Pre-Proposal Meeting Request for Qualifications

Slides:



Advertisements
Similar presentations
Page 1 BUS TEST FLEETS Capital Program Oversight Committee March, 2011 Department of Buses.
Advertisements

Managing a Successful Mechanical System project Following design – what next?
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR August 27, 2013.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR April 25, 2014.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
HUDSON-BERGEN LIGHT RAIL TRANSIT SYSTEM HUDSON-BERGEN LIGHT RAIL TRANSIT SYSTEM Facts and Highlights Facts and Highlights.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
PRINCE WILLIAM COUNTY PUBLIC SCHOOLS. SCHOOL DIVISION WIDE ENROLLMENT FORECAST CURRENT SCHOOL CAPACITY568 Students FORECAST ENROLLMENTDEFICIT 2007 School.
Galveston Seawall Boulevard Transit/Pedestrian Access and Beautification Program PHASE 2 IMPLEMENTATION UPDATE PHASE 2 IMPLEMENTATION UPDATE February 12,
STUDENT UNION PROJECT. PROJECT TIMELINE Phase 1 - May 17, 2010 site work begins Phase 2 - August 2010 to November 2011 building construction period Phase.
Swift BUS RAPID TRANSIT (BRT) ITS Washington November 12, 2008.
Anaheim Regional Transportation Intermodal Center Project Update.
Brio Rapid Transit System Update on Stations and Timetables July 10, 2012.
Innovative Solutions for tomorrow’s transportation needs Local Agency Program Performance Measures, Project Scheduling, and Efficient Project Delivery.
1 August Accomplishments Conducted the 4 th Urban Design Committee meeting, which consisted of a tour of the Metro Orange Line. Conducted one-on-one briefings.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
M. Gilchriese Overview of Production Plan for Pixel Global Support and Disk Support Rings M. G. D. Gilchriese Lawrence Berkeley National Laboratory February.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
July Accomplishments: Authority and Design Build Contractor staff conducted the 3rd Urban Design committee meeting. Committee members viewed proposed station.
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
February’s Accomplishments Met extensively with FTA staff and received the Record of Decision from FTA Finalized Negotiations with the top ranked Design.
VOWTAP Progress Report VOWDA December 2, DOE Grants VOWTAP Extension No Cost Time Extension until May 31, 2016 Conditional upon achievement of two.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
DAVIS SR. HIGH SCHOOL ALL-STUDENT CENTER (MULTIPURPOSE BUILDING) PROGRAMMING OPTIONS August 6, 2015.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Geary Bus Rapid Transit Project Presentation to the San Francisco.
ESPLOST Update Savannah-Chatham County Public Schools March 5, 2008.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
WORKPLACE SAFETY PROGRAM AGENDA SECURITY PROTOCOLS AND EVACUATIONS WORKPLACE SAFETY AUDITS MAINTENANCE INJURY EXPERIENCE MANDATORY PROTECTIVE EQUIPMENT.
US 36 Bus Rapid Transit RTD Board Update January 6, 2015.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
Southeast Rail Extension Update RTD Board of Directors FasTracks Monitoring Committee March 3, 2015.
Cyber Security Studies Building 4/1/20161 Groundbreaking - Oct 21, 2016.
Today’s Transit for Tomorrow’s World
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Green Line Train Protection System
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Fred George Basin Greenway
Pre-Construction Services
CONTRACT DOCUMENTS & CONSTRUCTION
Memorandum of Understanding with GE Osmonics, Inc
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
MARINE PARK TO TAKU DOCK URBAN DESIGN PLAN
TRIPARTITE PARTNERSHIP PROJECT
D Line TAC Meeting #1: D Line Rapid Bus Project Planning City of Richfield Transportation Commission July 12, 2017 Katie Roth, Project Manager.
Designers’ Manual Overview and Chapter Contents
GM Remarks Fiscal and Management Control Board September 11, 2017.
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Issaquah-Fall City Road
D Line and Station Plan overview
David Salazar, Chief Facilities Executive
RTD Procurement and Construction Management Oversight for FasTracks
Southern Delivery System
RTD Procurement and Construction Management Oversight for FasTracks
Student Transportation Services
2040 Regional Transportation Plan Sparks Citizens Advisory Board
School Building Committee – December 17, 2018 Design Development Phase
Multi-discipline academic research science technology engineering & math (stem) building project phase 1 NAU Project No RFQ for Construction.
RTC RIDE Service Improvement Recommendations
Southwood/Fargo Country Club Flood Risk Management Project
Award of Contract M06013C04 Project Management Information System (PMIS) Licensing, Maintenance and Service Agreement Commission Agenda Item #13.
I Street Bridge Replacement Project
Presentation transcript:

Pre-Proposal Meeting Request for Qualifications Community Outreach & Public Engagement Services East Bay Bus Rapid Transit Project Pre-Proposal Meeting June 14, 2016

BRT PROGRAM – Major Milestones EQUIPMENT: New Flyer bus pre-production activities started April 26, 2016 DESIGN AND CONSTRUCTION: Bid Package 1 - Advance Utilities: Complete Bid Package 2 - Parking Lots and Fruitvale Bypass: Substantially Complete Bid Package 3 - Design Complete; NTP Issued, Caltrans Rider Encroachment Permit received, Contractor submittal phase underway

Bid Package 3 – Roadmap to Construction OC Jones Contract Awarded: March 14, 2016 Construction NTP: April 26, 2016 Milestone #1: Segment A (Phases 1 & 2) – Summer 2017 Milestone #2: Segment B (Phases 3 & 4) – Spring 2018 Milestone #3: Final Lift of Pavement, Perform System Testing – Spring 2018 Milestone #4: San Leandro Transit Center Complete – Fall 2017 Milestone #5: Northern Layover Complete – Fall 2017 Milestone #6a: Final Testing, Commissioning - Fall 2017 Target Revenue Service – November 2017 Milestone #6b: All Landscaping, Hardscaping, Project Closeout – Spring 2018 Alternate Revenue Service – Proposed first phase Nov 2017, second phase Jan 2018, final phase April 2018

Planned Project Schedule

Construction Sequencing and Staging Plan

Vehicle Procurement - New Flyer BRT 5-Door Bus. District Board Awarded Contract to New Flyer on October 28, 2015 Pre-production workshop held April 26-27, 2016 New Flyer is the leading manufacturer of heavy-duty buses in the U.S. & Canada; the 60-foot articulated Advanced Style BRT “Xcelsior” model to be utilized Two Buses are forecasted to arrive in November 2016 for operator training Two additional buses to arrive in March 2017 for systems integration testing Remaining Buses to arrive over the course of the following year through October 2017 Total of 27 Buses being procured

Q & A