishing.
Carrying out a HSE competence assessment in SAPphire: Guidance for Assessors This guidance has been prepared to assist assessors to use SAPpHiRe to carry.

Island Infrastructure: Freshwater System: 20 ft. dug well under influence of surface water Saltwater System: Supply sea tables, fire demand and toilets.
Ola Nordbeck Statistics Norway
Carrying out a HSE competence assessment in SAPphire: Guidance for Supervisors This guidance has been prepared to assist the supervisors of staff holding.
Magnet, Support and Infrastructure
Specifications What should it cover Goods Services Warranty
Flood hazard maps and Flood risk maps – next steps
List some of the famous sites in each of the countries you visit.
Student Design Competitions
If you haven’t turned in homework do so for grading.
Safety in the East Area Renovation Project
HOW TO REGISTER YOUR ACCOUNT
Open Days 2019 focus on underground visits sites
Meriem Chniba (HSE), Ana Godinho (IR)
Presentation transcript:

OD2019 LHC Visits Points, coordination PIS _ ODFLOW Open points and Questions Nicoletta Garelli & Gérard Cumer Coordination meeting #1 10th May 2019 10/05/2019 G. Cumer and N. Garelli

Supplies : Description Responsible ( ?) ODFLOW ? GIS ? Fournisseur ? Remarks Casques Y. Lechevin X   SCEM ? 4 couleurs pour les visites underground LHC TETRA D. Constant IT arbitrage Coreteam / HSE ? Bag lockers CERN Catalogue Magasins (55.50.70.535.9) Palettes pour Bag lockers possibilte de roulettes ? Barrieres infrastructures Barrieres visit point Food trucks V. Sogno y compris poubelles tri selectif… Tentes A.O. externe Toilettes WC IT equipments D. Bertola Electrical equipts SMB & EN/EL Chaises, Tables, Panneaux Beach Flags Signalitiques safety Signalitiques logistique Signalitiques "visit point" Posters F. Landua sur demande par email Which is the validation process before ordering the material? 10/05/2019 G. Cumer and N. Garelli

Layout technical description : After on-site validation, Y. Lechevin will populate GIS Portal with tents and barriers Who does populate the other items (e.g. toilets, internal barriers, etc. )? Once GIS is populated, who will inform the site managers ? Site managers will use GIS maps to make the final site layout ? The final site layouts will be entered into EDMS ? Y. Lechevin will create the EDMS location ? Who does create the document and which format ? 10/05/2019 G. Cumer and N. Garelli

10/05/2019